Price_Schedule.docx
DOCX document 17 KB Posted
- Attached to
- MRG SFD 39 D7 DOZER REPAIR
- Solicitation number
- 140R4025Q0039
About this file
The document is a Price Schedule for a federal contract opportunity (Solicitation Number: 140R4025Q0039) issued by the Department of the Interior Bureau of Reclamation for MRG SFD 39 D7 Dozer Repair. The pricing schedule outlines specific tasks related to transmission repair and replacement, including removal and installation of components such as torque converter, oil cooler, and gear pump, as well as associated tasks like replacing seals, o-rings, and gaskets, and flushing transmission fluid.
The pricing structure requires contractors to provide a comprehensive quote that includes labor hours, parts costs, core charge and inspection fees, and additional charges like taxes and handling. The solicitation stipulates that offers will be evaluated based on the total annual costs of the base year and all option year Contract Line Item Numbers (CLINs), and that offers must cover the entire schedule, not just a portion of it. Potential vendors must submit a complete pricing breakdown that encompasses all specified repair and replacement tasks for the D7 Dozer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MRG_SFD_39_D7_Dozer_Torque_Converter_SOW.docx | DOCX document | |
| Wage_Determination_2015-5855.pdf | ||
| Sol_140R4025Q0039.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B – SUPPLIES OR SERVICES AND PRICES
SCHEDULE
Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the schedule.
Offers will be evaluated based on the total annual costs of the base year and all option year CLINs.
Offers are subject to the terms and conditions of this solicitation.
| Tasks |
| Quantity |
| Unit |
| Unit Price |
| Total Price |
-Remove and Install Torque Converter
- Remove and install oil cooler
- Remove and install gear pump
- Replace seals
- Replace o-rings
- Replace gasket
- Replace and flush transmission fluid
| Please list # of hours |
| Hours |
Parts
| Torque Converter |
| 1 |
| Lump Sum |
| Oil cooler |
| 1 |
| Lump Sum |
| Cost to return core charge and inspect |
| 1 |
| Lump Sum |
Other
Taxes
Other fees (List)
Handling and Inspection Core
Total Price:
Definition(s) CLIN – Contract Line Item Number
File details come from the government source that posted it. Updated .