Price_Schedule_WEST_BEDROOM_RUG.xls

XLS spreadsheet 33 KB Posted

Attached to
EDIS - Conserve West Bedroom Rug
Solicitation number
140P4526Q0006
Issued by

About this file

This is a price schedule template for conservation services related to a West Bedroom rug at Thomas Edison National Historical Park (Glenmont) in West Orange, New Jersey. The file is associated with solicitation 140P4526Q0006 issued by the National Park Service under the Department of the Interior.

The price schedule is structured to capture labor, equipment, and material costs for the rug conservation project (EDIS 102381). Labor categories include hiring conservators, travel, de-installation and re-installation of the rug in the West Bedroom, producing a condition and treatment report, packing labor, and transportation to and from the studio. Equipment costs are to be itemized by type with associated hours and rates. Material costs encompass packing supplies such as Tyvek and rolling tubes, and conservation supplies including thread and adhesive. All line items and the grand total currently show $0.00, indicating this is a blank template awaiting contractor pricing input. No work order number is specified in the template.

View the file

Other files

File Type Posted
Sol_140P4526Q0006_Amd_0001.pdf PDF
B08_Contractor_Monitoring_SOP_Revised_5-10-22_(F)_(1).pdf PDF
Past_Performance_Questionnaire.pdf PDF
Technical_Questionnaire.docx DOCX document
A04_RFPWestBedroomRug.pdf PDF
Sol_140P4526Q0006.pdf PDF
B03_2015-4211_rev_32_12032025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

THOMAS EDISON NATIONAL HISTORICAL PARK
Price Schedule
Project: Conserve West Bedroom Rug EDIS 102381 on Exhibit at Edison’s Home, GlenmontWork Order #n/a
Labor SkillHoursRateAmountTotals
Hire conservators to complete conservation (labor)$0.00
Travel$0.00
De-install/re-install rug in the West Bedroom$0.00
Produce condition and treatment report$0.00
Packing (labor)$0.00
Transport rug to and from studio$0.00
$0.00
$0.00
$0.00
Equipment (Type)HoursRate/Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
- 0
- 0
Mobilization- 0
Total Equipment Costs$0.00
Material (Type)QuantityAmount
Packing supplies (Tyvek, rolling tube, etc.)$0.00
Supplies for conservation (thread, adhesive, etc.)$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total Material Costs$0.00
- 0
- 0
- 0
Grand Total$0.00

Sheet2

Sheet3

File details come from the government source that posted it. Updated .