These architectural floor plan exhibits detail renovation requirements for the Dayton Aviation Heritage National Historical Park (DAAV) Visitor Center, specifically focusing on first-floor upgrades. The documents provide detailed specifications for flooring removal and replacement, wall and work area removals, and new ranger station configuration. Key renovation elements include:
Flooring Scope: Remove and replace tile flooring within the primary visitor arrival and exhibit area, including the ranger station area (kitchenette) and receiving desk. The contractor will re-floor an additional 327 square foot room not shown on the primary plan. Wall removal requirements include dismantling non-structural stud walls, casework, and desks, with specific instructions to safely remove artwork from curved walls. Electrical and technology infrastructure work involves re-routing electrical outlets, LAN wiring, and security alarm systems to support the new ranger contact station desk, with careful coordination required with the Contracting Officer's Representative (COR) for precise positioning and installation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Price_Schedule_-_VC_Upgrades.pdf | ||
| Technical_Questionnaire.docx | DOCX document | |
| Specifications_-_VC_Upgrades.pdf | ||
| Sol_140P6425Q0058.pdf | ||
| Attachment_-_Construction_Contract_Administration.pdf | ||
| Attachment_-_Provisions_to_be_Completed.pdf | ||
| Price_Schedule_-_VC_Upgrades.xlsx | XLSX spreadsheet | |
| Technical_Questionnaire.pdf | ||
| Wage_Determination_-_Montgomery_Co.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLOORING LIMITS FOR REMOVAL AND REPLACEMENT
Location of replica glider exhibit - see scope of work narrative for coordination with COR on park staff moving exhibit as needed to perform work under this contract.
Limits of tile flooring removal and vinyl flooring installation per the scope of work withing the shaded area throughout the primary visitor arrival and exhibit area.
NOTE: Area noted as 'Kitchenette' (ranger station area actual) is to be removed as part of this scope of work as well as the receiving desk. New flooring continues through this space and will have have the separate room, desk, or wall to navigate.NOTE: In addition to area shaded as shown to remove and provide new flooring, the Contractor shall also re-floor with same material one additional room not on this plan that measures 327 s.f.
See scope of work narrative and photos for further description.
WALL AND WORK AREA REMOVALS
Contractor shall remove non-structural stud walls, casework, desk, and associated items as part of the scope of work. The Contractor shall safely remove and turn over to NPS the artwork mounted to the visitor facing curved wall. Salvage and pull all necessary alarm, electrical, and LAN wiring from lower level, without severing connection, and re-route to new location of new ranger contact station desk.
Water drinking fountains to be removed and water line capped by
NPS prior to Contractor mobilizing on site
NEW RANGER STATION WORK
Existing electrical distribution panels located in lower lever at this wall location. New electrical scope of work to tie duplex outlets mounted within new ranger contact station desk to these panels via new floor conduit penetration.
LAN junction box and servers directly below in lower level. New electrical scope of work to tie to new ranger contact station desk from this location via new floor conduit penetration.
Location intended for free standing cabinetry and casework per the scope of work. Contractor to coordinate with COR for finalizing location of
Contractor assembled unit
Location for security alarm re-routing to wall mount within stud wall from lower level location..Provide repair to drywall, including painting for any exposed unfinished material beyond the alarm unit.
Intended location of new ranger contact station desk provided and assembled by Contractor.
Coordinate with COR final positioning and location prior to re-routing any new conduit chases through floor.