Price_Schedule_-_Structure_Demolition.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- Structure Demolition Federal contract opportunity
- Solicitation number
- 140P6425Q0045
About this file
The file is a Price Schedule for a Structure Demolition project at Sleeping Bear Dunes National Lakeshore for the U.S. Department of Interior National Park Service. The solicitation (140P6425Q0045) is a Request for Quote (RFQ) for demolition services valued between $100,000 and $250,000, set to be awarded by June 2025 with performance beginning in late summer 2025. The project is 100% set aside for Total Small Businesses under NAICS Code 238910, with evaluation based on technical factors, prior experience, and pricing.
The demolition scope includes removing and disposing of various structures within Lakeshore boundaries, such as buildings, walls, floors, basements, chimneys, steps, curbs, sidewalks, fences, septic systems, well infrastructure, and associated debris. The contractor will be responsible for obtaining all local, state, and federal permits, with Construction Wage Rate Requirements applying for Benzie County, Michigan. Interested contractors must have an active UEI number and be registered in the System for Award Management (SAM). The point of contact is Christopher Bauer, Contracting Officer, who can be reached at christopher_bauer@nps.gov or 330-468-2500 x5.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Provisions_to_be_Completed.pdf | ||
| Statement_of_Work_-_SLBE_DEMO.pdf | ||
| Sol_140P6425Q0045.pdf | ||
| DOL_Wage_Determination.pdf | ||
| Technical_Questionnaire_-_SLBE_DEMO.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Sleeping Dunes National Park | |
| U.S. Department of Interior | |
| National Park Service |
PROJECT: Structure Demolition
PRICE SCHEDULE
Construction Items Unit Quantity Price/ Unit Subtotal
| Mobilization/Demobilization | ||||
| - Mob/Demob Costs | LS | 1 | $ - 0 | $ - 0 |
| Schnarr Location: Site Preparation/Site Demolition all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| Tobin Location: Site Preparation/Site Demolition all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
Subtotal $ - 0
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Bonds | % | $ - 0 |
Grand Total $ - 0