This document is a Pricing Proposal Form for a Pinellas County School Board (PCSB) contract opportunity for resurfacing, resealing, and restriping services. The bid seeks a qualified paving or general contractor to provide comprehensive asphalt and striping services county-wide, including resurfacing existing asphalt, sealing or resealing areas, striping or restriping existing areas, and demolition and repair of existing surfaces. The contractor is prohibited from subcontracting without prior written authorization from the Maintenance Department, and all work must be performed directly by the bidding entity.

The pricing proposal includes detailed unit pricing for various services such as sealing (power brooming, seal coating), asphalt work (leveling, overlay, milling), striping (layout, stall marking, line striping), and miscellaneous services like demolition, base material, and speed bump installation. The bid evaluation includes points for previous PCSB work experience, customer references, local location, unit fee schedules across different service categories, a work scenario calculation, and hourly rates. The proposal allows for a one-time 2% remobilization fee on phased projects, and requires bidders to list and own all equipment used in the project, with equipment subject to inspection by PCSB representatives.

View the file

Other files for this state and local contract opportunity

Other files attached to Resurfacing, Resealing, Restriping, newest first.
File Type Posted
ResurfacingResealingRestriping.pdf PDF
pricing_proposal.docx DOCX document
specifications.docx DOCX document
Bid_Protest_Procedure.pdf PDF
Insurance_Specifications_for_Contractors.pdf PDF
ResurfacingResealingRestriping.pdf PDF
specifications.docx DOCX document
Bid_Protest_Procedure.pdf PDF
Insurance_Specifications_for_Contractors.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID PROPOSAL EVALUATION FORM

(Office Use Only)

REMOBILIZATION FEE

The Owner will allow the Contractor a one (1) time remobilization fee on phased projects only. A two (2) percent charge shall be applied to the total quoted price of phased projects only. The Owner will decide which projects are considered phased projects.

TABLE 1 - EQUIPMENT INVENTORY

List the title & registration number or make and model for each individual piece of equipment below. All equipment must be owned by the bidding entity at the time of the bid, and must be available for inspection and verification by PCSB representative(s).

Squeegee Machines

1.

2.

3.

Spray Tankers

1.

2.

3.

Pavers

1.

2.

3.

Striping Machines

1.

2.

3.

Rollers: Size 1-4T

1.

2.

3.

Rollers: Size 5-9T

1.

2.

3.

Rollers: Size 10+T

1.

2.

3.

Traffic Rollers:

1.

2.

3.

Crack Sealer Machine

1.

2.

3.

Grading Tractor

1.

2.

3.

Loader/Bobcat

1.

2.

3.

Tacking Truck

1.

2.

3.

Dump Trucks

1.

2.

3.

Mechanical Sweeper

1.

2.

3.

· All equipment must be owned by the bidding entity at the time of the bid.

Business and equipment reside in Pinellas County Yes No

Location of above listed equipment for inspection purposes:

PRICING PROPOSAL FORM

UNIT PRICING

Provide firm unit pricing as requested below, and include all supervision, personnel, supplies, equipment, vehicles etc. in order to provide services, as requested to facilities, county wide. All fees, charges and expenses of any kind, including travel portal to portal shall be factored into unit pricing bid.

All spaces should be completed or your bid could be declared non-responsive.

NOTE: For the purpose of determining low bid, multiply the Estimated Quantities times the Unit Price to obtain the Extended Price. Add the Extended Prices to obtain the Grand Total. All items must be bid in order for your bid to be considered.

Unit pricing shall include allowances for ALL materials, equipment and labor necessary to complete the project.

It is understood these unit prices are intended for use in conjunction with a proposed project incurring a single mobilization. They do not represent standalone costs for independent tasks.

TABLE 2 - UNIT FEE SCHEDULE

Unit Cost

A. Sealing
1. Power Broom & blower
$ /sq. ft.
2. Seal Coat w/ spray
$ /sq. ft.
3. Seal Coat w/squeegee machine
$ /sq. ft.

4. Seat Coat Drive Lane

5. Crack Sealing $ /sq. ft.

$ /lin. ft.

B. Asphalt

1. Leveling
$ /ton
2. Overlay 1" minimum compacted PCIII 9.5 w/tack
$ /sq. yd.
3. Edge/Bump Milling
$ /sq. yd.
4. Saw Cut with 6" full depth asphalt patch
$ /sq. ft.

C. Striping

1. Lay-out
$ /lin. ft.
2. Stalls 19’
$ /ea.
3. 4" striping
$ /lin. ft.
4. Directional arrows
$ /ea.
5. 24" stencil (various)
$ /ea.
6. 12" Stencil (various)
$ /ea.
7. 6" Stencil (various)
$ /ea.
8. Stop Bars (8’)
$ /ea.

9. Cross Walks (24')

10. Cross Walks (DOT) $ /ea.

$ /ea.

11. Handicap Stalls (standard ADA requirements)
$ /ea.
12.Concrete Car Bumper removal
$ /ea.
13. Concrete Car Bumper install
$ /ea.
14. Concrete Car bumper furnish
$ /ea.

D. Driver Ed.

Range

1. 1. Drivers Ed. range - layout & stripe

2. a. Seal coat

3. b. Layout

4. c. Line Stripe

/sq. ft.

/lin. ft.

$ _______________
/lin. ft.

E. Milling

D. Miscellaneous

1. 1”

2. 1.5”

3. 2”

$ /sq. yd.

$ /sq. yd.

$ / sq. yd.

1. Demolition - asphalt removal 1" > 5,000 sf $ /sq. ft.

2. Base Material (compacted - 6 ")

a. Shell
$ /sq. ft.
b. Reclaimed Concrete (crushed)
$ /sq. ft.
3. Herbicide
$ /sq. ft.
4. Speed Bumps (asphalt) 3” H x 18” Wide
$ /lin. ft.

5. Speed Hump Table (asphalt)4” H x12’ Long x 10’ wide

6. Oversized Space Table (asphalt)

7. Traffic Delineator Furnish

8. Traffic Delineator Install

9. Mechanical Sweep $ /ea.

$ /per ton $ /ea.

$ /ea.

$ /hourly

TABLE 3 - WORK SCENARIO

Use the prices entered in the Unit Fee Schedule in Table 2 to complete the following work scenario for the purpose of determining the lowest cost bid.

Quantity
Description
Unit Price
Extended Price
125,000sq. ft.
Sealing spray
$ /sq ft
$
125,000sq. ft.
Sealing squeegee
$ /sq ft
$
2,800 lin. ft
Crack Sealing
$ /lin. ft
$
25 Tons
Leveling
$ ton
$
7,000 sq. yd.
Overlay 1” minimum w/tack
$ sq yd
$
300 sq. ft..
Saw cut full depth patch
$ sq ft.
$
650 lin. ft.
Lay out
$ lin. ft
$
300
Stalls
$ each
$
650 lin. ft.
4” striping
$ lin. ft
$
10
Stop bars
$ each
$
13
Directional arrows
$ each
$
65
12” stencils
$ each
$
2
Cross walk (24”)
$ each
$
3
Handicap stalls
$ each
$
65
Car bumper installations
$ each
$
65
Car bumper furnish
$ each
$
7,000 sq yd..
Demolition Milling
$ /sq yd.
$

Grand Total: ( to be used for basis of determining lowest cost bid)

TABLE 4-HOURLY RATE

Hourly rates for any work outside of this bid.

1.
Labor
$
per hour
2.
Supervisor
$
Per hour

Vendor Name:_____________________________________

ASSIGNED

POINTS

SCORE

Previous PCSB Work Experience

YES
5

Customer References Similar In Scope

(-3 points/reference forms not included with bid)
-3
Location in Pinellas County
5

Table 2 Unit Fee

Sealing
0-25
Asphalt
0-20
Striping
0-70
Drivers Ed. Range
0-15
Milling
0-15
Miscellaneous
0-50

Table 3 Work Scenario

Grand Total
0-50

Table 4 Hourly Rates

Hourly Labor
0-10
Hourly Supervisor
0-10

Possible 275 total points

Total Earned Points