Pricing_Proposal_23-0884(reference_only).pdf

PDF 271 KB Posted

Attached to
WELL SERVICES FOR PINELLAS COUNTY UTILITIES
Solicitation number
23-0884-ITB-C
Issued by
Pinellas County, Florida

About this file

The document is a Pricing Proposal for Invitation to Bid - Construction (ITB-C) #23-0884-ITB-C for Well Services for Pinellas County Utilities. The comprehensive pricing proposal covers multiple well-related services, including annual maintenance of nine augmentation wells, well evaluation services, well deepening services, well clearing services, well back-plugging services, well rehabilitation chemical treatment, well repair services, construction of various monitoring and supply wells, test pump services, and well abandonment services. The contract appears to be a five-year agreement for comprehensive well maintenance and construction services, with detailed line items specifying quantities, units of measure, and pricing for each specific service type.

The pricing proposal includes a wide range of services with varying pricing structures, including lump sum, per hour, per foot, per well, and per work authorization (WA) rates. Services range from mobilization and pump removal/reinstallation to specialized tasks like geophysical logging, downhole video logging, specific capacity testing, and emergency evaluation services. The proposal includes contingency and emergency service line items, such as standby time, emergency well clearing, and an unspecified service line item not to exceed $50,000. The comprehensive nature of the pricing schedule suggests Pinellas County Utilities is seeking a versatile contractor capable of handling a broad spectrum of well-related infrastructure maintenance, evaluation, and construction needs.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation to Bid - Construction (ITB-C) #23-0884-ITB-C Title: WELL SERVICES FOR PINELLAS COUNTY UTILITIES

9. PRICING PROPOSAL

ANNUAL MAINTENANCE OF NINE (9) AUGMENTATION WELLS AT CROSS BAR / AL BAR RANCH AS

DESCRIBED IN SECTION D1.

Line Item Description Quantity Unit of Measure Unit Cost Total

1 Mobilization 10 Each

2 Clean, Test, and

Diagnose 9 PLCs and Pumps

10 Each

3 Testing of

Submersible pump

10 Each

4 Provide Detailed

Summary Report 10 Each

TOTAL

WELL EVALUATION SERVICES - FOR PERFORMING EVALUATION SERVICES ON ONE AUGMENTATION

WELL AS DESCRIBED IN SECTION D2.

Line Item Description Quantity Unit of Measure Unit Cost Total

5 Mobilization 1 Lump Sum

6 Evaluation of

System 1 Lump Sum

7 Remove / Install

Pump 1 Lump Sum

8 Provide Detailed

Report with

Recommendations

1 Lump Sum

9 Perform

Downhole Video

Logging

1 Lump Sum

10 Perform Specific

Capacity Test 4 Per Hour

Line Item Description Quantity Unit of Measure Unit Cost Total

WELL DEEPENING SERVICES - FOR DEEPENING THE OPEN BOREHOLE IN ONE AUGMENTATION SUPPLY

WELL AS DESCRIBED IN SECTION D3.

Line Item Description Quantity Unit of Measure Unit Cost Total

11 Mobilization 1 Lump Sum

12 Drill 6-inch

Diameter

Borehole 400-

700' bls

300 Per Foot

13 Collect

Formation

Samples Every 5 ft.

60 Each

14 Collect Water

Samples Every 50 ft.

6 Each

15 Perform Specific

Capacity Test 8 Per Hour

16 Remove/Reinstall

Well House 1 Lump Sum

17 Remove/Reinstall

Pump 1 Lump Sum

18 Develop Well 3 Per Hour

19 Geophysical

Logging 1 Lump Sum

WELL CLEARING SERVICES - FOR CLEARING OBSTRUCTIONS FROM AN 8-INCH DIAMETER SUPPLY WELL

- AS DESCRIBED IN SECTION D4.

20 Mobilization 1 Lump Sum

21 Remove/Reinstall

Well House 1 Lump Sum

22 Remove/Reinstall

Pump 1 Lump Sum

23 Clear Well to TD with 8-inch bit 400 Per Foot

24 Develop Well 4 Per Hour

WELL BACK-PLUGGING SERVICES - FOR BACK-PLUGGING A PORTION OF THE BOREHOLE IN A 8-INCH

DIAMETER SUPPLY WELL AS DESCRIBED IN SECTION D5.

Line Item Description Quantity Unit of Measure Unit Cost Total

25 Mobilization 1 Lump Sum

26 Remove/Reinstall

Well House 1 Lump Sum

27 Remove/Reinstall

Pump 1 Lump Sum

28 Back-plug bottom of

Borehole

50 Per Foot

29 Perform Specific

Capacity Test

WELL REHABILITATION CHEMICAL TREATMENT - AS DESCRIBED IN SECTION D6.

30 Mobilization 1 Lump Sum

31 Remove/Reinstall

Pump 1 Lump Sum

32 Acid Treatment

Activities 1 Lump Sum

33 pH Adjustment

(acid neutralization)

1 Lump Sum

34 Airlift

Development 3 Per Hour

WELL REPAIR SERVICES - AS DESCRIBED IN SECTION D7.

35 Site Visit/Written

Quote for Repair 30 Per Hour

36 Emergency/After

Hours Repair 10 Per Hour

37 Replacement with non-warrantied parts

1 At Cost

38 Replacement with Warrantied

Parts

1 No Charge

CONSTRUCTION OF SURFICIAL AQUIFER MONITORING WELL - AS DESCRIBED IN SECTION D8 (A).

39 Mobilization 10 Per WA

40 Drive Macro

Cores to Obtain

Lithology

200 Per Foot

41 Drill Borehole to

20 ft bls.

200 Per Foot

42 Furnish and

Install PVC Well

Casings and 10 ft.

of 0.010 Slot

Well Screen

200 Per Foot

43 Develop Well to

Less Than 20

NTU

20 Per Hour

44 Install Concrete

Well Pad and

Appropriate

Lockable

Aluminum

Protective Cover

10 Each

45 Install Well

Protection

Bollard System

10 Each

CONSTRUCTION OF SHALLOW UPPER FLORIDAN AQUIFER MONITORING WELL - AS DESCRIBED IN

SECTION D8 (B).

Line Item Description Quantity Unit of Measure Unit Cost Total

46 Mobilization 1 Lump Sum

47 Advance Split

Spoon Sampler to Top of LS (40

ft. bls)

40 Per Foot

48 Drill 10-inch

Diameter

Borehole

40 Per Foot

49 Furnish and

Install 8-inch

Diameter PVC

Surface Casing

1 Lump Sum

50 Drill 6-inch

Diameter

Borehole

60 Per Foot

51 Furnish and

Install 2-inch

Diameter Casings and 20 ft. of

0.010 Slot Well

Screen

1 Lump Sum

52 Install Well Pad and Appropriate

Lockable

Aluminum

Protective Cover

1 Lump Sum

53 Develop Well 2 Per Hour

54 Install Well

Protection

Bollard System

CONSTRUCTION OF 4-INCH DIAMETER IRRIGATION SUPPLY WELL - AS DESCRIBED IN SECTION D8 (C).

55 Mobilization 1 Lump Sum

56 Drill 8-inch

Diameter

Borehole to 100

ft. bls

100 Per Foot

57 Furnish and

Install 4-inch PVC

Surface Casing

1 Lump Sum

58 Drill 3-inch

Borehole to 200

ft. bls.

200 Per Foot

59 Furnish and

Install Pump, Pressure Tank, Bollards, and all

Appurtenances.

1 Lump Sum

60 Develop Well 2 Per Hour

CONSTRUCTION OF 4-DIAMETER PRIVATE DOMESTIC SUPPLY WELL - AS DESCRIBED IN SECTION D8 (D).

61 Mobilization 1 Lump Sum

62 Drill 8-inch

Diameter

Borehole to 150

ft. bls

150 Per Foot

63 Furnish and

Install 4-inch PVC

Surface Casing

1 Lump Sum

64 Drill 3-inch

Borehole to 300

ft. bls.

300 Per Foot

65 Furnish and

Install Pump, Pressure Tank, Bollards, and all

Appurtenances.

1 Lump Sum

66 Develop Well 2 Per Hour

67 Disinfect well and bacteriological clearance

CONSTRUCTION OF 8-DIAMETER AUGMENTATION SUPPLY WELL - AS DESCRIBED IN SECTION D8 (E).

68 Mobilization 1 Lump Sum

69 Drill 12-inch

Diameter

Borehole to 150

ft. bls

150 Per Foot

70 Furnish and install 8-inch PVC casing to 150 ft.

bls

1 Lump Sum

71 Drill 6-inch

Borehole to 400

ft. bls

400 Per Foot

72 Furnish and

Install

Approprately

Sized

Submersible

Pump and

Connect all

Piping to

Wetland

Augmentation

System

1 Lump Sum

73 Develop Well 4 Per Hour

PROVIDE, INSTALL AND RUN TEST PUMPS - AS DESCRIBED IN SECTION D9.

74 Mobilization -delivery and set up

1 Each

75 Provide and install a 1000 gpm test pump, 500 ft. of temporary discharge line equipped with a diffuser and calibrated flow meter

1 Each

76 Operate 1000 gpm test pump for 8 hours

8 Per Hour

77 Provide and install a 1000 gpm test pump, 500 ft of temporary discharge line equipped with a diffuser and calibrated flow meter

1 Each

78 Operate 100 gpm test pump for 4 hours

ABANDONMENT OF 2-INCH DIAMETER 20 FT. DEEP MONITORING WELL - AS DESCRIBED IN SECTION

D10.

Line Item Description Quantity Unit of Measure Unit Cost Total

79 Mobilization 10 Per WA

80 Remove protective cover, concrete slab and bollards, cut

PVC casing below grade prep well for abandonment

10 Each

81 Grout up ten wells from

Bottom to Top via Tremie Pipe

200 Per Foot

82 Remove all above ground fixtures and slab, cut well casing below grade, and grade area

10 Per Well

ABANDONMENT OF 4-INCH DIAMETER 80 FT. DEEP MONITORING WELL - AS DESCRIBED IN SECTION

20.3

Line Item Description Quantity Unit of Measure Unit Cost Total

83 Mobilization 5 Per WA

84 Remove protective cover, concrete slab and bollards, cut

PVC casing below grade prep well for abandonment

5 Each

85 Grout up 5 wells from Bottom to

Top via Tremie

Pipe

400 Per Foot

86 Remove all above ground fixtures and slab, cut well casing below grade, and grade area

OTHER CONTRACT ITEMS

87 Standby Time 25 Per Hour

88 Emergency

Evaluation of

System

89 Emergency Well

Clearing 1 Lump Sum

90 Emergency Back-

Plugging Service 1 Lump Sum

91 Unspecified (i.e., acid)- Not to

Exceed

$50,000.00