Price_Schedule_-_VC_Upgrades.pdf

PDF 142 KB Posted

Attached to
Visitor Center Upgrades @ DAAV
Solicitation number
140P6425Q0058
Issued by

About this file

This document is a Price Schedule for the Visitor Center Upgrades project at Dayton Aviation Heritage National Historical Park. The price schedule is structured as a firm-fixed price contract with line items for Mobilization/Demobilization, Demolition, and Installation, each broken down by materials, equipment, and labor. The document indicates that contractors are responsible for verifying all quantities and measurements to provide a comprehensive price covering the entire project.

The project involves removing and disposing of existing flooring, walls, and casework, followed by installing new flooring and conducting various renovations/upgrades at the visitor center. The solicitation is set aside 100% for Total Small Businesses, with a project magnitude between $100,000 and $200,000. The NAICS Code is 238990 with a size standard of $19 million, and Construction Wage Rate Requirements for Montgomery County, OH will apply. Contractors must have a UEI number and be registered and active in the System for Award Management (SAM) to be eligible for award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Quantity Price/ Unit Subtotal

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

- Materials

Construction Items

National Park Service U.S. Department of Interior

Dayton Aviation Heritage NHP

Visitor Center

PRICE SCHEDULE

PROJECT: Visitor Center Upgrades

- Labor

Mobilization/Demobilization

- Mob/Demob Costs

Demolition: Removal and disposal of the existing flooring, walls, case work and all associated work/items as outlined in the project specifications

- Equipment

Installation: New flooring and various other renovations/upgrades and all associated work/items as outlined in the project specifications

- Equipment

- Labor

** It is the responsibility of the contractor to verify all the quantities/measurements and to provide a price that will cover the completion of the entire project for this firm fixed price contract. **

- Materials

Grand Total

Overhead

Subtotal

Bonds Profit

Sheet1

File details come from the government source that posted it. Updated .