PRICE SCHEDULE.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- J046--SPS Annual RO and Filter Service Contract
- Solicitation number
- 36C24126Q0011
About this file
The file is a Price Schedule Excel spreadsheet for a Department of Veterans Affairs contract for SPS Annual RO and Filter Services at the Togus VAMC in Augusta, Maine. The contract is a 5-year procurement (base year plus 4 option years) set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 221310. The pricing schedule details eight specific line items for maintenance and replacement of water system components, including carbon filters, DI socks, water storage tank disinfection, endotoxin filter cartridge replacement, UV bulb replacement, composite vent filter replacement, and RO membrane replacement. Notably, all unit prices in the current document are listed at $0.00, suggesting this is a template or draft pricing document.
The solicitation (RFQ Number 36C24126Q0011) is structured as a combined synopsis/solicitation for commercial products and services, with an effective date of 04/18/2025. The procurement is for the Togus VA Medical Center and seeks a vendor to provide annual maintenance and replacement services for specialized water filtration and reverse osmosis (RO) system components. The small business size standard for this procurement is $41 million, and the solicitation indicates that quotes are being requested directly, with no separate written solicitation document to be issued beyond this announcement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1.pdf | ||
| 36C24126Q0011 0001.docx | DOCX document | |
| 36C24126Q0011.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CLIN | UNIT | QUANTITY | DESCRIPTION | Ref CLIN | Comment | Include Comments in Document | Contract Period | Pop Begin | Pop End | UNIT PRICE | NET COST |
| BASE | |||||||||||
| 1 | YR | 1 | Materials to VAME to support quarterly replacement of the carbon filters in SPS | 0.00 | |||||||
| 2 | YR | 1 | Materials to VAME to support monthly replacement of the DI socks in SPS | 0.00 | |||||||
| 3 | YR | 1 | Labor and materials for annual disinfection of the water storage tank and distribution line of the RO water system in SPS | 0.00 | |||||||
| 4 | YR | 1 | Labor and materials for the annual replacement of the 4 Absolute Endotoxin Filter Cartridge Charged for Endotoxin Removal | 0.00 | |||||||
| 5 | YR | 1 | Labor and materials for the annual replacement of the UV Bulb | 0.00 | |||||||
| 6 | YR | 1 | Labor and materials for the annual replacement of the composite vent filter | 0.00 | |||||||
| 7 | YR | 1 | Labor and materials for the annual replacement of the RO Membranes | 0.00 | |||||||
| 8 | YR | 1 | Allowance | 0.00 | |||||||
| BASE YEAR TOTAL | 0.00 | ||||||||||
| Option Year 1 | |||||||||||
| 1 | YR | 1 | Materials to VAME to support quarterly replacement of the carbon filters in SPS | 0.00 | |||||||
| 2 | YR | 1 | Materials to VAME to support monthly replacement of the DI socks in SPS | 0.00 | |||||||
| 3 | YR | 1 | Labor and materials for annual disinfection of the water storage tank and distribution line of the RO water system in SPS | 0.00 | |||||||
| 4 | YR | 1 | Labor and materials for the annual replacement of the 4 Absolute Endotoxin Filter Cartridge Charged for Endotoxin Removal | 0.00 | |||||||
| 5 | YR | 1 | Labor and materials for the annual replacement of the UV Bulb | 0.00 | |||||||
| 6 | YR | 1 | Labor and materials for the annual replacement of the composite vent filter | 0.00 | |||||||
| 7 | YR | 1 | Labor and materials for the annual replacement of the RO Membranes | 0.00 | |||||||
| 8 | YR | 1 | Allowance | 0.00 | |||||||
| OPTION YEAR 1 TOTAL | 0.00 | ||||||||||
| Option Year 2 | |||||||||||
| 1 | YR | 1 | Materials to VAME to support quarterly replacement of the carbon filters in SPS | 0.00 | |||||||
| 2 | YR | 1 | Materials to VAME to support monthly replacement of the DI socks in SPS | 0.00 | |||||||
| 3 | YR | 1 | Labor and materials for annual disinfection of the water storage tank and distribution line of the RO water system in SPS | 0.00 | |||||||
| 4 | YR | 1 | Labor and materials for the annual replacement of the 4 Absolute Endotoxin Filter Cartridge Charged for Endotoxin Removal | 0.00 | |||||||
| 5 | YR | 1 | Labor and materials for the annual replacement of the UV Bulb | 0.00 | |||||||
| 6 | YR | 1 | Labor and materials for the annual replacement of the composite vent filter | 0.00 | |||||||
| 7 | YR | 1 | Labor and materials for the annual replacement of the RO Membranes | 0.00 | |||||||
| 8 | YR | 1 | Allowance | 0.00 | |||||||
| OPTION YEAR 2 TOTAL | 0.00 | ||||||||||
| Option Year 3 | |||||||||||
| 1 | YR | 1 | Materials to VAME to support quarterly replacement of the carbon filters in SPS | 0.00 | |||||||
| 2 | YR | 1 | Materials to VAME to support monthly replacement of the DI socks in SPS | 0.00 | |||||||
| 3 | YR | 1 | Labor and materials for annual disinfection of the water storage tank and distribution line of the RO water system in SPS | 0.00 | |||||||
| 4 | YR | 1 | Labor and materials for the annual replacement of the 4 Absolute Endotoxin Filter Cartridge Charged for Endotoxin Removal | 0.00 | |||||||
| 5 | YR | 1 | Labor and materials for the annual replacement of the UV Bulb | 0.00 | |||||||
| 6 | YR | 1 | Labor and materials for the annual replacement of the composite vent filter | 0.00 | |||||||
| 7 | YR | 1 | Labor and materials for the annual replacement of the RO Membranes | 0.00 | |||||||
| 8 | YR | 1 | Allowance | 0.00 | |||||||
| OPTION YEAR 3 TOTAL | 0.00 | ||||||||||
| Option Year 4 | |||||||||||
| 1 | YR | 1 | Materials to VAME to support quarterly replacement of the carbon filters in SPS | 0.00 | |||||||
| 2 | YR | 1 | Materials to VAME to support monthly replacement of the DI socks in SPS | 0.00 | |||||||
| 3 | YR | 1 | Labor and materials for annual disinfection of the water storage tank and distribution line of the RO water system in SPS | 0.00 | |||||||
| 4 | YR | 1 | Labor and materials for the annual replacement of the 4 Absolute Endotoxin Filter Cartridge Charged for Endotoxin Removal | 0.00 | |||||||
| 5 | YR | 1 | Labor and materials for the annual replacement of the UV Bulb | 0.00 | |||||||
| 6 | YR | 1 | Labor and materials for the annual replacement of the composite vent filter | 0.00 | |||||||
| 7 | YR | 1 | Labor and materials for the annual replacement of the RO Membranes | 0.00 | |||||||
| 8 | YR | 1 | Allowance | 0.00 | |||||||
| OPTION YEAR 4 TOTAL | 0.00 | ||||||||||
| BASE + 4 TOTAL | 0.00 |
File details come from the government source that posted it. Updated .