Pricing Schedule Attachment.pdf
PDF 149 KB Posted
- Attached to
- F108--Environmental Abatement IDIQ - PGH
- Solicitation number
- 36C24422Q0426
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24422Q0426 0001_1.docx | DOCX document | |
| Questions and Answers - Final.pdf | ||
| 36C24422Q0426.docx | DOCX document | |
| SCA WD 2015-4235 REV 18 DTD 12-27-2021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Schedule Attachment
Quotes will be evaluated in accordance with the criteria set forth below. The Government may, at its discretion and in its best interest, make award without conducting discussions with offerors. Therefore, prospective offerors are encouraged to submit initial quotes that represent the best terms and conditions of the offeror.
The schedule below is the estimated quantities for remediation each year of the contract based on recent history and potential remediation scope of work. The quantities are not guaranteed and due to the unpredictable nature of the workload could vary significantly from the estimated quantities.
Unit Cost will be applicable for the life of the executed contract. Service Contract Act Price Adjustments will be allowable to hourly wages in accordance with the Service Contract Act upon incorporation of updated Wage Determinations. Current wage determinations will be incorporated with the issuance of a new task order, or once per annum.
Abatements including all disposal costs Estimated Qty
Unit Unit Cost Extended Costs
Asbestos Tile Abatement 1,000 Sq. Ft.
Asbestos Mastic Abatement 1,000 Sq. Ft.
Asbestos Cove Base Abatement 300 LF Asbestos Cove Base Mastic 300 LF Asbestos Pipe ≤ 5” Diameter 150 LF Asbestos Pipe > 5” Diameter 150 LF
Asbestos Elbow or Fitting ≤ 5” Diameter 30 Ea Asbestos Elbow or Fitting > 5” Diameter 30 Ea
Asbestos Fireproofing Penetration 30 Ea Lead Paint 200 Sq. Ft.
Lead Sheet 200 Sq. Ft.
Lead Pipe 50 LF
Mold 1,000 Sq. Ft.
Manpower Project Manager/Inspector 25 Hr
Supervisor 100 Hr Laborer 100 Hr
Administrative 25 Hr
Miscellaneous ICRA – 20’ L x 12’ H - plastic 2 Job
ICRA – 20’ L x 12’ H - hard walls 2 Job Dumpster 30 CYD 2 Ea Dumpster 10 CYD 2 Ea Permits (at costs) 0 0
Mobilization 3 Ea
Total Annual Cost based on Estimates Above
Pricing Schedule Attachment