Price Sheet (1) (1).pdf

PDF 130 KB Posted

Attached to
Upgrading Sewer Line Piping System & Lift Station Federal contract opportunity
Solicitation number
FY2525570122
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

This is a Price Sheet for a federal contract opportunity to upgrade the sewer line piping system and lift station at the Falcon Power Plant in Starr County, Texas. The document outlines four Contract Line Item Numbers (CLINs) with a quantity of 1 for each line item: Assessment/Inspection, Design of New Piping System and Lift Station Pump, Material and Supplies, and Labor Costs. Each line item is currently priced at $0.00, with a note to include all applicable costs/fees in the final price quote. The sheet is designed for a contractor to complete with their company name, subcontractor name, Unique Entity ID (UEI), point of contact, signature, and date, with a reminder that the Federal Government is tax-exempt.

View the file

Other files for this federal contract opportunity

Other files attached to Upgrading Sewer Line Piping System & Lift Station, newest first.
File Type Posted
Septic Tank Drawing.pdf PDF
PWS-FY25-Falcon Sewer Lines and Lift Station Upgrade Project rev1 07_10_2025 .pdf PDF
WD2015-5245.pdf PDF
Amendment_1_QA.pdf PDF
Applicable Terms and Conditions.pdf PDF
PWS FY25 Falcon Sewer Lines and Lift Station Upgrade Pro_e.pdf PDF
Illustration 1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet

CLIN Structure:

CLIN

Number

Description Quantity Unit of Issue Unit Price Total Price

001 Perform Assessment/In spection

1 EA (Each) $0.00 $0.00

002 Design New Piping System and Lift Station Pump

1 EA (Each) $0.00 $0.00

003 Material and Supplies

1 EA (Each) $00.00 $0.00

004 Labor Cost and other

1 EA (Each) $00.00 $0.00

Please include all applicable costs/fees in price quote.

The Federal Government is Tax-Exempt.

Contractor Name: __________________

Subcontractor Name: _________________

Active UEI#______________

POC Name: ______________________________

Signature: ________________________________________

Date: _____________

File details come from the government source that posted it. Updated .