PRICE SCHEDULE_.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- JOHN A. B. DILLARD DRY DOCK SERVICE Federal contract opportunity
- Solicitation number
- W912P724R0003
About this file
This document contains a price schedule for a dry docking services contract solicitation from the U.S. Army Corps of Engineers Engineering District San Francisco. The price schedule includes line item numbers, brief descriptions of supplies and services required, units of measure, estimated quantities, unit pricing, and total estimated costs. Key supplies and services include laydays, ship delivery, certifications, electricity, fire protection, drydocking to build docking blocks, hull cleaning and painting, inspection and repair of sea chests and valves, replacement of anodes and rudders, balancing and testing of propellers and shafts, fabrication and installation of deck fittings and railings, maintenance of valves and injectors, repair of hydraulic leaks, battery replacement, and interior refurbishing. The solicitation number, agency, and incumbent contractor are provided. Optional line items are included for additional labor, inspections, and crane work not exceeding $100,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P724R0003-CLAUSES.pdf | ||
| JD DRYDOCK PWS 11 20 2023.pdf | ||
| Dillard Contractors Experience Form.docx | DOCX document | |
| Drawings-.pdf | ||
| 2023 JD TECH PROVISIONS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CLIN | SUPPLY / SERVICE | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL |
| 0001 | DD-0.1 Laydays | DAYS | 30 | ||
| 0002 | DD-0.2 Ship Delivery | JOB | 1 | ||
| 0003 | DD-0.3 Chemist Certificates | JOB | 1 | ||
| 0004 | DD-0.4 Electricity | JOB | 1 | ||
| 0005 | DD-0.5 Fire Protection | JOB | 1 | ||
| 0006 | DD-0.6 Drydocking: Build docking blocks to suit vessel | JOB | 1 | ||
| 0007 | Technical Provisions 1.1-1.13 | Info for SubCLins | |||
| 0007AA | TP-1.1 PRESSURE WASH UNDERWATER HULL | JOB | 1 | ||
| 0007AB | TP-1.2 SONIC SURVEY UNDERWATER HULL PLATING | JOB | 1 | ||
| 0007AC | TP-1.3 RENEW ANTIFOULING PAINT | JOB | 1 | ||
| 0007AD | TP-1.4 INSPECT PORT/STBD SEA CHESTS & SEA CHEST VALVES | JOB | 1 | ||
| 0007AE | TP-1.5 RENEW ZINC ANODES ON HULLS, SEA CHESTS, SHAFTS & STERNS | JOB | 1 | ||
| 0007AF | TP-1.6 INSPECT PORT/STBD SHAFTS STERN/STRUT BEARINGS | JOB | 1 | ||
| 0007AG | TP-1.7 INSPECT PORT/STBD RUDDER/STOCK STUFFING BOXES | JOB | 1 | ||
| 0007AH | TP-1.8 INSPECT/BALANCE/NON-DESTRUCTIVE TEST PORT/STBD PROPS & SHAFTS | JOB | 1 | ||
| 0007AJ | TP-1.9 RENEW DELAMINATED PORT/STBD RUDDER(S) | JOB | 1 | ||
| 0007AK | TP-1.10 CROP-OUT & REPLACE PORT/STBD STERN TUBES | JOB | 1 | ||
| 0007AL | TP-1.11 ADD STBD SIDE DEWATERING PUMP TESTING INTAKE SEA CHEST VALVE. | JOB | 1 | ||
| 0007AM | TP-1.12 RELOCATE PORT GENSET INTAKE | JOB | 1 | ||
| 0007AN | TP-1.13 SWAP PROPELLERS | JOB | 1 | ||
| 0008 | Technical Provisions 2.1-2.8 | Info for SubCLins | |||
| 0008AA | TP-2.1 FABERICATE & INSTALL CLOSED BOW CHALK | JOB | 1 | ||
| 0008AB | TP-2.2 REMOVAL OF MID-WORK DECK BOLLARDS | JOB | 1 | ||
| 0008AC | TP-2.3 FABERCATE AND INSTALL PORT AFT WORKDECK BOLLARD DOUBLER | JOB | 1 | ||
| 0008AD | TP-2.4 WORKING DECK SOFT PATCH | JOB | 1 | ||
| 0008AE | TP-2.5 ADD WORK DECK PADEYES | JOB | 1 | ||
| 0008AF | TP-2.6 REMOVE CABIN TOP NON-SKID AND WIFI DOME | JOB | 1 | ||
| 0008AG | TP-2.7 RENEW NON-SKID (WORKDECK, HEAD DECK, SWIM DECK, FORDECK, BRIDGEDECK, GALLEY VESTIBULE & STEPS/LADDERS) | JOB | 1 | ||
| 0008AH | TP-2.8 REPAIR PORT BOW RAILING | JOB | 1 | ||
| 0009 | Technical Provisions 3.1-3.4 | Info for SubCLins | |||
| 0009AA | TP-3.1 MDE SERVICE 96 VALVES & RENEW INJECTORS | JOB | 1 | ||
| 0009AB | TP-3.2 REPAIR HYDRAULIC FLUID LEAK PORT/STBD STEERING SYSTEM RAMS | JOB | 1 | ||
| 0009AC | TP-3.3 SERVICE MDE TURBOS (1000hrs After Cooler Maintenance) | JOB | 1 | ||
| 0009AD | TP-3.4 RENEW HOUSE & START BATTERIES | JOB | 1 |
| 0010 | TP-4.1 INSPECT/REPAIR & PPP EFFER CRANE | JOB | 1 |
| 0011 | Technical Provisions 5.1-5.5 | Info for SubCLins | |
| 0011AA | TP-5.1 INSTALL PORT ENGINE ROOM ACCESS LIFTING PADEYE | JOB | 1 |
| 0011AB | TP-5.2 REPAIR WORKDECK INSTALLED WASHDOWN SYSTEM | JOB | 1 |
| 0011AC | TP-5.3 RENEW INTERIOR CARPETING | JOB | 1 |
| 0011AD | TP-5.4 RENEW BRIDGE OVERHEAD | JOB | 1 |
| 0011AE | TP-5.5 RENEW FIVE FORWARD BRIDGE WINDOW | JOB | 1 |
| 0012 | Technical Provisions 7.1-7.4 Optional | Info for SubCLins | |
| Optional 0012AA | TP-7.1 ADDITIONAL LAY DAYS | DAYS | 30 |
| Optional 0012AB | TP-7.2 MISCELLANEOUS JOURNEYMAN, MECHANIC LABOR AND/OR METAL WORK | DAYS | 30 |
| Optional 0012AC | TP-7.3 INSPECTION RESULTS FROM TP-1.4, TP-1.6, TP-1.7, TP-1.8 & TP-4.1 | JOB | 1 |
| Optional 0012AD | TP-7.4 ADDITIONAL WORK ON THE EFFER CRANE | JOB | 1 |
| 0013 | OVER AND ABOVE WORK | NOT TO EXCCED $100,000.00- NOT AN EVALUATED CLIN |
File details come from the government source that posted it. Updated .