Price_Schedule_WEST_BEDROOM_RUG.xls
XLS spreadsheet 33 KB Posted
- Attached to
- EDIS - Conserve West Bedroom Rug Federal contract opportunity
- Solicitation number
- 140P4526Q0006
About this file
This is a price schedule template for conservation services related to a West Bedroom rug at Thomas Edison National Historical Park (Glenmont) in West Orange, New Jersey. The file is associated with solicitation 140P4526Q0006 issued by the National Park Service under the Department of the Interior.
The price schedule is structured to capture labor, equipment, and material costs for the rug conservation project (EDIS 102381). Labor categories include hiring conservators, travel, de-installation and re-installation of the rug in the West Bedroom, producing a condition and treatment report, packing labor, and transportation to and from the studio. Equipment costs are to be itemized by type with associated hours and rates. Material costs encompass packing supplies such as Tyvek and rolling tubes, and conservation supplies including thread and adhesive. All line items and the grand total currently show $0.00, indicating this is a blank template awaiting contractor pricing input. No work order number is specified in the template.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4526Q0006_Amd_0001.pdf | ||
| B08_Contractor_Monitoring_SOP_Revised_5-10-22_(F)_(1).pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| B03_2015-4211_rev_32_12032025.pdf | ||
| Technical_Questionnaire.docx | DOCX document | |
| Sol_140P4526Q0006.pdf | ||
| A04_RFPWestBedroomRug.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| THOMAS EDISON NATIONAL HISTORICAL PARK | ||||
| Price Schedule | ||||
| Project: Conserve West Bedroom Rug EDIS 102381 on Exhibit at Edison’s Home, Glenmont | Work Order # | n/a | ||
| Labor Skill | Hours | Rate | Amount | Totals |
| Hire conservators to complete conservation (labor) | $0.00 | |||
| Travel | $0.00 | |||
| De-install/re-install rug in the West Bedroom | $0.00 | |||
| Produce condition and treatment report | $0.00 | |||
| Packing (labor) | $0.00 | |||
| Transport rug to and from studio | $0.00 | |||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| Equipment (Type) | Hours | Rate/Cost | ||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| - 0 | ||||
| - 0 | ||||
| Mobilization | - 0 | |||
| Total Equipment Costs | $0.00 | |||
| Material (Type) | Quantity | Amount | ||
| Packing supplies (Tyvek, rolling tube, etc.) | $0.00 | |||
| Supplies for conservation (thread, adhesive, etc.) | $0.00 | |||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| Total Material Costs | $0.00 | |||
| - 0 | ||||
| - 0 | ||||
| - 0 | ||||
| Grand Total | $0.00 |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .