Questions and Answers - Final.pdf
PDF 65 KB Posted
- Attached to
- F108--Environmental Abatement IDIQ - PGH
- Solicitation number
- 36C24422Q0426
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24422Q0426 0001_1.docx | DOCX document | |
| Pricing Schedule Attachment.pdf | ||
| 36C24422Q0426.docx | DOCX document | |
| SCA WD 2015-4235 REV 18 DTD 12-27-2021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers – 36C24422Q0426
1. Will the Contractor be required to honor the same unit prices that are submitted on the price/cost schedule for the entire length of the 5-year IDIQ contract?
See Pricing Schedule Attachment included in solicitation package.
2. Is it possible provide the design specification for the ICRA plastic and hardwall? I am interested in the spacing of joists, thickness of the hardwall sheeting.
The hardwall must meet a 1-hour fire-rating.
3. Do you know whether the upper section of the wall extend above the lay-in ceiling, requiring a critical barrier through multiple penetrations?
Yes – ICRA includes above ceiling.
4. The 30cyd and 10cyd Dumpster, Is this only to supply the dumpster or does it include the disposal of asbestos, mold, or lead? Are other discards also going to the dumpster?
Disposal of materials is included. Only waste from your project will be discarded in the dumpster.
5. Do the unit prices for floor tile, pipe, etc. include labor or is that billed separately with the labor costs?
Labor rates are indicated on a separate line.
6. Lastly, are there minimums for each of the mobilizations?
There are no minimums for each mobilization.