This performance work statement outlines dry dock services and repairs required for the M/V John A.B. Dillard, including cleaning, inspection, repair, fabrication and painting work. The contractor must provide all labor, materials and equipment to dry dock the vessel within five days of award for underwater work such as hull cleaning and painting below the waterline. Additional requirements include testing machinery, gas freeing compartments, and conducting surveys and inspections. The performance period is 90 calendar days for work at a San Francisco Bay area location. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District San Francisco.

View the file

Other files for this federal contract opportunity

Other files attached to JOHN A. B. DILLARD DRY DOCK SERVICE, newest first.
File Type Posted
PRICE SCHEDULE_.xlsx XLSX spreadsheet
W912P724R0003-CLAUSES.pdf PDF
Dillard Contractors Experience Form.docx DOCX document
Drawings-.pdf PDF
2023 JD TECH PROVISIONS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M/V DILLARD DRYDOCK SERVICES AND REPAIRS

17 OCT 22 (Last Edit)

I. Performance Work Statement A. Description of Work

1. The work consists of furnishing all labor, materials, fittings, equipment, tools, power, compressed air, heat, water, etc., and performing all work on USACE Multi- Purpose Vessel John A.B. DILLARD specified herein as ‘DILLARD’. The principal dimensions and physical data for the vessel are shown below:

2. GENERAL DESCRIPTION

Length Overall 87’-7” Breadth/Beam 26’-0" Depth/Draft 6’ Air Draft 42’ Hull Form Catamaran Crowther Material All Welded Aluminum Displacement 95 Long tons Propellers (2) 60”, 4 blade Deck Crane Effer 4400 3S-L Main Engines Caterpillar C-32 v12s Turbos

PORT RNY000305

STBD RNY00309

Reduction Gear Wesmar V2-13E ZF3055a Generators Alaska Diesel Electric 92kw

PORT 0642-44897

STBD 0642-44896

3. The major work scope includes drydocking, inspecting vessel repair, fabrication, and painting assisting as per American Bureau of Shipping (ABS) standards and these specifications.

4. Contractor will provide easy access to all Project Managers, Job Site Supervisors, Lead Journeymen and Office Personnel during the full extent of this contract.

5. The Contractor is not responsible for the costs associated with providing the inspection services of ABS. ABS will be performing a hull and underwater non-destructive surveys during the drydocking.

6. General vessel arrangements and details are included in the attached files named

“Reference Drawings.pdf.” The accuracy of these drawings has not been verified.

Therefore, the Contractor shall template all work from the vessel.

Potential bidders are encouraged to inspect the vessel prior to submitting a bid.

7. Contractor will protect the area affected by work and nearby areas from blasting, painting overspray, transit of goods and equipment, storage or staging associated with work being performed by yard personnel.

8. The Contractor shall furnish all necessary facilities for and shall bear the expense of any movement of the DILLARD during the dry docking and dockside availability.

9. Removal and/or relocation of any parts, equipment, fluids, etc. for interference or access shall be the responsibility of the Contractor. Similarly, all interference and access removals shall be reinstalled at the Contractor expense. Any damage shall be repaired or replaced at the Contractor’s expense.

10. The Contractor's work shall comply with ABS IACS no 47 and USCG "Rules and Regulations for Subchapter I, Vessels" as found in the Code of Federal Regulations (Title 46, CFR).

11. The Contractor’s work shall meet the following additional standards:

National Electric Code (NEC) Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE-45 – Recommended Practice for Electrical Installations on Shipboard.

The National Shipbuilding Research Program (NSRP 0490), January 1998, “Industrial Standards for Hull Structural Penetration Design Criteria and Details.”

B. Unit-Priced Work Statement

1. The Contractor shall notify the Contracting Officer (KO) or the Contracting Officer’s

Representative (COR) when any of the unit-priced work items approach 90% of the agreed amount for the respective items noted in the contract. The Contractor is NOT authorized to exceed the quantity specified for each unit- priced item in this Contract without written authorization from the KO.

2. The Contractor shall perform all definite work items in sufficient time for the KO to direct such unit-priced work items as may be revealed to be necessary by the performance of the definite work items.

3. Before any work can be performed under the unit-priced items, the Contracting Officer must first exercise the option. After the option has been exercised, the COR may direct work under that unit-priced item up to the quantity that is allowed for in the Contract.

4. The direction of any unit-priced work items by the KO or COR will be prompt to allow for completion of the unit-priced work items within the Contract duration.

C. Contract Duration/Location

1. Contract duration is ninety (90) calendar days after delivery of the vessel to Contractor’s yard. The Contractor is responsible for completing all definite and unit priced work items within the ninety (90) calendar day Contract duration.

2. All Contract work shall be performed at a location within San Francisco Bay, CA, Delta and surrounding tributaries.

D. Pre-Bid Vessel Inspections

1. Pre-bid inspections may be held to allow all prospective Offerors to inspect the vessel. The pre-proposal inspections can be held by appointment in Sausalito, CA.

Representatives of prospective Offerors wishing to attend should contact Adam Leach (415) 961-0864 for the specifics of the exact location and time.

2. During the pre-proposal inspections, Offerors will be allowed unencumbered access throughout the entire vessel. Representatives of the Government will be available, but only to the extent necessary to escort Offerors and assist with access.

Government Representatives on the vessel will not discuss the scope of the work or make any technical clarifications or interpretations.

3. After each inspection, a meeting will be held with all participants to allow for the presentation of any questions. This meeting is not for the purpose of educating Offerors that have not carefully reviewed the plans and specifications and have come unprepared. Questions will not be answered at that time but will be acknowledged and recorded. The Government will prepare answers to all questions and forward a copy of both the questions and answers to all prospective Offerors through form Solicitation Amendment.

III. Special Conditions A. Pre-Award Survey, Delivery, Commencement, Completion of Work and Return of DILLARD

1. A Pre-Award Survey may be requested prior to award in accordance with FAR 9.106 to verify that the Contractor is able to comply with the required performance schedule, taking into consideration all existing commercial and government business commitments and has the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.

2. To minimize the vessel’s time out of service and to allow for flexibility in scheduling, the Government will deliver DILLARD to the nearest slip at the Contractor's facility on a date mutually agreed on by the Government and Contractor, not to exceed 30 Calendar Days after Contract Award.

3. The Government will accept return DILLARD to open water, clear of the Contractor's yard or any other berthing facility used in connection with Contract work upon completion of the Contract.

4. The Contractor shall commence the work under the Contract within seven days after delivery of the vessel to the Contractor’s facility and shall execute the work within the duration stated in the Contract. The Contract duration shall be computed from and including the first calendar day after delivery of DILLARD to the Contractor’s facility.

5. The time for completion shall be computed to the hour at which the DILLARD is accepted by the COR in open water clear of the Contractor's yard. The date of completion shall be considered as half a day if the plant is accepted by the COR before 12:00 o'clock Noon and as a whole if accepted after 12:00 o'clock Noon. If all work is not satisfactorily completed when the plant is returned to the COR, the Contractor shall complete the work remaining to be done and any working time lost by the plant thereafter, because of any activities of the Contractor in completing said work, shall be included in the computation of time.

6. Contingency Plans & Documentation

a. Any and all Condition Found Reports (CFR) will be submitted directly to the COR prior to any action being taken by the Contractor, COR will request an Added Work Performed (AWP) to be submitted to the KO along with the CORs recommendations.

b. As is design records of any redesigned components will be the responsibility of the Contractor.

B. Berthing and Docking Services

1. The Contractor shall have a suitable drydock facility available at award. Upon receipt of the vessel, the Contractor shall drydock the vessel within five (5) calendar days and for such time that will be necessary to complete all underwater work included in these specifications. Following completion of underwater work, a drydock shall remain available at all times to the vessel for the duration of the contract.

2. The contactor shall provide electrical shore power (208 volts, 3-phase, 100 amps) to the vessel during the entire shipyard contract performance, including pierside awaiting dry dock. Contractor will provide suitable gangway and pier or dock lighting. Government will provide mooring lines and fendering for the duration of the contract. The vessel will be unmanned in regards to personnel remaining overnight. DILLARD will be secured while the vessel is not being worked on. Vessels will not be tied up alongside or outboard DILLARD.

C. Drydock Submittals Unless specified otherwise, at least forty-eight (48) hours prior to docking/undocking the vessel, submit to the Contracting Officer Representative the following:

1. Drydock certification prior to award at the pre-award survey, the Contractor shall submit to the Contracting Officer certification for the drydock or tentative drydocks to be used to drydock the vessel. The drydock shall be certified for docking the vessel of the dimensions and weight given by one of the following only:

a. US Navy, Naval Sea Systems Command, or US Coast Guard

b. American Bureau of Shipping (ABS)

c. An independent registered Professional Engineer specialized in drydocks, who shall cover the inspection requirements of item (a) or (b) above.

d. The Inspection Certificate shall be within three (3) years if the age of the dock is less than ten (10) years old and within two (2) years if the age of the dock is over ten (10) years old.

e. Floating drydocks shall be one integral unit. The Government will allow the coupling of two rated docks to meet the load requirements of the vessel, provided that the lifting plan used shall include provisions for ensuring integrity of the coupling in the event of foul weather. Linked drydocks shall be certified as an entity.

1. On entering and leaving dry dock, the Contractor shall have charge of, and be responsible for a vessel if not operating under its own power. If tug or pilot service is required during delivery or return of the vessel or at any time during Contractor's custody for maneuvering the vessel between open water and dry dock, slip or berth at the Contractor's yard or other facility, or for moving the vessel for any reason during the course of Contract work, such service shall be promptly furnished by the Contractor at his/her expense. This shall not exclude the right of the Government to move its vessel around the Contractor's premises using the Government's personnel and facilities if the Government representative considers such movement of the vessel to be in the interests of safety of the vessel, or otherwise in the Government's interests. Contract shall notify the Government prior to any vessel movements.

2. The Government shall have the right to access the vessel while in the Contractor's custody with Government hired personnel for the purpose of delivering equipment, materials.

3. The Contractor shall not permit the vessel to go aground or bear upon the bottom of any waterway or any submerged object while in his/her possession. The Contractor shall not perform any Contract work on the vessel if it should accidentally go aground or bear upon any submerged object and shall notify the COR immediately and take the necessary steps to refloat the vessel. The sole exception to this shall be that the vessel shall be allowed to rest or bear upon a drydock which is properly prepared, in accordance with the vessel's drydocking plan.

4. If the Contractor anchors the vessel offshore for the purpose of performing Contract work on the vessel, the Contractor shall convey Government inspectors, crew and hired personnel to and from the vessel at the convenience of the Government at the Contractor's expense. While at such anchorage, the vessel shall be considered in the custody of the Contractor and subject to any pertaining provision of these conditions.

E. Accident Prevention

1. The Contractor shall provide a fire protection plan, flood prevention plan, and safety plan to the COR. All plans shall be in compliance with all federal, state, and local regulations as well as USCG, ABS, and USACE regulations. This information shall be submitted no later than 10 days after the Contract award date and shall be a prerequisite to the start of any work on the vessel.

2. The bulleted items listed below refer to specific areas of accident prevention, however this in no way limits the Contractor’s responsibility to perform all work under this Contract in strict accordance with their fire protection, flood prevention, and safety plans as well as all federal (ex. 29 CFR), state, local, USCG, ABS, and USACE regulations (EM 385-1-1).

D. Contractor's Custody of DILLARD

3. The Contractor shall take all necessary precautions for the protection of the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this Contract. The Contractor shall comply with all pertinent provisions of the Mastership Agreement for Repair and Alteration of Vessels and the Corps of Engineers Safety Manual EM 385-1-1, dated 30 November 2014 entitled "Safety and Health Requirements Manual" as amended and shall also take or cause to be taken such additional measures as the COR may determine to be reasonably necessary for the purpose. The Contractor shall also comply with OSHA Safety and Health Standards 29 CFR. The Contractor shall designate the entire area of work as a hardhat and safety glasses area.

4. A qualified employee shall be designated by the Contractor to be directly responsible for full and immediate compliance with all applicable safety and fire protection requirements. The COR will make a safety inspection of shipyard facilities within 48 hours of the vessel's arrival at the Contractor's yard. At such time the Contractor's safety program will be reviewed with the Contractor's safety representative. In addition to other fire protection measures and hose lines required, the Contractor shall connect a shore fireline to the ship's firemain of the same pressure as required by USCG regulations for service at sea. If at any time, it becomes necessary to disconnect the ships fire main or any part thereof, the Contractor shall furnish individual hose lines to the unprotected locations as required by the Inspection and Manner of Doing Work Clause of the Mastership Agreement for Repair and Alteration of Vessels (DFARS Clause 252.217-7005 - Inspection and Manner of Doing Work). When the specifications require work in areas fitted with the fixed CO2 systems (i.e. machinery spaces), the COR shall be notified prior to commencing work. All work in these areas shall be in strict accordance with 29 CFR 1915.506 and substitute fire protection equipment shall be furnished by the Contractor during the test or repair period.

5. Fire watches shall be posted wherever hot work is performed. Fire watches shall also be posted on the opposite side of all adjacent bulkheads, decks, and overheads where the hot work is performed. All fire watches shall remain on site until 30 minutes after the hot work is completed. For additional requirements, see 29 CFR 1915. It should be noted that 29 CFR 1915.52 (b)(3) only requires additional fire watches for specific conditions, however the Contractor shall provide fire watches for all hot work as mentioned above.

6. The Contractor is responsible for compliance with USCG regulations for handling of inflammable and combustible liquids. Whenever hot work is to be performed, a certified marine chemist's gas-free certificate shall be furnished to the Government representative at the Contractor's expense prior to commencing work. Additionally, a copy of the most recent gas-free certificate shall be posted near the vicinity of the work and at each gangway for the vessel. The Contractor shall have the marine chemist recertify the vessel for all ongoing hot work permits in the event of any vessel movement or change in ballasted condition or in the case of any combustible liquid spillage.

7. All work in confined areas or enclosed spaces shall be performed in accordance with Sections 06.I and 19.A.08 of EM 385-1-1, "Safety and Health Requirements Manual", dated 30 November 2014 as amended. In such areas or spaces, the Contractor shall test for the concentration of oxygen and have immediately available a sufficient number of respirators for everyone working in such areas or spaces. An attendant shall be stationed outside every confined space while work is being performed therein and a rescuer equipped with respirators and retrieval lines shall be immediately available in case of an emergency.

8. The Contractor shall furnish a gangway, conforming to EM 385-1-1, most recent revision, of suitable strength and construction for safe and convenient boarding of the vessel at all times. The gangway shall be installed at an angle of less than 40 degrees and shall have 39-inch high guardrails at both sides. Hatches and openings that present a falling hazard shall be provided with suitable and substantial guards.

9. All exits and passageways shall be kept free of obstructions and shall be kept well lighted at all times.

10. The Contractor shall maintain an accurate record of, and shall report to the COR, in the manner and on the forms prescribed by the COR, exposure data and all accidents, resulting in death, traumatic injury, occupational disease, and/or damage to property, materials, supplies and equipment incident to work performed under this Contract.

11. The COR will notify the Contractor of any non-compliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions. Such notice, when delivered to the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the KO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor.

12. Compliance with the requirements of this provision by any subcontractors shall be the responsibility of the Contractor.

F. Performance of Work by the Government

1. The Government reserves the right to quarter and subsist the crew on the vessel and to perform certain work while the vessel is in the Contractor’s possession.

Government personnel, as well as any other Government Contractors, materials, equipment, and tools, shall be permitted to access the vessel while in the Contractor’s possession and to perform the work mentioned above.

G. Labor Reports

1. The Contractor shall keep and maintain complete payroll records for the duration of time covering the work under this Contract for a period of three (3) years from the end of such periods, and such records shall be made available for Government inspection upon request.

H. Workmanship

1. All labor shall be especially skilled for each kind of work, thorough and first class in every respect, and under competent direction.

2. Where work of one trade joins, passes through or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damaging of previously acceptable construction shall be cause of Contractor's replacement at no additional cost to the Government.

3. All parts of the work intended to join or bear upon others shall have complete and solid surface contact and fit together neatly without excessive cold work during erection. All faying surfaces shall be painted and be clean and smooth before bolting

up. Shims or liners shall not be used for the purpose of overcoming a bad fit.

Stopwaters shall be used only in seams or landings passing through or attached to watertight members.

4. All watertight staples and collars shall be malleable castings or forged from angles close fitting and with solid bearing over the entire faying surface. They may be riveted and caulked or welded watertight. Ends of outstanding flanges shall be cropped. Lightening holes may be punched or burned, and all edges shall have burrs removed.

5. All hull castings shall be machined or ground to bear solidly against the connecting structure and all holes drilled. Holes in members having sharp curvature shall be avoided whenever practicable.

6. All new and disturbed iron and/or steel work shall have its finish restored in kind, or as otherwise indicated by specification.

7. All edges and corners of plates and shapes shall be smooth and free of burrs. The use of a cutting torch is permissible for cutting plates and shapes to size but burning of bolt or rivet holes will not be permitted. New hull or bulkhead plates installed under this Contract shall have 2" minimum radius corners unless otherwise directed by the COR.

8. All welding performed under this Contract shall be accomplished only by welders who have successfully passed the qualification tests of ABS, the American Welding Society and/or the ASME for the type of welding to be performed by each welder.

Copies of the certifications of each welder the Contractor wishes to use for Contract work shall be provided to the COR by the Contractor prior to the beginning of Contract work.

9. The Contractor shall bear the expense of conducting these tests and shall certify by name to the COR, welders who have successfully passed the prescribed test. The Contractor shall require any welder to repeat these tests when, in the opinion of the

COR, the work of the welder indicated a reasonable doubt of his/her efficiency. In such cases, the welder shall be re-certified as above if he/she successfully passes the re-test.

10. The electrodes used throughout the work shall be suitable for use with the parent metal at each weld. Electrodes shall be received on the job in unbroken packages bearing the manufacturer's label or be otherwise marked. Certified statements shall accompany each shipment of electrodes to the effect that sample pieces, representatives of each kind and size in each shipment, have satisfactorily passed the tests required by ABS.

11. All welding procedures shall conform to American Bureau of Shipping standards where applicable. Welding procedures, as to direction, length, number, and sequence of beads, shall be carefully planned to minimize locked up stresses, shrinkage, and distortion.

12. All articles, fittings, equipment, machinery, and supplies used in the work covered by these specifications shall, as far as possible, be the manufacturer's standard articles, of reliable make, the manufacturer's current product, for which spare parts are readily available.

13. All materials, equipment, and machinery installed in or delivered with the vessel shall be new and of the quality specified herein.

I. General Requirements for Surface Preparation, Coating System, and Painting

1. All paint specified to be applied under this Contract shall be furnished by the

Contractor unless stated otherwise.

2. Surface preparation, painting, staining, and varnishing of new and old construction, shall be in compliance with "Painting: New Construction and Maintenance", EM 1110-2-3400, 30 April 1995. All paint in use shall be thoroughly mixed at frequent intervals. Any materials not specified shall be the best of their kind suitable for marine work and subject to the approval of the COR.

3. During all exterior sandblasting and painting operations, the Contractor shall ensure that all areas of the drydock that are open to the atmosphere are covered (i.e. curtained) to prevent the dust cloud from spreading to other areas, specifically outside of the drydock. Similarly, if a marine railway is used for removing the vessel from the water, the Contractor shall ensure that all areas surrounding the vessel are covered to prevent the dust cloud from spreading to other areas.

4. Contractor will protect the area affected by work and nearby areas from blasting, painting overspray, transit of goods and equipment, storage or staging associated with work being performed by yard personnel. Air pressurizing all of the interior spaces to keep dust and other airborne particulates form enter the interior spaces.

The crane will be completely wrap in tarps and tightly wrapped at the turntable.

All joints on the knuckle boom and the grapple will be wrapped. The cutlass bearings, through hulls, shafts and transducers will also be well covered and protected during sandblasting portion of this specification.

5. All surface preparations and painting shall adhere to “DILLARD paint and coating technical specifications reference”.

6. Following the completion of all sandblasting, the Contractor shall remove and properly dispose of all sandblasting grit.

7. Hydroblasting may be utilized in conjunction with sandblasting, however all surfaces shall be sandblasted to provide surface profile.

8. Paint shall not be applied when atmospheric conditions will affect its application or durability.

9. In general, if paint is sprayed, each coat of paint shall consist of a double spray coat in which the surface or section of a surface to be coated is sprayed in a series of half-lapped passes over the surface or section of the surface, and then sprayed again at right angles to the first spraying direction in half-lapped passes.

10. Following completion of all coatings, the Contractor shall provide a report to the COR. The report shall document all coatings, environmental parameters during the application of coatings, and all coating thickness readings. The report shall include a statement from the manufacturer’s representative certifying that the application of all coatings has been performed in accordance with their requirements.

J. Standard Hull Materials

1. All structural hull material shall be in accordance with the current rules of ABS, or with the following specifications:

a. Standard Specifications for Structural Steel: ASTM A131/A131M Rev A;

b. Standard Specifications for Carbon and Alloy Steel Forgings for Thin- Walled

Pressure Vessels: ASTM A372/A372M;

c. Standard Specifications for Steel Castings, Carbon, for General Application:

ASTM A27/A27M;

d. Standard Specifications for Steel Castings, High Strength, for

e. Structural Purposes: ASTM A148/A148M

f. Standard Specifications for Gray Iron Castings: ASTM A48/A48M.

K. Electric Power, Water, and Compressed Air REVIEW SECTION

1. The Contractor shall furnish all necessary compressed air, and electric power for lighting and heating, and for the operations of necessary deck and auxiliary machinery of the vessel while in his possession. The Contractor shall provide water for use on the vessel. Immediately testing 3-phase shore power once the vessel is connected.

2. The Contractor is responsible for providing all labor, hoses, electrical cable, and any other equipment or material needed to make up the connections for the services identified above. The Contractor is also responsible for disconnecting the services at the completion of the Contract.

L. Wharfage, Dockage, Garbage Disposal, Etc.

1. While the plant is in the Contractors possession, the Contractor shall be responsible for any, and pay all expenses of wharfage, dunnage, dockage, mooring lines, garbage disposal, security, etc. The Contractor, after making repairs shall move the boat to a convenient berth for the purpose of testing machinery and taking on supplies. Fresh water for the use of the vessel shall be provided by the Contractor, at his expense, while the vessel is in his possession, and all potable water tanks shall be properly filled on completion of the work and return of the vessel to the Government.

LI. Tests and Trials

1. All machinery or other equipment intending to be installed, repaired or worked on by the Contractor shall be tested prior to and upon completion of all work to demonstrate proper installation and operation to the COR. This shall include all removals for access and/or interference.

2. Rework on any such equipment to demonstrate proper installation and operation shall be performed at the expense of the Contractor.

LII. Contractor's Repair Verification

1. The Contractor shall provide the services of a marine surveyor to audio gauge various locations throughout the vessel in accordance with requirements of this clause. All costs associated with the Contractor's cooperation shall be the responsibility of the Contractor. The Contractor's cooperation during or in connection with such investigations may include, but not be limited to, the following:

a. Dye penetrant, water hose, air lance, and/or vacuum box testing of any welds performed under this Contract;

b. Flooding of areas of decks, small voids, small tanks and small spaces for testing of watertight integrity whether worked on under this Contract or not;

c. Hydrostatic pressure testing of all new piping and all piping that has been worked upon by the Contractor;

d. Manual movement of any unattached objects or any objects which can be easily dismounted or opened and moved anywhere on the vessel;

e. Minor interruptions of work for purposes of inspection not to exceed eight (8) man-hours of such interruptions.

f. Scheduling of work to accommodate inspections of sea valves, sea chests, tanks, hull sections and spaces, machinery and electrical items.

2. Audiogauging non-destructive hull survey will be performed by a certified metal testing agency approved by the American Bureau of Shipping. The contractor will coordinate with the metal testing agency for this inspection. This survey shall be performed immediately upon dry-docking and hull washing. This survey will utilize high frequency sound to measure the hull thickness at specific locations on the hull; at a minimum 100 ultrasonic tests will be performed. A micrometer depth gauge shall be used in conjunction with ultrasonic tests to determine the depth readings including location of each test and existing thickness, results shall be furnished the Government Inspector.

Final test results shall be submitted to the COR within five working days of the completion of the testing. Contractor shall provide labor to move obstructions inside the hull which may interfere with readings and to grind the hull surface for readings as needed.

O. Watch Service RequirementsFORMAT

1. The Contractor shall provide a 24-hour watch service to respond to any emergencies/alarms on the vessel while in the Contractor’s possession. The watch person will be given a key to the DILLARD for use at night, on weekends and on holidays. The Contractor shall provide the name and qualifications of the watch person in writing to the COR. This information shall be submitted no later than 10 days after the Contract award date and shall be a prerequisite to the start of any work on the vessel.

P. Vessel SecurityFORMAT

1. The Contractor is responsible for security while the vessel is in the Contractor’s possession.

Physical means of preventing unauthorized access (i.e. gated access) to the vessel shall be provided in accordance with Federal Acquisition Regulation (FAR) Clause 252.217-7016 - Plant Protection.

Q. Project ScheduleFORMAT

1. The Contractor shall submit to the Government a project schedule with their initial proposal and update it and submit it to the Government on a weekly basis following award. The schedule shall identify the intended start and end date for work under each work item as well as percentage completed for each work item.

R.Gas-Freeing Compartments

1. Within three (3) calendar days after drydocking the vessel, the Contractor shall furnish all labor, material, equipment, and services to gas-free all hull compartments and make each space safe for entry and hot work. The Contractor shall use forced air if needed to gas free the hull compartments.

2. All hull compartments to be gas-freed, tested, and certified.

3. The Contractor shall provide a licensed marine chemist’s gas-free certificates for each space and shall then maintain the chemist’s gas-free conditions for entry and hot work throughout the vessel modifications, including all definite and unit- priced work, until all work has been verified as complete by the COR.

4. If the gas-free conditions are violated at any point during the performance of this work, the Contractor shall bear the full expense of gas-freeing the space and providing an updated marine chemist’s gas-free certificate.

5. The Contractor shall strictly comply with the requirements of EM 385-1-1 “Safety and Health Requirements Manual” as stated above in “Accident Prevention” in regard to gas freeing all spaces requiring hot work.

IV. Docking Considerations

A. The vessel shall be drydocked within five (5) calendar days after delivery of the vessel to Contractor’s yard. The vessel shall be drydocked for such time as may be necessary to complete the work required by this Contract. In particular, but not limited to the following, the vessel shall be drydocked for any exterior hull cleaning and painting below the waterline and for any interior or exterior hull plating, cutting, welding, plate replacement or structural repair or replacement within or upon the hull including hull anodes, rudders, shafts and propellers.

B. Irrespective of whether the vessel is in drydock, the Contractor is responsible for ensuring that there is a suitable drydock or suitable railcar available for the vessel for the entire Contract duration in the event that an emergency drydocking of the vessel should be necessary for any reason.

C. The COR may allow exceptions at his discretion to the necessity for drydocking for various items of work on a case-by-case basis only when informed by the Contractor and allowed to render a decision prior to any work being performed on the requested exception.

D. The vessel shall be drydocked in accordance with the drydocking plan Kvichak Docking Plan #7931-230-002 (to be provided by the COR after award)

E. Drydocking blocks and other drydocking supports shall not obstruct access to remove, work upon, or replace; docking plugs, discharge openings, sea-chests, anodes, shafts, struts, stern tubes, propellers, rudders, or any other hull fittings.

F. The Contractor shall remove and relocate drydocking blocks and/or supports, or refloat and re-drydock the vessel, as needed at no additional cost to the Government in order to assure complete coverage in cleaning and painting or for any other work as specified herein. Prior to doing so, the Contractor shall notify the COR of their plan to relocate the blocks to adequately support the vessel.

G. The Contractor shall install temporary grounding straps from the vessel's hull to the dry dock's steel structure. The Contractor shall ensure that the straps will adequately protect the vessel from any stray currents that may be present from shore side power source.

H. Any direction by the COR for work required under these specifications including the direction of unit-priced work items which extends drydocking time within the overall Contract duration shall not result in any additional cost to the Government.

I. Prior to undocking the vessel, the Contractor shall notify the COR and the master of the vessel. Notification shall be provided a minimum of forty-eight (48) hours prior to undocking.

J. When undocking the vessel, all interior spaces and systems affected by work performed under this Contract shall be inspected for leakage, watertight integrity and/or seaworthiness by the Contractor and witnessed by COR or designated Government Representative.

V. SECURITY

The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

1. Antiterrorism (AT) Level I training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

2. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location.

Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

3. Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something):

All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

4. Threat Awareness Reporting Program: All contract personnel who maintain an active security clearance shall receive initial and annual refresher training on the Threat Awareness and Reporting Program (commonly referred to as “TARP”), provided by a Counterintelligence Agent. As determined by the servicing Counterintelligence Agent for the RA, contract personnel may complete web-based TARP training.

5. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

QUALITY ASSURANCE SURVEILLANCE PLAN

John A.B. Dillard Dry-dock Services and Repairs

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

What will be monitored.

How monitoring will take place.

Who will conduct the monitoring.

How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a "living document" and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor.

Updates shall ensure that the QASP remains a valid, useful, and enforceable document.

Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

The following FAR clauses may apply depending on contract type:

52.246-4 Inspection of Services – Fixed-Price,

2. GOVERNMENT ROLES AND RESPONSIBILITIES.

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned KO: SUNTOK MCGUINNESS Organization or Agency: USACE, San Francisco District Telephone: (415) 503-2953

Email: suntok.mcguinness@usace.army.mil

c. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the

Quality Assurance Surveillance Plan (QASP) W912P724R0003 contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.

Assigned COR:

Douglas Meyer (Kixon) Title: Captain Supervisor Telephone: (510) 590-8181 Email:douglas.b.meyer@usace.army.mil

3. CONTRACTOR REPRESENTATIVES:

The Contractor is responsible for quality control and shall establish and maintain an effective quality control system. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product, which complies with the contract requirements. The system shall cover all service operations, both onsite and offsite. The project manager will be held responsible for the quality of work on the job and is subject to removal by the Contracting Officer for non-compliance with quality requirements specified in the contract. The project manager in this context shall mean the individual with the responsibility for the overall management of the project including quality and production.

The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract.

a. Program Manager - Telephone:

email:

4. QUALITY CONTROL PLAN

The QC Plan shall include, as a minimum, the following to cover all operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents:

a) A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the QC staff shall implement the three phase control system for all aspects of the work specified.

b) Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures shall be in accordance with Section 5

SUBMITTAL PROCEDURES.

c) Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test.

d) Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.

e) Procedures for tracking deficiencies from identification through acceptable corrective action. These procedures will establish verification that identified deficiencies have been corrected.

f) Reporting procedures, including proposed reporting formats.

A list of the definable features of work; a definable feature of work is a task which is separate and distinct from other tasks and has separate control requirements. Different trades or disciplines could identify it, or it could be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there is frequently more than one definable feature under a particular section. This list will be agreed upon during the coordination meeting

Acceptance of Plan

Acceptance of the Contractor's plan is required prior to the start of work. Acceptance is conditional and will be predicated on satisfactory performance during the repairs. The Government reserves the right to require the Contractor to make changes in his QC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.

Notification of Changes

After acceptance of the QC Plan, the Contractor shall notify the CO or COR in writing of any proposed change. Proposed changes are subject to acceptance by the CO or COR.

Coordination Meeting

The Contractor shall meet with the COR and discuss the Contractor's quality control system. The QC Plan shall be submitted for review a minimum of seven calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the QC operations, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management and control with the Government's Quality Assurance. Minutes of the meeting shall be prepared by the Government and signed by both the Contractor and the COR. The minutes shall become a part of the contract file. There may be occasions when either party to reconfirm mutual understandings and/or address deficiencies in the QC system will call subsequent conferences or procedures which may require corrective action by the Contractor.

SUBMITTALS

Submittals shall be made as specified in Part 5 Submittal Procedures. The

QC organization shall be responsible for certifying that all submittals are in compliance with the contract requirements.

CONTROL

Contractor Quality Control is the means by which the Contractor ensures that the services, to include that of subcontractors and suppliers, complies with the requirements of the contract. The QC System Manager for each, definable feature of work shall conduct at least three phases of control as follows:

Preparatory Phase

This phase shall be performed prior to beginning work on each definable feature of work; after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase shall include:

g) A review of each paragraph of applicable specifications.

h) A review of the contract drawings.

i) A check to assure that all materials and/or equipment have been tested, submitted, and approved.

j) Review of provisions that have been made to provide required control inspection and testing.

k) Examination of the work area to assure that all required preliminary work has been completed and is in…

This is the start of the file's text. The full file is on GovTribe.