Pricing Schedule -W912PB20Q3194.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Landfill Maintenance & Monitoring Services (Grafenwoehr)
Solicitation number
W912PB-20-Q-3194
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MMSL_BY

ELIN / PRICING Schedule
CONTRACT POP: 01 January 2021 - 31 December 2021
Base Year (FY21)
CLINELIN NoDESCRIPTIONQTYU/IUNITTOTAL
PRICEAMOUNT
EUROEURO
0001A001Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS, Paragraph 5.2.1 - 5.2.1.3
A001AAPreparation of the landill surface are for measurement1EA
A001ABMeasurement (FID) of the landfill gas1EA
A001ACDocumentation1EA
0002A002Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS, Paragraph 5.2.2 - 5.2.2.13
A002AATV-Inspection of leachate water lines outside the sealed landfill area (total length - 880.7 meter)1SV
A002ABSemi-annual flushing and cleaning of leachate water lines (880.7 meters) outside the sealed landfill area2SV
A002ACSemi-annual flushing and cleaning of leachate water control shafts (30ea) outside the sealed landfill area2SV
A002ADPreparation of shaft documentation papers and sewer sections report28EA
A002AETV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-743 meter)1SV
A002AFPreparation of inspection reports for the control drainage lines inside the sealed landfill area8EA
A002AGTV-inspection of leachate water drainages inside the landfill area (total length - 991.1 meter)1SV
A002AHSemi-annual flushing and cleaning of the leachate water drainage lines (991,1 meters) inside the sealed landfill area2SV
A002AIPreparation of inspection reports of the Video inspected leachate water lines within the landfill area12EA
A002AJTightness inspection of leachate water carrying lines outside the sealed landfill area (total length-880.7 meter)1SV
A002AKPreparation of Tightness Test Protocols for each shaft28EA
A002ALInspection of the leachate water control shafts for constructual and operational function/condition28EA
A002AMReconsideration of tighness test if tests are negative3EA
A002ANSemi-annual cleaning services at the leachate water basin at Building 7162SV
A002AOFlushing of storm sewer lines at the landfill entrance area (total length-749.13 meter)1SV
A002APCleaning of 18 ea shafts within the landfill entrance area1SV
A002AQFlushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (557,12 meters) and the condensing water shaft (1) in front of Bldg.7171SV
A002ARPumping and cleaning of the reserve leachate water basin near Building 7161SV
A002ASSemi-annual flushing of lines in filling field 18 (total length-31 meter)2SV
A002ATSemi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 7172SV
A002AVFlushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts1SV
A002AWAnnual Measurement of the Inside Temperature of all leachate Water Lines1SV
A002AXFlushing and cleaning of the vehicle scale1SV
A002AYRecording and preparation video DVD's for all TV-Inspections1SV
0003A003Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS,Paragraph 5.2.3 - 5.2.3.2.5
A003AABi-weekly function control of the Gas Torch24SV
A003ABQuarterly Maintenece and Safety Inspection2SV
A003ACSemi-Annual control for damages of the gas control station and gas collectors1SV
A003ADAnnual Maintenance anad performance of the landfill gas analysis1SV
A003AEGas Torch Emmission Measurement (Basic Year only)1SV
0004A004Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS, Paragraph 5.2.4 - 5.2.4.5
A004AABi-Weekly servicing of 26 each Gas Wells24EA
A004ABBi-Weekly servicing of 5 each Horizontal Gas Pipes24EA
A004ACBi-weekly control and adjust Flap Position24EA
A004ADBi-weekly control of 5 each Condensate Collection Vats12SV
A004ADBi-weekly gas analysis24EA
0005Time & Material - Labor Hours
Performance of repair work IAW the PWS Paragraph 5.3
Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required50HR
0006Time & Material -Spare Parts
Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS, Paragraph 5.2.31LS
NOTE: THE AMOUNT FOR THIS CLIN WILL BE INSERTED AT TIME OF AWARD.

(GOVERNMENT SET AMOUNT DO NOT INSERT PRICE FOR THIS CLIN)

0007Performance of On-Call Services / Troubleshooting
Perfromance of On-Call Sevices and Troubleshooting IAW the PWS, Paragraph 5.45SV
0008Documentation
Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary of all test results for the submission to the controlling authorities IAW the PWS1SV
Consolidation:
CLIN 0001 (A001AA - A001AC)€ 0.00
CLIN 0002 (A002AA - A002AY)€ 0.00
CLIN 0003 (A003AA - A003AE)€ 0.00
CLIN 0004 (A004AA - A004AD)€ 0.00
CLIN 0005 T&M - Labor Hours€ 0.00
CLIN 0006 T&M - Spare Parts (DO NOT INSERT PRICE FOR THIS CLIN)€ 0.00
CLIN 0007 ON-Call-Services€ 0.00
CLIN 0008 Documentation€ 0.00
Total CLIN 0001 - CLIN 0008€ 0.00

MMSL_1st OY

ELIN / PRICING Schedule
CONTRACT POP: 01 January 2022 - 31 December 2022
1st Option Year (FY22)
CLINELIN NoDESCRIPTIONQTYU/IUNITTOTAL
PRICEAMOUNT
EUROEURO
1001A001Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS, Paragraph 5.2.1 - 5.2.1.3
A001AAPreparation of the landill surface are for measurement1EA
A001ABMeasurement (FID) of the landfill gas1EA
A001ACDocumentation1EA
1002A002Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS, Paragraph 5.2.2 - 5.2.2.13
A002AATV-Inspection of leachate water lines outside the sealed landfill area (total length - 880.7 meter)1SV
A002ABSemi-annual flushing and cleaning of leachate water lines (880.7 meters) outside the sealed landfill area2SV
A002ACSemi-annual flushing and cleaning of leachate water control shafts (30ea) outside the sealed landfill area2SV
A002ADPreparation of shaft documentation papers and sewer sections report28EA
A002AETV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-743 meter)1SV
A002AFPreparation of inspection reports for the control drainage lines inside the sealed landfill area8EA
A002AGTV-inspection of leachate water drainages inside the landfill area (total length - 991.1 meter)1SV
A002AHSemi-annual flushing and cleaning of the leachate water drainage lines (991,1 meters) inside the sealed landfill area2SV
A002AIPreparation of inspection reports of the Video inspected leachate water lines within the landfill area12EA
A002AJTightness inspection of leachate water carrying lines outside the sealed landfill area (total length-880.7 meter)1SV
A002AKPreparation of Tightness Test Protocols for each shaft28EA
A002ALInspection of the leachate water control shafts for constructual and operational function/condition28EA
A002AMReconsideration of tighness test if tests are negative3EA
A002ANSemi-annual cleaning services at the leachate water basin at Building 7162SV
A002AOFlushing of storm sewer lines at the landfill entrance area (total length-749.13 meter)1SV
A002APCleaning of 18 ea shafts within the landfill entrance area1SV
A002AQFlushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (557,12 meters) and the condensing water shaft (1) in front of Bldg.7171SV
A002ARPumping and cleaning of the reserve leachate water basin near Building 7161SV
A002ASSemi-annual flushing of lines in filling field 18 (total length-31 meter)2SV
A002ATSemi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 7172SV
A002AVFlushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts1SV
A002AWAnnual Measurement of the Inside Temperature of all leachate Water Lines1SV
A002AXFlushing and cleaning of the vehicle scale1SV
A002AYRecording and preparation video DVD's for all TV-Inspections1SV
1003A003Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS,Paragraph 5.2.3 - 5.2.3.2.5
A003AABi-weekly function control of the Gas Torch24SV
A003ABQuarterly Maintenece and Safety Inspection2SV
A003ACSemi-Annual control for damages of the gas control station and gas collectors1SV
A003ADAnnual Maintenance and performance of the landfill gas analysis1SV
1004A004Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS, Paragraph 5.2.4 - 5.2.4.5
A004AABi-Weekly servicing of 26 each Gas Wells24EA
A004ABBi-Weekly servicing of 5 each Horizontal Gas Pipes24EA
A004ACBi-weekly control and adjust Flap Position24EA
A004ADBi-weekly control of 5 each Condensate Collection Vats12SV
A004ADBi-weekly gas analysis24EA
1005Time & Material - Labor Hours
Performance of repair work IAW the PWS Paragraph 5.3
Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required50HR
1006Time & Material -Spare Parts1LS
Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS, Paragraph 5.2.3
NOTE: THE AMOUNT FOR THIS CLIN WILL BE INSERTED AT TIME OF AWARD.

(GOVERNMENT SET AMOUNT DO NOT INSERT PRICE FOR THIS CLIN)

1007Performance of On-Call Services / Troubleshooting5SV
Perfromance of On-Call Sevices and Troubleshooting IAW the PWS, Paragraph 5.4
1008Documentation
Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary of all test results for the submission to the controlling authorities IAW the PWS1SV
Consolidation:
CLIN 0001 (A001AA - A001AC)€ 0.00
CLIN 0002 (A002AA - A002AY)€ 0.00
CLIN 0003 (A003AA - A003AE)€ 0.00
CLIN 0004 (A004AA - A004AD)€ 0.00
CLIN 0005 T&M - Labor Hours€ 0.00
CLIN 0006 T&M - Spare Parts (DO NOT INSERT PRICE FOR THIS CLIN)€ 0.00
CLIN 0007 ON-Call-Services€ 0.00
CLIN 0008 Documentation€ 0.00
Total CLIN 0001 - CLIN 0008€ 0.00

MMSL_2nd OY

ELIN / PRICING Schedule
CONTRACT POP: 01 January 2023 - 31 December 2023
2nd Option Year (FY23)
CLINELIN NoDESCRIPTIONQTYU/IUNITTOTAL
PRICEAMOUNT
EUROEURO
2001A001Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS, Paragraph 5.2.1 - 5.2.1.3
A001AAPreparation of the landill surface are for measurement1EA
A001ABMeasurement (FID) of the landfill gas1EA
A001ACDocumentation1EA
2002A002Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS, Paragraph 5.2.2 - 5.2.2.13
A002AATV-Inspection of leachate water lines outside the sealed landfill area (total length - 880.7 meter)1SV
A002ABSemi-annual flushing and cleaning of leachate water lines (880.7 meters) outside the sealed landfill area2SV
A002ACSemi-annual flushing and cleaning of leachate water control shafts (30ea) outside the sealed landfill area2SV
A002ADPreparation of shaft documentation papers and sewer sections report28EA
A002AETV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-743 meter)1SV
A002AFPreparation of inspection reports for the control drainage lines inside the sealed landfill area8EA
A002AGTV-inspection of leachate water drainages inside the landfill area (total length - 991.1 meter)1SV
A002AHSemi-annual flushing and cleaning of the leachate water drainage lines (991,1 meters) inside the sealed landfill area2SV
A002AIPreparation of inspection reports of the Video inspected leachate water lines within the landfill area12EA
A002AJTightness inspection of leachate water carrying lines outside the sealed landfill area (total length-880.7 meter)1SV
A002AKPreparation of Tightness Test Protocols for each shaft28EA
A002ALInspection of the leachate water control shafts for constructual and operational function/condition28EA
A002AMReconsideration of tighness test if tests are negative3EA
A002ANSemi-annual cleaning services at the leachate water basin at Building 7162SV
A002AOFlushing of storm sewer lines at the landfill entrance area (total length-749.13 meter)1SV
A002APCleaning of 18 ea shafts within the landfill entrance area1SV
A002AQFlushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (557,12 meters) and the condensing water shaft (1) in front of Bldg.7171SV
A002ARPumping and cleaning of the reserve leachate water basin near Building 7161SV
A002ASSemi-annual flushing of lines in filling field 18 (total length-31 meter)2SV
A002ATSemi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 7172SV
A002AVFlushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts1SV
A002AWAnnual Measurement of the Inside Temperature of all leachate Water Lines1SV
A002AXFlushing and cleaning of the vehicle scale1SV
A002AYRecording and preparation video DVD's for all TV-Inspections1SV
2003A003Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS,Paragraph 5.2.3 - 5.2.3.2.5
A003AABi-weekly function control of the Gas Torch24SV
A003ABQuarterly Maintenece and Safety Inspection2SV
A003ACSemi-Annual control for damages of the gas control station and gas collectors1SV
A003ADAnnual Maintenance and performance of the landfill gas analysis1SV
2004A004Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS, Paragraph 5.2.4 - 5.2.4.5
A004AABi-Weekly servicing of 26 each Gas Wells24EA
A004ABBi-Weekly servicing of 5 each Horizontal Gas Pipes24EA
A004ACBi-weekly control and adjust Flap Position24EA
A004ADBi-weekly control of 5 each Condensate Collection Vats12SV
A004ADBi-weekly gas analysis24EA
2005Time & Material - Labor Hours
Performance of repair work IAW the PWS Paragraph 5.3
Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required50HR
2006Time & Material -Spare Parts1LS
Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS, Paragraph 5.2.3 NOTE: THE AMOUNT FOR THIS CLIN WILL BE INSERTED AT TIME OF AWARD.

(GOVERNMENT SET AMOUNT DO NOT INSERT PRICE FOR THIS CLIN)

2007Performance of On-Call Services / Troubleshooting5SV
Perfromance of On-Call Sevices and Troubleshooting IAW the PWS, Paragraph 5.4
2008Documentation
Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary of all test results for the submission to the controlling authorities IAW the PWS1SV
Consolidation:
CLIN 0001 (A001AA - A001AC)€ 0.00
CLIN 0002 (A002AA - A002AY)€ 0.00
CLIN 0003 (A003AA - A003AE)€ 0.00
CLIN 0004 (A004AA - A004AD)€ 0.00
CLIN 0005 T&M - Labor Hours€ 0.00
CLIN 0006 T&M - Spare Parts (DO NOT INSERT PRICE FOR THIS CLIN)€ 0.00
CLIN 0007 ON-Call-Services€ 0.00
CLIN 0008 Documentation€ 0.00
Total CLIN 0001 - CLIN 0008€ 0.00

Sheet1

CHANGE REQUEST
for Contract # W912PB-08-0014, 2nd Option
Following Line Item must be changed:
ITEMDESCRIPTIONQUANTITYU/IUNITTOTAL
Following Line Item must be changed:
2003Operation of the Recycling Yard in2MO
accordance with Performance Work
Statement, para 2.5.
Operation days: Monday thru Saturday
Fixed Service

Following Line Item must be added:

2010Operation of the Recycling Yard in10MO
accordance with Performance Work
Statement, para 2.5.
Operation days: Tuesday/Thursday/Saturday
Fixed Service

File details come from the government source that posted it. Updated .