Pricing Schedule -W912PB20Q3194.pdf
PDF 87 KB Posted
- Solicitation number
- W912PB-20-Q-3194
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS -W912PB20Q3194.pdf | ||
| Technical Exhibit 01A thru 02 - W912PB20Q3194.pdf | ||
| W912PB-20-Q-3194 Solicitation.pdf | ||
| Attachment 01 - Contractor AT-iWatch-OPSEC Confirmation.pdf | ||
| Pricing Schedule -W912PB20Q3194.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year (FY21)
CLIN ELIN No DESCRIPTION QTY U/I UNIT TOTAL
PRICE AMOUNT
EURO EURO
0001 A001 Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS, Paragraph 5.2.1 - 5.2.1.3
A001AA Preparation of the landill surface are for measurement 1 EA
A001AB Measurement (FID) of the landfill gas 1 EA
A001AC Documentation 1 EA
0002 A002 Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS, Paragraph 5.2.2 - 5.2.2.13
A002AA TV-Inspection of leachate water lines outside the sealed landfill area (total length - 880.7 meter)
1 SV
A002AB Semi-annual flushing and cleaning of leachate water lines (880.7 meters) outside the sealed landfill area
2 SV
A002AC Semi-annual flushing and cleaning of leachate water control shafts (30ea) outside the sealed landfill area
2 SV
A002AD Preparation of shaft documentation papers and sewer sections report
28 EA
A002AE TV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-743 meter)
1 SV
A002AF Preparation of inspection reports for the control drainage lines inside the sealed landfill area
8 EA
A002AG TV-inspection of leachate water drainages inside the landfill area (total length - 991.1 meter)
1 SV
A002AH Semi-annual flushing and cleaning of the leachate water drainage lines (991,1 meters) inside the sealed landfill area
2 SV
A002AI Preparation of inspection reports of the Video inspected leachate water lines within the landfill area
12 EA
A002AJ Tightness inspection of leachate water carrying lines outside the sealed landfill area (total length-880.7 meter)
1 SV
A002AK Preparation of Tightness Test Protocols for each shaft 28 EA
A002AL Inspection of the leachate water control shafts for constructual and operational function/condition
28 EA
A002AM Reconsideration of tighness test if tests are negative 3 EA
A002AN Semi-annual cleaning services at the leachate water basin at Building 716
2 SV
A002AO Flushing of storm sewer lines at the landfill entrance area (total length-749.13 meter)
1 SV
A002AP Cleaning of 18 ea shafts within the landfill entrance area 1 SV
A002AQ Flushing of storm sewer lines at the shredder plant facility Bldg.
710 and Bldg. 720 (557,12 meters) and the condensing water shaft (1) in front of Bldg.717
1 SV
A002AR Pumping and cleaning of the reserve leachate water basin near Building 716
1 SV
A002AS Semi-annual flushing of lines in filling field 18 (total length-31 meter)
2 SV
CONTRACT POP: 01 January 2021 - 31 December 2021
ELIN / PRICING Schedule
A002AT Semi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 717
2 SV
A002AV Flushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts
1 SV
A002AW Annual Measurement of the Inside Temperature of all leachate Water Lines
1 SV
A002AX Flushing and cleaning of the vehicle scale 1 SV
A002AY Recording and preparation video DVD's for all TV-Inspections 1 SV
0003 A003 Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS,Paragraph 5.2.3 - 5.2.3.2.5
A003AA Bi-weekly function control of the Gas Torch 24 SV
A003AB Quarterly Maintenece and Safety Inspection 2 SV
A003AC Semi-Annual control for damages of the gas control station and gas collectors
1 SV
A003AD Annual Maintenance anad performance of the landfill gas analysis
1 SV
A003AE Gas Torch Emmission Measurement (Basic Year only) 1 SV
0004 A004 Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS, Paragraph 5.2.4 - 5.2.4.5
A004AA Bi-Weekly servicing of 26 each Gas Wells 24 EA
A004AB Bi-Weekly servicing of 5 each Horizontal Gas Pipes 24 EA
A004AC Bi-weekly control and adjust Flap Position 24 EA
A004AD Bi-weekly control of 5 each Condensate Collection Vats 12 SV
A004AD Bi-weekly gas analysis 24 EA
0005 Time & Material - Labor Hours
Performance of repair work IAW the PWS Paragraph 5.3 Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required
50 HR
0006 Time & Material -Spare Parts
Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS, Paragraph 5.2.3
1 LS
NOTE: THE AMOUNT FOR THIS CLIN WILL BE INSERTED AT
TIME OF AWARD.
(GOVERNMENT SET AMOUNT DO NOT INSERT PRICE FOR
THIS CLIN)
0007 Performance of On-Call Services / Troubleshooting Perfromance of On-Call Sevices and Troubleshooting IAW the PWS, Paragraph 5.4
5 SV
0008 Documentation Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary of all test results for the submission to the controlling authorities IAW the PWS
1 SV
€ 0.00
€ 0.00
€ 0.00
€ 0.00
€ 0.00
€ 0.00
€ 0.00
Total CLIN 0001 - CLIN 0008 € 0.00
Consolidation:
CLIN 0001 (A001AA - A001AC)
CLIN 0002 (A002AA - A002AY)
CLIN 0003 (A003AA - A003AE)
CLIN 0004 (A004AA - A004AD)
CLIN 0005 T&M - Labor Hours
CLIN 0008 Documentation
CLIN 0007 ON-Call-Services
CLIN 0006 T&M - Spare Parts (DO NOT INSERT PRICE FOR THIS CLIN)
1st Option Year (FY22)
PRICE AMOUNT
EURO EURO
1001 A001 Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS, Paragraph 5.2.1 - 5.2.1.3
A001AA Preparation of the landill surface are for measurement 1 EA
A001AB Measurement (FID) of the landfill gas 1 EA
A001AC Documentation 1 EA
1002 A002 Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS, Paragraph 5.2.2 - 5.2.2.13
A002AA TV-Inspection of leachate water lines outside the sealed landfill area (total length - 880.7 meter)
1 SV
A002AB Semi-annual flushing and cleaning of leachate water lines (880.7 meters) outside the sealed landfill area
2 SV
A002AC Semi-annual flushing and cleaning of leachate water control shafts (30ea) outside the sealed landfill area
2 SV
A002AD Preparation of shaft documentation papers and sewer sections report
28 EA
A002AE TV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-743 meter)
1 SV
A002AF Preparation of inspection reports for the control drainage lines inside the sealed landfill area
8 EA
A002AG TV-inspection of leachate water drainages inside the landfill area (total length - 991.1 meter)
1 SV
A002AH Semi-annual flushing and cleaning of the leachate water drainage lines (991,1 meters) inside the sealed landfill area
2 SV
A002AI Preparation of inspection reports of the Video inspected leachate water lines within the landfill area
12 EA
A002AJ Tightness inspection of leachate water carrying lines outside the sealed landfill area (total length-880.7 meter)
1 SV
A002AK Preparation of Tightness Test Protocols for each shaft 28 EA
A002AL Inspection of the leachate water control shafts for constructual and operational function/condition
28 EA
A002AM Reconsideration of tighness test if tests are negative 3 EA
A002AN Semi-annual cleaning services at the leachate water basin at Building 716
2 SV
A002AO Flushing of storm sewer lines at the landfill entrance area (total length-749.13 meter)
1 SV
A002AP Cleaning of 18 ea shafts within the landfill entrance area 1 SV
A002AQ Flushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (557,12 meters) and the condensing water shaft (1) in front of Bldg.717
1 SV
A002AR Pumping and cleaning of the reserve leachate water basin near Building 716
1 SV
A002AS Semi-annual flushing of lines in filling field 18 (total length-31 meter)
2 SV
CONTRACT POP: 01 January 2022 - 31 December 2022
A002AT Semi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 717
2 SV
A002AV Flushing of the leachate water pressure lines (total length- 1,329 meter) and cleaning of 15 each shafts
1 SV
A002AW Annual Measurement of the Inside Temperature of all leachate Water Lines
1 SV
A002AX Flushing and cleaning of the vehicle scale 1 SV
A002AY Recording and preparation video DVD's for all TV-Inspections 1 SV
1003 A003 Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS,Paragraph 5.2.3 - 5.2.3.2.5
A003AA Bi-weekly function control of the Gas Torch 24 SV
A003AB Quarterly Maintenece and Safety Inspection 2 SV
A003AC Semi-Annual control for damages of the gas control station and gas collectors
1 SV
A003AD Annual Maintenance and performance of the landfill gas analysis
1 SV
1004 A004 Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS, Paragraph 5.2.4 - 5.2.4.5
A004AA Bi-Weekly servicing of 26 each Gas Wells 24 EA
A004AB Bi-Weekly servicing of 5 each Horizontal Gas Pipes 24 EA
A004AC Bi-weekly control and adjust Flap Position 24 EA
A004AD Bi-weekly control of 5 each Condensate Collection Vats 12 SV
A004AD Bi-weekly gas analysis 24 EA
1005 Time & Material - Labor Hours
Performance of repair work IAW the PWS Paragraph 5.3 Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required
50 HR
1006 Time & Material -Spare Parts 1 LS
Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS, Paragraph 5.2.3
NOTE: THE AMOUNT FOR THIS CLIN WILL BE INSERTED
AT TIME OF AWARD.
(GOVERNMENT SET AMOUNT DO NOT INSERT PRICE
FOR THIS CLIN)
1007 Performance of On-Call Services / Troubleshooting 5 SV
Perfromance of On-Call Sevices and Troubleshooting IAW the PWS, Paragraph 5.4
1008 Documentation Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary of all test results for the submission to the controlling authorities IAW the PWS
€ 0.00
€ 0.00
€ 0.00
€ 0.00
€ 0.00
€ 0.00
Total CLIN 0001 - CLIN 0008 € 0.00
Consolidation:
CLIN 0001 (A001AA - A001AC)
CLIN 0002 (A002AA - A002AY)
CLIN 0003 (A003AA - A003AE)
CLIN 0004 (A004AA - A004AD)
CLIN 0005 T&M - Labor Hours
CLIN 0006 T&M - Spare Parts (DO NOT INSERT PRICE FOR THIS CLIN)
CLIN 0008 Documentation
2nd Option Year (FY23)
PRICE AMOUNT
EURO EURO
2001 A001 Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS, Paragraph 5.2.1 - 5.2.1.3
A001AA Preparation of the landill surface are for measurement 1 EA
A001AB Measurement (FID) of the landfill gas 1 EA
A001AC Documentation 1 EA
2002 A002 Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS, Paragraph 5.2.2 - 5.2.2.13
A002AA TV-Inspection of leachate water lines outside the sealed landfill area (total length - 880.7 meter)
1 SV
A002AB Semi-annual flushing and cleaning of leachate water lines (880.7 meters) outside the sealed landfill area
2 SV
A002AC Semi-annual flushing and cleaning of leachate water control shafts (30ea) outside the sealed landfill area
2 SV
A002AD Preparation of shaft documentation papers and sewer sections report
28 EA
A002AE TV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-743 meter)
1 SV
A002AF Preparation of inspection reports for the control drainage lines inside the sealed landfill area
8 EA
A002AG TV-inspection of leachate water drainages inside the landfill area (total length - 991.1 meter)
1 SV
A002AH Semi-annual flushing and cleaning of the leachate water drainage lines (991,1 meters) inside the sealed landfill area
2 SV
A002AI Preparation of inspection reports of the Video inspected leachate water lines within the landfill area
12 EA
A002AJ Tightness inspection of leachate water carrying lines outside the sealed landfill area (total length-880.7 meter)
1 SV
A002AK Preparation of Tightness Test Protocols for each shaft 28 EA
A002AL Inspection of the leachate water control shafts for constructual and operational function/condition
28 EA
A002AM Reconsideration of tighness test if tests are negative 3 EA
A002AN Semi-annual cleaning services at the leachate water basin at Building 716
2 SV
A002AO Flushing of storm sewer lines at the landfill entrance area (total length-749.13 meter)
1 SV
A002AP Cleaning of 18 ea shafts within the landfill entrance area 1 SV
A002AQ Flushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (557,12 meters) and the condensing water shaft (1) in front of Bldg.717
1 SV
A002AR Pumping and cleaning of the reserve leachate water basin near Building 716
1 SV
CONTRACT POP: 01 January 2023 - 31 December 2023
A002AS Semi-annual flushing of lines in filling field 18 (total length-31 meter)
2 SV
A002AT Semi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 717
2 SV
A002AV Flushing of the leachate water pressure lines (total length- 1,329 meter) and cleaning of 15 each shafts
1 SV
A002AW Annual Measurement of the Inside Temperature of all leachate Water Lines
1 SV
A002AX Flushing and cleaning of the vehicle scale 1 SV
A002AY Recording and preparation video DVD's for all TV-Inspections 1 SV
2003 A003 Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS,Paragraph 5.2.3 - 5.2.3.2.5
A003AA Bi-weekly function control of the Gas Torch 24 SV
A003AB Quarterly Maintenece and Safety Inspection 2 SV
A003AC Semi-Annual control for damages of the gas control station and gas collectors
1 SV
A003AD Annual Maintenance and performance of the landfill gas analysis
1 SV
2004 A004 Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS, Paragraph 5.2.4 - 5.2.4.5
A004AA Bi-Weekly servicing of 26 each Gas Wells 24 EA
A004AB Bi-Weekly servicing of 5 each Horizontal Gas Pipes 24 EA
A004AC Bi-weekly control and adjust Flap Position 24 EA
A004AD Bi-weekly control of 5 each Condensate Collection Vats 12 SV
A004AD Bi-weekly gas analysis 24 EA
2005 Time & Material - Labor Hours
Performance of repair work IAW the PWS Paragraph 5.3 Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required
50 HR
2006 Time & Material -Spare Parts 1 LS
Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS, Paragraph 5.2.3 NOTE: THE AMOUNT FOR
THIS CLIN WILL BE INSERTED AT TIME OF AWARD.
(GOVERNMENT SET AMOUNT DO NOT INSERT PRICE
FOR THIS CLIN)
2007 Performance of On-Call Services / Troubleshooting 5 SV
Perfromance of On-Call Sevices and Troubleshooting IAW the PWS, Paragraph 5.4
2008 Documentation Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary of all test results for the submission to the controlling authorities IAW the PWS
€ 0.00
€ 0.00
€ 0.00
€ 0.00
€ 0.00
€ 0.00
Total CLIN 0001 - CLIN 0008 € 0.00
Consolidation:
CLIN 0001 (A001AA - A001AC)
CLIN 0002 (A002AA - A002AY)
CLIN 0003 (A003AA - A003AE)
CLIN 0004 (A004AA - A004AD)
CLIN 0005 T&M - Labor Hours
CLIN 0006 T&M - Spare Parts (DO NOT INSERT PRICE FOR THIS CLIN)
CLIN 0008 Documentation
File details come from the government source that posted it. Updated .