Pricing_Proposal_23-0884(reference_only).pdf
PDF 271 KB Posted
- Attached to
- WELL SERVICES FOR PINELLAS COUNTY UTILITIES
- Solicitation number
- 23-0884-ITB-C
- Issued by
- Pinellas County, Florida
About this file
The document is a Pricing Proposal for Invitation to Bid - Construction (ITB-C) #23-0884-ITB-C for Well Services for Pinellas County Utilities. The comprehensive pricing proposal covers multiple well-related services, including annual maintenance of nine augmentation wells, well evaluation services, well deepening services, well clearing services, well back-plugging services, well rehabilitation chemical treatment, well repair services, construction of various monitoring and supply wells, test pump services, and well abandonment services. The contract appears to be a five-year agreement for comprehensive well maintenance and construction services, with detailed line items specifying quantities, units of measure, and pricing for each specific service type.
The pricing proposal includes a wide range of services with varying pricing structures, including lump sum, per hour, per foot, per well, and per work authorization (WA) rates. Services range from mobilization and pump removal/reinstallation to specialized tasks like geophysical logging, downhole video logging, specific capacity testing, and emergency evaluation services. The proposal includes contingency and emergency service line items, such as standby time, emergency well clearing, and an unspecified service line item not to exceed $50,000. The comprehensive nature of the pricing schedule suggests Pinellas County Utilities is seeking a versatile contractor capable of handling a broad spectrum of well-related infrastructure maintenance, evaluation, and construction needs.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation to Bid - Construction (ITB-C) #23-0884-ITB-C Title: WELL SERVICES FOR PINELLAS COUNTY UTILITIES
9. PRICING PROPOSAL
ANNUAL MAINTENANCE OF NINE (9) AUGMENTATION WELLS AT CROSS BAR / AL BAR RANCH AS
DESCRIBED IN SECTION D1.
Line Item Description Quantity Unit of Measure Unit Cost Total
1 Mobilization 10 Each
2 Clean, Test, and
Diagnose 9 PLCs and Pumps
10 Each
3 Testing of
Submersible pump
10 Each
4 Provide Detailed
Summary Report 10 Each
TOTAL
WELL EVALUATION SERVICES - FOR PERFORMING EVALUATION SERVICES ON ONE AUGMENTATION
WELL AS DESCRIBED IN SECTION D2.
Line Item Description Quantity Unit of Measure Unit Cost Total
5 Mobilization 1 Lump Sum
6 Evaluation of
System 1 Lump Sum
7 Remove / Install
Pump 1 Lump Sum
8 Provide Detailed
Report with
Recommendations
1 Lump Sum
9 Perform
Downhole Video
Logging
1 Lump Sum
10 Perform Specific
Capacity Test 4 Per Hour
Line Item Description Quantity Unit of Measure Unit Cost Total
WELL DEEPENING SERVICES - FOR DEEPENING THE OPEN BOREHOLE IN ONE AUGMENTATION SUPPLY
WELL AS DESCRIBED IN SECTION D3.
Line Item Description Quantity Unit of Measure Unit Cost Total
11 Mobilization 1 Lump Sum
12 Drill 6-inch
Diameter
Borehole 400-
700' bls
300 Per Foot
13 Collect
Formation
Samples Every 5 ft.
60 Each
14 Collect Water
Samples Every 50 ft.
6 Each
15 Perform Specific
Capacity Test 8 Per Hour
16 Remove/Reinstall
Well House 1 Lump Sum
17 Remove/Reinstall
Pump 1 Lump Sum
18 Develop Well 3 Per Hour
19 Geophysical
Logging 1 Lump Sum
WELL CLEARING SERVICES - FOR CLEARING OBSTRUCTIONS FROM AN 8-INCH DIAMETER SUPPLY WELL
- AS DESCRIBED IN SECTION D4.
20 Mobilization 1 Lump Sum
21 Remove/Reinstall
Well House 1 Lump Sum
22 Remove/Reinstall
Pump 1 Lump Sum
23 Clear Well to TD with 8-inch bit 400 Per Foot
24 Develop Well 4 Per Hour
WELL BACK-PLUGGING SERVICES - FOR BACK-PLUGGING A PORTION OF THE BOREHOLE IN A 8-INCH
DIAMETER SUPPLY WELL AS DESCRIBED IN SECTION D5.
Line Item Description Quantity Unit of Measure Unit Cost Total
25 Mobilization 1 Lump Sum
26 Remove/Reinstall
Well House 1 Lump Sum
27 Remove/Reinstall
Pump 1 Lump Sum
28 Back-plug bottom of
Borehole
50 Per Foot
29 Perform Specific
Capacity Test
WELL REHABILITATION CHEMICAL TREATMENT - AS DESCRIBED IN SECTION D6.
30 Mobilization 1 Lump Sum
31 Remove/Reinstall
Pump 1 Lump Sum
32 Acid Treatment
Activities 1 Lump Sum
33 pH Adjustment
(acid neutralization)
1 Lump Sum
34 Airlift
Development 3 Per Hour
WELL REPAIR SERVICES - AS DESCRIBED IN SECTION D7.
35 Site Visit/Written
Quote for Repair 30 Per Hour
36 Emergency/After
Hours Repair 10 Per Hour
37 Replacement with non-warrantied parts
1 At Cost
38 Replacement with Warrantied
Parts
1 No Charge
CONSTRUCTION OF SURFICIAL AQUIFER MONITORING WELL - AS DESCRIBED IN SECTION D8 (A).
39 Mobilization 10 Per WA
40 Drive Macro
Cores to Obtain
Lithology
200 Per Foot
41 Drill Borehole to
20 ft bls.
200 Per Foot
42 Furnish and
Install PVC Well
Casings and 10 ft.
of 0.010 Slot
Well Screen
200 Per Foot
43 Develop Well to
Less Than 20
NTU
20 Per Hour
44 Install Concrete
Well Pad and
Appropriate
Lockable
Aluminum
Protective Cover
10 Each
45 Install Well
Protection
Bollard System
10 Each
CONSTRUCTION OF SHALLOW UPPER FLORIDAN AQUIFER MONITORING WELL - AS DESCRIBED IN
SECTION D8 (B).
Line Item Description Quantity Unit of Measure Unit Cost Total
46 Mobilization 1 Lump Sum
47 Advance Split
Spoon Sampler to Top of LS (40
ft. bls)
40 Per Foot
48 Drill 10-inch
Diameter
Borehole
40 Per Foot
49 Furnish and
Install 8-inch
Diameter PVC
Surface Casing
1 Lump Sum
50 Drill 6-inch
Diameter
Borehole
60 Per Foot
51 Furnish and
Install 2-inch
Diameter Casings and 20 ft. of
0.010 Slot Well
Screen
1 Lump Sum
52 Install Well Pad and Appropriate
Lockable
Aluminum
Protective Cover
1 Lump Sum
53 Develop Well 2 Per Hour
54 Install Well
Protection
Bollard System
CONSTRUCTION OF 4-INCH DIAMETER IRRIGATION SUPPLY WELL - AS DESCRIBED IN SECTION D8 (C).
55 Mobilization 1 Lump Sum
56 Drill 8-inch
Diameter
Borehole to 100
ft. bls
100 Per Foot
57 Furnish and
Install 4-inch PVC
Surface Casing
1 Lump Sum
58 Drill 3-inch
Borehole to 200
ft. bls.
200 Per Foot
59 Furnish and
Install Pump, Pressure Tank, Bollards, and all
Appurtenances.
1 Lump Sum
60 Develop Well 2 Per Hour
CONSTRUCTION OF 4-DIAMETER PRIVATE DOMESTIC SUPPLY WELL - AS DESCRIBED IN SECTION D8 (D).
61 Mobilization 1 Lump Sum
62 Drill 8-inch
Diameter
Borehole to 150
ft. bls
150 Per Foot
63 Furnish and
Install 4-inch PVC
Surface Casing
1 Lump Sum
64 Drill 3-inch
Borehole to 300
ft. bls.
300 Per Foot
65 Furnish and
Install Pump, Pressure Tank, Bollards, and all
Appurtenances.
1 Lump Sum
66 Develop Well 2 Per Hour
67 Disinfect well and bacteriological clearance
CONSTRUCTION OF 8-DIAMETER AUGMENTATION SUPPLY WELL - AS DESCRIBED IN SECTION D8 (E).
68 Mobilization 1 Lump Sum
69 Drill 12-inch
Diameter
Borehole to 150
ft. bls
150 Per Foot
70 Furnish and install 8-inch PVC casing to 150 ft.
bls
1 Lump Sum
71 Drill 6-inch
Borehole to 400
ft. bls
400 Per Foot
72 Furnish and
Install
Approprately
Sized
Submersible
Pump and
Connect all
Piping to
Wetland
Augmentation
System
1 Lump Sum
73 Develop Well 4 Per Hour
PROVIDE, INSTALL AND RUN TEST PUMPS - AS DESCRIBED IN SECTION D9.
74 Mobilization -delivery and set up
1 Each
75 Provide and install a 1000 gpm test pump, 500 ft. of temporary discharge line equipped with a diffuser and calibrated flow meter
1 Each
76 Operate 1000 gpm test pump for 8 hours
8 Per Hour
77 Provide and install a 1000 gpm test pump, 500 ft of temporary discharge line equipped with a diffuser and calibrated flow meter
1 Each
78 Operate 100 gpm test pump for 4 hours
ABANDONMENT OF 2-INCH DIAMETER 20 FT. DEEP MONITORING WELL - AS DESCRIBED IN SECTION
D10.
Line Item Description Quantity Unit of Measure Unit Cost Total
79 Mobilization 10 Per WA
80 Remove protective cover, concrete slab and bollards, cut
PVC casing below grade prep well for abandonment
10 Each
81 Grout up ten wells from
Bottom to Top via Tremie Pipe
200 Per Foot
82 Remove all above ground fixtures and slab, cut well casing below grade, and grade area
10 Per Well
ABANDONMENT OF 4-INCH DIAMETER 80 FT. DEEP MONITORING WELL - AS DESCRIBED IN SECTION
20.3
Line Item Description Quantity Unit of Measure Unit Cost Total
83 Mobilization 5 Per WA
84 Remove protective cover, concrete slab and bollards, cut
PVC casing below grade prep well for abandonment
5 Each
85 Grout up 5 wells from Bottom to
Top via Tremie
Pipe
400 Per Foot
86 Remove all above ground fixtures and slab, cut well casing below grade, and grade area
OTHER CONTRACT ITEMS
87 Standby Time 25 Per Hour
88 Emergency
Evaluation of
System
89 Emergency Well
Clearing 1 Lump Sum
90 Emergency Back-
Plugging Service 1 Lump Sum
91 Unspecified (i.e., acid)- Not to
Exceed