Price Schedule.pdf
PDF 69 KB Posted
- Attached to
- Roof Rehabilitation at The Oaks
- Solicitation number
- 140P5121Q0012
About this file
This price schedule outlines the line items for a roof rehabilitation project at The Oaks, a historic site within Tuskegee Institute National Historic Park. The National Park Service seeks bids to replace the metal roof and repair box gutters, roof framing, masonry, and millwork at the site. Pricing is required for 18 base line items including mobilization, bonds, general conditions, existing conditions assessments, roof repairs and replacements, and finishes work. Bidders must also provide pricing for all option line items. The total proposed price should encompass the base line items and all options. This project aims to rehabilitate the roof at The Oaks, a contributing building to the Tuskegee Institute National Historic Site, in order to preserve the historic resource.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 140P5121Q0012_0002.pdf | ||
| Updated Price Schedule_0002.xlsx | XLSX spreadsheet | |
| Sol_140P5121Q0012_Amd_0002.pdf | ||
| Specifications 073116 Metal Shingles_0001.pdf | ||
| Site Visit Information_0001.pdf | ||
| Sol_140P5121Q0012_Amd_0001.pdf | ||
| Drawings.pdf | ||
| Sol_140P5121Q0012.pdf | ||
| Specifications.pdf | ||
| Wage Determination.pdf | ||
| Solicitation 140P5121Q0012.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Price Schedule National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number: 140P5120Q0012
PARK - PMIS: TUIN - 225596
(Project Management Information System)
Developed Area: THE OAKS - TUSKEGEE INSTITUTE NATIONAL HISTORIC SITE Project Title: THE OAKS ROOF REHABILITATION
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
Contract Line Item Number
(CLIN)
Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price
1 Mobilizaton
2 Bonds
3 Standard General Conditons
4 Government General Conditons
5 Construction Contingency
6 Existing Conditions: Roofing
7 Existing Conditions: Removal of Existing Roofing
8 Masonry Restoration (Above Roof)
9 Historic Wood Repair: Millwork Repair (Consolidants)
10 Historic Wood Repair: Millwork Repair (Dutchman)
11 Historic Wood Repair: Millwork Repair (Replacement)
12 Rough Carpentry: Roof Framing/Decking
13 Roofing: Prep and Deck Repair
14 Roofing: New Metal Shingles
15 Roofing: New 5-V Metal Roof
16 Roofing: Box Gutter Repair
17 Roof: Accessories
18 Finishes: Paint Prep and Painting
TOTAL BASE PRICE (Contract Line Item Number 1 through 18) -------------------------------------------------------------------------------- $0.00
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number X through XX) ----------------------------------------------------------- $0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 18) -------------------------- $0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.