Pricing Schedule.pdf
PDF 100 KB Posted
- Attached to
- Narrows 1 Gate Hoist Repair at Englebright Lake
- Solicitation number
- W9123821Q0024
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS - Narrows 1 Gate Hoist Repair.pdf | ||
| Solicitation 21Q0024.pdf | ||
| W9123821Q0024 Combined Synopsis.pdf | ||
| Solicitation 21Q0024.pdf | ||
| W9123821Q0024 Combined Synopsis.pdf | ||
| PPQ Appendix A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING SCHEDULE Quantity Unit Price UOM Total Cost CLIN Description 0001 Equipment 0001AA 15 H.P 900/765 RPM Motor 1 EA 0001AB Gear‐Type Motor Coupling 1 EA 0001AC 8” Drum Dia.Thruster Type Shoe Brake 1 EA 0001AD Hoist Control Panel with Start‐Stop Stations 1 EA 0001AE Hoist Gear‐Type Limit Switch 1 EA 0001AF Block Actuated Secondary Limit Switch 1 EA 0001AG Wire Interface 1 EA
TOTAL TASKS:
PRICING SCHEDULE Quantity Unit Price UOM Total Cost CLIN Description 1001 Installation 1001AA Crane Field Specialist 160 Per/Hr
1001AB
Shop Specialist
80 Per/Hr
1001AC
Foreman
80 Per/Hr
1001AD
Mobile Crane
80 Per/Hr 1001AE Pick‐up Truck 82 Per/Hr 1001AF Utility Truck 80 Per/Hr
TOTAL TASKS:
PRICING SCHEDULE Quantity Unit Price UOM Total Cost CLIN Description
2001 Accident Prevention Plan
2001AA
Project Manager
8 Per/Hr
2001AB
Adminstrative Assistant
4 Per/Hr
TOTAL TASKS:
GRAND TOTAL
File details come from the government source that posted it. Updated .