Price Schedule - BAR-R OM - JAN 2024_final.xlsx

XLSX spreadsheet 81 KB Posted

Attached to
Lake Barkley Operation and Maintenance Services Requirements Contract
Solicitation number
W912P524R0006
Issued by

About this file

This document outlines a federal small business set-aside solicitation for operation and maintenance services at Lake Barkley. The U.S. Army Corps of Engineers Nashville District is seeking a firm-fixed price requirements contract for one base year and four option years. Services include grass mowing, cleaning, janitorial work, facility repair, water treatment plant operation, and more. The NAICS code is 561210 with a $47 million size standard. A site visit is scheduled for January 18, 2024 and registration is required by January 15. The solicitation number is W912P524R0006. Proposals are due based on the solicitation posting, with award to the best value offer. The period of performance is from contract award through December 2024 for the base year and optional extensions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

Lake Barkley - Operation and Maintenance Services
This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools,
parts, equipment, and vehicles required to perform operations and maintenances services at Lake Barkley with
options to extend the term of the contract.

BASE YEAR

SECTION 2 - Grass Mowing
NTEUnit
Item #Quant.UnitPriceTotal
0001Canal Campground- Hill loop18Ea.$ - 0$ - 0
0002Canal Campground- Beach loop18Ea.$ - 0$ - 0
0003Canal Campground- Woods loop18Ea.$ - 0$ - 0
0004Canal Campground- Primitive loop18Ea.$ - 0$ - 0
0005Canal Campground- Fisherman's loop18Ea.$ - 0$ - 0
0006Canal Campground- Point loop18Ea.$ - 0$ - 0
0007Canal Campground- The View loop18Ea.$ - 0$ - 0
0008Canal Campground- Entrance area and Road18Ea.$ - 0$ - 0
0009Canal Overlook11Ea.$ - 0$ - 0
0010Dam Site Left Bank17Ea.$ - 0$ - 0
0011Left Bank Tailwater Embankment (Slope)11Ea.$ - 0$ - 0
0012Dam Site Right Bank17Ea.$ - 0$ - 0
0013Dam Site Right Bank warehouse area & roads11Ea.$ - 0$ - 0
0014Dam Embankment Left Bank11Ea.$ - 0$ - 0
0015Dam Embankment Right Bank -- Lower Slope11Ea.$ - 0$ - 0
0016Dam Embankment Right Bank -- Upper Slope11Ea.$ - 0$ - 0
0017Resource Office/Visitor Center18Ea.$ - 0$ - 0
0018Barkley Lock Area18Ea.$ - 0$ - 0
0019Eureka Campground area16Ea.$ - 0$ - 0
0020Eureka Picnic, Shelter and Launching area17Ea.$ - 0$ - 0
0021Boyds Landing11Ea.$ - 0$ - 0
0022Poplar Creek11Ea.$ - 0$ - 0
0023Kuttawa17Ea.$ - 0$ - 0
0024Eddyville -- Lower Slope11Ea.$ - 0$ - 0
0025Eddyville -- Upper Slope11Ea.$ - 0$ - 0
0026Coleman Bridge11Ea.$ - 0$ - 0
0027Drydens Creek11Ea.$ - 0$ - 0
0028Hurricane Creek17Ea.$ - 0$ - 0
0029Rockcastle17Ea.$ - 0$ - 0
0030Rivers End11Ea.$ - 0$ - 0
0031Little River11Ea.$ - 0$ - 0
0032Cadiz17Ea.$ - 0$ - 0
0033Devils Elbow11Ea.$ - 0$ - 0
0034Calhoun Hill11Ea.$ - 0$ - 0
0035Linton17Ea.$ - 0$ - 0
0036Tobacco Port11Ea.$ - 0$ - 0
0037Bumpus Mills Entrance, road and day use14Ea.$ - 0$ - 0
0038Bumpus Mills Campground area14Ea.$ - 0$ - 0
0039Saline Creek11Ea.$ - 0$ - 0
0040Blue Creek11Ea.$ - 0$ - 0
0041Dyers Creek17Ea.$ - 0$ - 0
0042Dover17Ea.$ - 0$ - 0
0043Hickman Creek & Dover radio tower11Ea.$ - 0$ - 0
0044Canal Overlook Slope11Ea.$ - 0$ - 0
0045Drain Field at Resource Office11Ea.$ - 0$ - 0
0046Road Shoulders & Fleet Storage Area11Ea.$ - 0$ - 0
0047Left Bank Berm11Ea.$ - 0$ - 0
0048Tree Removal 6"-12" ABH30Ea.$ - 0$ - 0
0049Tree Removal 12"-18" ABH25Ea.$ - 0$ - 0
0050Tree Removal 18"-24" ABH25Ea.$ - 0$ - 0
0051Tree Removal 24"-30" ABH25Ea.$ - 0$ - 0
0052Tree Removal 30" and greater ABH10Ea.$ - 0$ - 0
0053Perimeter Trimming5,000Ft.$ - 0$ - 0

SECTION 2 - Subtotal $ - 0

SECTION 3 - Cleaning Services - Recreational Facilities and Areas
NTEUnit
Item #Quant.UnitPriceTotal
0054Restrooms1,400Ea.$ - 0$ - 0
0055Washhouses1,400Ea.$ - 0$ - 0
0056Shelters2,500Ea.$ - 0$ - 0
0057Minishelters3,000Ea.$ - 0$ - 0
0058Campsites11,000Ea.$ - 0$ - 0
0059Litter - Canal Campground225Ea.$ - 0$ - 0
0060Litter - Campgrounds650Ea.$ - 0$ - 0
0061Litter - Day Use/High Use1,200Ea.$ - 0$ - 0
0062Litter - Day Use/Moderate Use1,200Ea.$ - 0$ - 0
0063Litter - Boat Ramps1,500Ea.$ - 0$ - 0
0064Dumpsters800Ea.$ - 0$ - 0
0065Additional Cleaning350Hr.$ - 0$ - 0
0066Pre-Season Cleaning Canal1Ea.$ - 0$ - 0
0067Pre-Season Cleaning Campgrounds3Ea.$ - 0$ - 0
0068Pre-Season Cleaning Day Use5Ea.$ - 0$ - 0

SECTION 3 - Subtotal $ - 0

SECTION 4 - Janitorial Services - Barkley Resource
NTEUnit
Item #Quant.UnitPriceTotal
0069Janitorial Services -- Resource Office12Mo.$ - 0$ - 0
0070Janitorial Services -- Shop12Mo.$ - 0$ - 0
0071Additional Janitorial Cleaning Hours60Hr.$ - 0$ - 0
0072Non-Routine Janitorial100Hr.$ - 0$ - 0

SECTION 4 - Subtotal $ - 0

SECTION 5- Facility Repair, Maintenance, and Other Non-Routine Work
NTEUnit
Item #Quant.UnitPriceTotal
Note: Item # 0073 - 00101: Bid should be based on Wage Rate Requirements (Construction) Act Wage Rates
0073Carpenter350Hr.$ - 0$ - 0
0074Concrete Finisher250Hr.$ - 0$ - 0
0075Electrician200Hr.$ - 0$ - 0
0076Heavy Equipment Operator/Truck Driver100Hr.$ - 0$ - 0
0077Mason (block/brick/rock layer)80Hr.$ - 0$ - 0
0078Concrete/Pavement Saw (12" min)40Hr.$ - 0$ - 0
0079Concrete Mixer, Portable40Hr.$ - 0$ - 0
0080Generator, Portable100Hr.$ - 0$ - 0
0081Laborer1,400Hr.$ - 0$ - 0
0082Painter300Hr.$ - 0$ - 0
0083Plumber200Hr.$ - 0$ - 0
0084Backhoe/Loader w/Operator (case 580 Equiv)300Hr.$ - 0$ - 0
0085Chainsaw W/Operator (3.2 cc /in eng or better)150Hr.$ - 0$ - 0
0086Dozer/Crawler D6 minimum w/Operator50Hr.$ - 0$ - 0
0087Skid Loader w/ Operator (Bobcat 743 equiv. or Better)300Hr.$ - 0$ - 0
0088Compressor (Joy 175 or better)50Hr.$ - 0$ - 0
0089Tractor (Ford 4000 Equiv or better w/attachments (Auger, blade, loader bucket, mower/brush hog unit) w/Operator80Hr.$ - 0$ - 0
0090Trailer, 6 ton (for material hauling)100Hr.$ - 0$ - 0
0091Trencher (Ditchwitch 3700 Equiv or better) w/Operator200Hr.$ - 0$ - 0
0092Truck, Dump 14 ton cap w/Driver100Hr.$ - 0$ - 0
0093Plate Tamper100Hr.$ - 0$ - 0
0094Pick-up 1/2 ton or better w/Driver100Hr.$ - 0$ - 0
0095Truck, 1 ton flat or dump bed w/Driver100Hr.$ - 0$ - 0
0096Truck, bucket w/50-80 ft boom and Driver200Hr.$ - 0$ - 0
0097Truck, tandum dump w/Driver100Hr.$ - 0$ - 0
0098Truck, tri-ax dump w/Driver100Hr.$ - 0$ - 0
0099Welder, portable (Lincoln K1292 Equiv. or better)40Hr.$ - 0$ - 0
0100Track Hoe/Excavator (Case CX 50 B, 41 hp or better ) 24" w/Operator200Hr.$ - 0$ - 0
0101Track Hoe/Excavator (Case CX160 B, 120 hp or better ) 1/2 yd bk w/Operator200Hr.$ - 0$ - 0
Note: Item # 0102 - 0128: Bid should be based on Service Contract Labor Standards Act Wage Rates
0102Emergency Work Surcharge40Hr.$ - 0$ - 0
0103Carpenter200Hr.$ - 0$ - 0
0104General Maintenance Worker400Hr.$ - 0$ - 0
0105Electrician200Hr.$ - 0$ - 0
0106Equipment Operator80Hr.$ - 0$ - 0
0107Generator, Portable (4,000 watt)80Hr.$ - 0$ - 0
0108Laborer1,400Hr.$ - 0$ - 0
0109Painter200Hr.$ - 0$ - 0
0110Plumber200Hr.$ - 0$ - 0
0111Backhoe/Loader (Case 580 Equivalent) w/Operator300Hr.$ - 0$ - 0
0112Chain Saw W/Operator (3.2 cu/in Engine)200Hr.$ - 0$ - 0
0113Pesticide Applicator w/Certified Operator40Hr.$ - 0$ - 0
0114Dozer (D-6 Equivalent minimum) w/Operator80Hr.$ - 0$ - 0
0115Skid Loader (Bobcat 743 Equivalent, min) w/Operator300Hr.$ - 0$ - 0
0116Compressor (Joy 175 Equivalent)80Hr.$ - 0$ - 0
0117Tractor, (Ford 4000 Equiv. w/attach. Brush hog, mower unit, blade, bucket) w/Operator80Hr.$ - 0$ - 0
0118Trailer, 6 Ton (for hauling materials)80Hr.$ - 0$ - 0
0119Trencher (Hydra-Trencher 2400 Equivalent) w/Operator80Hr.$ - 0$ - 0
0120Truck, Dump (14 ton load cap., Bob-truck) w/Driver200Hr.$ - 0$ - 0
0121Plate tamper80Hr.$ - 0$ - 0
0122Pick up truck, 1/2 ton minimum w/Driver100Hr.$ - 0$ - 0
0123Truck, 1 ton (flat bed dump) w/Driver100Hr.$ - 0$ - 0
0124Truck, Bucket w/50'-80' boom w/Operator100Hr.$ - 0$ - 0
0125Truck, Knuckle boom w/Operator120Hr.$ - 0$ - 0
0126Excavator (track hoe), 10,000lb cap. min. w/Operator100Hr.$ - 0$ - 0
0127Chipper, wood 12" cap or better140Hr.$ - 0$ - 0
0128Truck, dump (27 ton load cap.) w/Operator200Hr.$ - 0$ - 0

SECTION 5 - Subtotal $ - 0

SECTION 6 - Bumpus Mills Water Treatment Plant
NTEUnit
Item #Quant.UnitPriceTotal
0129Operate Water Treatment Plant6Mo.$ - 0$ - 0
0130Opening Preparation of System1Ea.$ - 0$ - 0
0131Shutdown of Water System1Ea.$ - 0$ - 0
0132Additional Water testing (after line repair)20Ea.$ - 0$ - 0

SECTION 6 - Subtotal $ - 0

SECTION 7 - Beaches and Playgrounds
NTEUnit
Item #Quant.UnitPriceTotal
0133Beach Maintenance350Ea.$ - 0$ - 0
0134Playground Maintenance350Ea.$ - 0$ - 0
0135Water Testing180Ea.$ - 0$ - 0

SECTION 7 - Subtotal $ - 0

SECTION 8 - Boundary Line Marking and Repainting
NTEUnit
Item #Quant.UnitPriceTotal
0136Marking and Painting Boundary Line30Mi.$ - 0$ - 0

SECTION 8 - Subtotal $ - 0

SECTION 9- Janitorial Services for Kentucky Lock
NTEUnit
Item #Quant.UnitPriceTotal
0137Services for Kentucky Lock12Mo.$ - 0$ - 0

SECTION 9 - Subtotal $ - 0

SECTION 10- Janitorial Services for Barkley Power Plant
NTEUnit
Item #Quant.UnitPriceTotal
0138Powerplant Outside Areas12Mo.$ - 0$ - 0
0139Powerplant Operations Areas12Mo.$ - 0$ - 0
0140Powerplant Shop Areas12Mo.$ - 0$ - 0

SECTION 10 - Subtotal $ - 0

SECTION 11- Janitorial Services for Barkley Lock
NTEUnit
Item #Quant.UnitPriceTotal
0141Services for Barkley Lock12Mo.$ - 0$ - 0

SECTION 11 - Subtotal $ - 0

SECTION 12- Additional Janitorial Services
NTEUnit
Item #Quant.UnitPriceTotal
0142Enhanced Cleanings100Ea.$ - 0$ - 0
0143Deep Cleaning100Hrs$ - 0$ - 0

SECTION 12 - Subtotal $ - 0

SECTION 13- Pavement Striping and Sealing
NTEUnit
Item #Quant.UnitPriceTotal
0144Pavement Striping12,500Lin. Ft.$ - 0$ - 0
0145Pavement Sealing12,500Sq. Yd.$ - 0$ - 0

SECTION 13 - Subtotal $ - 0

BASE YEAR TOTAL $ - 0

OPTION YEAR 1

SECTION 2 - Grass Mowing
NTEUnit
Item #Quant.UnitPriceTotal
1001Canal Campground- Hill loop18Ea.$ - 0$ - 0
1002Canal Campground- Beach loop18Ea.$ - 0$ - 0
1003Canal Campground- Woods loop18Ea.$ - 0$ - 0
1004Canal Campground- Primitive loop18Ea.$ - 0$ - 0
1005Canal Campground- Fisherman's loop18Ea.$ - 0$ - 0
1006Canal Campground- Point loop18Ea.$ - 0$ - 0
1007Canal Campground- The View loop18Ea.$ - 0$ - 0
1008Canal Campground- Entrance area and Road18Ea.$ - 0$ - 0
1009Canal Overlook11Ea.$ - 0$ - 0
1010Dam Site Left Bank17Ea.$ - 0$ - 0
1011Left Bank Tailwater Embankment (Slope)11Ea.$ - 0$ - 0
1012Dam Site Right Bank17Ea.$ - 0$ - 0
1013Dam Site Right Bank warehouse area & roads11Ea.$ - 0$ - 0
1014Dam Embankment Left Bank11Ea.$ - 0$ - 0
1015Dam Embankment Right Bank -- Lower Slope11Ea.$ - 0$ - 0
1016Dam Embankment Right Bank -- Upper Slope11Ea.$ - 0$ - 0
1017Resource Office/Visitor Center18Ea.$ - 0$ - 0
1018Barkley Lock Area18Ea.$ - 0$ - 0
1019Eureka Campground area16Ea.$ - 0$ - 0
1020Eureka Picnic, Shelter and Launching area17Ea.$ - 0$ - 0
1021Boyds Landing11Ea.$ - 0$ - 0
1022Poplar Creek11Ea.$ - 0$ - 0
1023Kuttawa17Ea.$ - 0$ - 0
1024Eddyville -- Lower Slope11Ea.$ - 0$ - 0
1025Eddyville -- Upper Slope11Ea.$ - 0$ - 0
1026Coleman Bridge11Ea.$ - 0$ - 0
1027Drydens Creek11Ea.$ - 0$ - 0
1028Hurricane Creek17Ea.$ - 0$ - 0
1029Rockcastle17Ea.$ - 0$ - 0
1030Rivers End11Ea.$ - 0$ - 0
1031Little River11Ea.$ - 0$ - 0
1032Cadiz17Ea.$ - 0$ - 0
1033Devils Elbow11Ea.$ - 0$ - 0
1034Calhoun Hill11Ea.$ - 0$ - 0
1035Linton17Ea.$ - 0$ - 0
1036Tobacco Port11Ea.$ - 0$ - 0
1037Bumpus Mills Entrance, road and day use14Ea.$ - 0$ - 0
1038Bumpus Mills Campground area14Ea.$ - 0$ - 0
1039Saline Creek11Ea.$ - 0$ - 0
1040Blue Creek11Ea.$ - 0$ - 0
1041Dyers Creek17Ea.$ - 0$ - 0
1042Dover17Ea.$ - 0$ - 0
1043Hickman Creek & Dover radio tower11Ea.$ - 0$ - 0
1044Canal Overlook Slope11Ea.$ - 0$ - 0
1045Drain Field at Resource Office11Ea.$ - 0$ - 0
1046Road Shoulders & Fleet Storage Area11Ea.$ - 0$ - 0
1047Left Bank Berm11Ea.$ - 0$ - 0
1048Tree Removal 6"-12" ABH30Ea.$ - 0$ - 0
1049Tree Removal 12"-18" ABH25Ea.$ - 0$ - 0
1050Tree Removal 18"-24" ABH25Ea.$ - 0$ - 0
1051Tree Removal 24"-30" ABH25Ea.$ - 0$ - 0
1052Tree Removal 30" and greater ABH10Ea.$ - 0$ - 0
1053Perimeter Trimming5,000Ft.$ - 0$ - 0

SECTION 2 - Subtotal $ - 0

SECTION 3 - Cleaning Services - Recreational Facilities and Areas
NTEUnit
Item #Quant.UnitPriceTotal
1054Restrooms1,400Ea.$ - 0$ - 0
1055Washhouses1,400Ea.$ - 0$ - 0
1056Shelters2,500Ea.$ - 0$ - 0
1057Minishelters3,000Ea.$ - 0$ - 0
1058Campsites11,000Ea.$ - 0$ - 0
1059Litter - Canal Campground225Ea.$ - 0$ - 0
1060Litter - Campgrounds650Ea.$ - 0$ - 0
1061Litter - Day Use/High Use1,200Ea.$ - 0$ - 0
1062Litter - Day Use/Moderate Use1,200Ea.$ - 0$ - 0
1063Litter - Boat Ramps1,500Ea.$ - 0$ - 0
1064Dumpsters800Ea.$ - 0$ - 0
1065Additional Cleaning350Hr.$ - 0$ - 0
1066Pre-Season Cleaning Canal1Ea.$ - 0$ - 0
1067Pre-Season Cleaning Campgrounds3Ea.$ - 0$ - 0
1068Pre-Season Cleaning Day Use5Ea.$ - 0$ - 0

SECTION 3 - Subtotal $ - 0

SECTION 4 - Janitorial Services - Barkley Resource
NTEUnit
Item #Quant.UnitPriceTotal
1069Janitorial Services -- Resource Office12Mo.$ - 0$ - 0
1070Janitorial Services -- Shop12Mo.$ - 0$ - 0
1071Additional Janitorial Cleaning Hours60Hr.$ - 0$ - 0
1072Non-Routine Janitorial100Hr.$ - 0$ - 0

SECTION 4 - Subtotal $ - 0

SECTION 5- Facility Repair, Maintenance, and Other Non-Routine Work
NTEUnit
Item #Quant.UnitPriceTotal
Note: Item # 1073 - 1101: Bid should be based on Wage Rate Requirements (Construction) Act Wage Rates
1073Carpenter350Hr.$ - 0$ - 0
1074Concrete Finisher250Hr.$ - 0$ - 0
1075Electrician200Hr.$ - 0$ - 0
1076Heavy Equipment Operator/Truck Driver100Hr.$ - 0$ - 0
1077Mason (block/brick/rock layer)80Hr.$ - 0$ - 0
1078Concrete Saw40Hr.$ - 0$ - 0
1079Concrete Mixer, Portable40Hr.$ - 0$ - 0
1080Generator, Portable100Hr.$ - 0$ - 0
1081Laborer1,400Hr.$ - 0$ - 0
1082Painter300Hr.$ - 0$ - 0
1083Plumber200Hr.$ - 0$ - 0
1084Backhoe/Loader w/Operator (case 580 Equiv)300Hr.$ - 0$ - 0
1085Chainsaw W/Operator (3.2 cc /in eng or better)150Hr.$ - 0$ - 0
1086Dozer/Crawler D6 minimum w/Operator50Hr.$ - 0$ - 0
1087Skid Loader w/ Operator (Bobcat 743 equiv. or Better)300Hr.$ - 0$ - 0
1088Compressor (Joy 175 or better)50Hr.$ - 0$ - 0
1089Tractor (Ford 4000 Equiv or better w/attachments (Auger, blade, loader bucket, mower/brush hog unit) w/Operator80Hr.$ - 0$ - 0
1090Trailer, 6 ton (for material hauling)100Hr.$ - 0$ - 0
1091Trencher (Ditchwitch 3700 Equiv or better) w/Operator200Hr.$ - 0$ - 0
1092Truck, Dump 14 ton cap w/Driver100Hr.$ - 0$ - 0
1093Plate Tamper100Hr.$ - 0$ - 0
1094Pick-up 1/2 ton or better w/Driver100Hr.$ - 0$ - 0
1095Truck, 1 ton flat or dump bed w/Driver100Hr.$ - 0$ - 0
1096Truck, bucket w/50-80 ft boom and Driver200Hr.$ - 0$ - 0
1097Truck, tandum dump w/Driver100Hr.$ - 0$ - 0
1098Truck, tri-ax dump w/Driver100Hr.$ - 0$ - 0
1099Welder, portable (Lincoln K1292 Equiv. or better)40Hr.$ - 0$ - 0
1100Track Hoe/Excavator (Case CX 50 B, 41 hp or better ) 24" w/Operator200Hr.$ - 0$ - 0
1101Track Hoe/Excavator (Case CX160 B, 120 hp or better ) 1/2 yd bk w/Operator200Hr.$ - 0$ - 0
Note: Item # 1102 - 1128: Bid should be based on Service Contract Labor Standards Act Wage Rates
1102Emergency Work Surcharge40Hr.$ - 0$ - 0
1103Carpenter200Hr.$ - 0$ - 0
1104General Maintenance Worker400Hr.$ - 0$ - 0
1105Electrician200Hr.$ - 0$ - 0
1106Equipment Operator80Hr.$ - 0$ - 0
1107Generator, Portable (4,000 watt)80Hr.$ - 0$ - 0
1108Laborer1,400Hr.$ - 0$ - 0
1109Painter200Hr.$ - 0$ - 0
1110Plumber200Hr.$ - 0$ - 0
1111Backhoe/Loader (Case 580 Equivalent) w/Operator300Hr.$ - 0$ - 0
1112Chain Saw W/Operator (3.2 cu/in Engine)200Hr.$ - 0$ - 0
1113Pesticide Applicator w/Certified Operator40Hr.$ - 0$ - 0
1114Dozer (D-6 Equivalent minimum) w/Operator80Hr.$ - 0$ - 0
1115Skid Loader (Bobcat 743 Equivalent, min) w/Operator300Hr.$ - 0$ - 0
1116Compressor (Joy 175 Equivalent)80Hr.$ - 0$ - 0
1117Tractor, (Ford 4000 Equiv. w/attach. Brush hog, mower unit, blade, bucket) w/Operator80Hr.$ - 0$ - 0
1118Trailer, 6 Ton (for hauling materials)80Hr.$ - 0$ - 0
1119Trencher (Hydra-Trencher 2400 Equivalent) w/Operator80Hr.$ - 0$ - 0
1120Truck, Dump (14 ton load cap., Bob-truck) w/Driver200Hr.$ - 0$ - 0
1121Plate tamper80Hr.$ - 0$ - 0
1122Pick up truck, 1/2 ton minimum w/Driver100Hr.$ - 0$ - 0
1123Truck, 1 ton (flat bed dump) w/Driver100Hr.$ - 0$ - 0
1124Truck, Bucket w/50'-80' boom w/Operator100Hr.$ - 0$ - 0
1125Truck, Knuckle boom w/Operator120Hr.$ - 0$ - 0
1126Excavator (track hoe), 10,000lb cap. min. w/Operator100Hr.$ - 0$ - 0
1127Chipper, wood 12" cap or better140Hr.$ - 0$ - 0
1128Truck, dump (27 ton load cap.) w/Operator200Hr.$ - 0$ - 0

SECTION 5 - Subtotal $ - 0

SECTION 6 - Bumpus Mills Water Treatment Plant
NTEUnit
Item #Quant.UnitPriceTotal
1129Operate Water Treatment Plant6Mo.$ - 0$ - 0
1130Opening Preparation of System1Ea.$ - 0$ - 0
1131Shutdown of Water System1Ea.$ - 0$ - 0
1132Additional Water testing (after line repair)20Ea.$ - 0$ - 0

SECTION 6 - Subtotal $ - 0

SECTION 7 - Beaches and Playgrounds
NTEUnit
Item #Quant.UnitPriceTotal
1133Beach Maintenance350Ea.$ - 0$ - 0
1134Playground Maintenance350Ea.$ - 0$ - 0
1135Water Testing180Ea.$ - 0$ - 0

SECTION 7 - Subtotal $ - 0

SECTION 8 - Boundary Line Marking and Repainting
NTEUnit
Item #Quant.UnitPriceTotal
1136Marking and Painting Boundary Line30Mi.$ - 0$ - 0

SECTION 8 - Subtotal $ - 0

SECTION 9- Janitorial Services for Kentucky Lock
NTEUnit
Item #Quant.UnitPriceTotal
1137Services for Kentucky Lock12Mo.$ - 0$ - 0

SECTION 9 - Subtotal $ - 0

SECTION 10- Janitorial Services for Barkley Power Plant
NTEUnit
Item #Quant.UnitPriceTotal
1138Powerplant Outside Areas12Mo.$ - 0$ - 0
1139Powerplant Operations Areas12Mo.$ - 0$ - 0
1140Powerplant Shop Areas12Mo.$ - 0$ - 0

SECTION 10 - Subtotal $ - 0

SECTION 11- Janitorial Services for Barkley Lock
NTEUnit
Item #Quant.UnitPriceTotal
1141Services for Barkley Lock12Mo.$ - 0$ - 0

SECTION 11 - Subtotal $ - 0

SECTION 12- Additional Janitorial Services
NTEUnit
Item #Quant.UnitPriceTotal
1142Enhanced Cleanings100Ea.$ - 0$ - 0
1143Deep Cleaning100Hrs$ - 0$ - 0

SECTION 12 - Subtotal $ - 0

SECTION 13- Pavement Striping and Sealing
NTEUnit
Item #Quant.UnitPriceTotal
1144Pavement Striping12,500Lin. Ft.$ - 0$ - 0
1145Pavement Sealing12,500Sq. Yd.$ - 0$ - 0

SECTION 13 - Subtotal $ - 0

OPTION YEAR 1 TOTAL $ - 0

OPTION YEAR 2

SECTION 2 - Grass Mowing
NTEUnit
Item #Quant.UnitPriceTotal
2001Canal Campground- Hill loop18Ea.$ - 0$ - 0
2002Canal Campground- Beach loop18Ea.$ - 0$ - 0
2003Canal Campground- Woods loop18Ea.$ - 0$ - 0
2004Canal Campground- Primitive loop18Ea.$ - 0$ - 0
2005Canal Campground- Fisherman's loop18Ea.$ - 0$ - 0
2006Canal Campground- Point loop18Ea.$ - 0$ - 0
2007Canal Campground- The View loop18Ea.$ - 0$ - 0
2008Canal Campground- Entrance area and Road18Ea.$ - 0$ - 0
2009Canal Overlook11Ea.$ - 0$ - 0
2010Dam Site Left Bank17Ea.$ - 0$ - 0
2011Left Bank Tailwater Embankment (Slope)11Ea.$ - 0$ - 0
2012Dam Site Right Bank17Ea.$ - 0$ - 0
2013Dam Site Right Bank warehouse area & roads11Ea.$ - 0$ - 0
2014Dam Embankment Left Bank11Ea.$ - 0$ - 0
2015Dam Embankment Right Bank -- Lower Slope11Ea.$ - 0$ - 0
2016Dam Embankment Right Bank -- Upper Slope11Ea.$ - 0$ - 0
2017Resource Office/Visitor Center18Ea.$ - 0$ - 0
2018Barkley Lock Area18Ea.$ - 0$ - 0
2019Eureka Campground area16Ea.$ - 0$ - 0
2020Eureka Picnic, Shelter and Launching area17Ea.$ - 0$ - 0
2021Boyds Landing11Ea.$ - 0$ - 0
2022Poplar Creek11Ea.$ - 0$ - 0
2023Kuttawa17Ea.$ - 0$ - 0
2024Eddyville -- Lower Slope11Ea.$ - 0$ - 0
2025Eddyville -- Upper Slope11Ea.$ - 0$ - 0
2026Coleman Bridge11Ea.$ - 0$ - 0
2027Drydens Creek11Ea.$ - 0$ - 0
2028Hurricane Creek17Ea.$ - 0$ - 0
2029Rockcastle17Ea.$ - 0$ - 0
2030Rivers End11Ea.$ - 0$ - 0
2031Little River11Ea.$ - 0$ - 0
2032Cadiz17Ea.$ - 0$ - 0
2033Devils Elbow11Ea.$ - 0$ - 0
2034Calhoun Hill11Ea.$ - 0$ - 0
2035Linton17Ea.$ - 0$ - 0
2036Tobacco Port11Ea.$ - 0$ - 0
2037Bumpus Mills Entrance, road and day use14Ea.$ - 0$ - 0
2038Bumpus Mills Campground area14Ea.$ - 0$ - 0
2039Saline Creek11Ea.$ - 0$ - 0
2040Blue Creek11Ea.$ - 0$ - 0
2041Dyers Creek17Ea.$ - 0$ - 0
2042Dover17Ea.$ - 0$ - 0
2043Hickman Creek & Dover radio tower11Ea.$ - 0$ - 0
2044Canal Overlook Slope11Ea.$ - 0$ - 0
2045Drain Field at Resource Office11Ea.$ - 0$ - 0
2046Road Shoulders & Fleet Storage Area11Ea.$ - 0$ - 0
2047Left Bank Berm11Ea.$ - 0$ - 0
2048Tree Removal 6"-12" ABH30Ea.$ - 0$ - 0
2049Tree Removal 12"-18" ABH25Ea.$ - 0$ - 0
2050Tree Removal 18"-24" ABH25Ea.$ - 0$ - 0
2051Tree Removal 24"-30" ABH25Ea.$ - 0$ - 0
2052Tree Removal 30" and greater ABH10Ea.$ - 0$ - 0
2053Perimeter Trimming5,000Ft.$ - 0$ - 0

SECTION 2 - Subtotal $ - 0

SECTION 3 - Cleaning Services - Recreational Facilities and Areas
NTEUnit
Item #Quant.UnitPriceTotal
2054Restrooms1,400Ea.$ - 0$ - 0
2055Washhouses1,400Ea.$ - 0$ - 0
2056Shelters2,500Ea.$ - 0$ - 0
2057Minishelters3,000Ea.$ - 0$ - 0
2058Campsites11,000Ea.$ - 0$ - 0
2059Litter - Canal Campground225Ea.$ - 0$ - 0
2060Litter - Campgrounds650Ea.$ - 0$ - 0
2061Litter - Day Use/High Use1,200Ea.$ - 0$ - 0
2062Litter - Day Use/Moderate Use1,200Ea.$ - 0$ - 0
2063Litter - Boat Ramps1,500Ea.$ - 0$ - 0
2064Dumpsters800Ea.$ - 0$ - 0
2065Additional Cleaning350Hr.$ - 0$ - 0
2066Pre-Season Cleaning Canal1Ea.$ - 0$ - 0
2067Pre-Season Cleaning Campgrounds3Ea.$ - 0$ - 0
2068Pre-Season Cleaning Day Use5Ea.$ - 0$ - 0

SECTION 3 - Subtotal $ - 0

SECTION 4 - Janitorial Services - Barkley Resource
NTEUnit
Item #Quant.UnitPriceTotal
2069Janitorial Services -- Resource Office12Mo.$ - 0$ - 0
2070Janitorial Services -- Shop12Mo.$ - 0$ - 0
2071Additional Janitorial Cleaning Hours60Hr.$ - 0$ - 0
2072Non-Routine Janitorial100Hr.$ - 0$ - 0

SECTION 4 - Subtotal $ - 0

SECTION 5- Facility Repair, Maintenance, and Other Non-Routine Work
NTEUnit
Item #Quant.UnitPriceTotal
Note: Item # 2073 - 2101: Bid should be based on Wage Rate Requirements (Construction) Act Wage Rates
2073Carpenter350Hr.$ - 0$ - 0
2074Concrete Finisher250Hr.$ - 0$ - 0
2075Electrician200Hr.$ - 0$ - 0
2076Heavy Equipment Operator/Truck Driver100Hr.$ - 0$ - 0
2077Mason (block/brick/rock layer)80Hr.$ - 0$ - 0
2078Concrete Saw40Hr.$ - 0$ - 0
2079Concrete Mixer, Portable40Hr.$ - 0$ - 0
2080Generator, Portable100Hr.$ - 0$ - 0
2081Laborer1,400Hr.$ - 0$ - 0
2082Painter300Hr.$ - 0$ - 0
2083Plumber200Hr.$ - 0$ - 0
2084Backhoe/Loader w/Operator (case 580 Equiv)300Hr.$ - 0$ - 0
2085Chainsaw W/Operator (3.2 cc /in eng or better)150Hr.$ - 0$ - 0
2086Dozer/Crawler D6 minimum w/Operator50Hr.$ - 0$ - 0
2087Skid Loader w/ Operator (Bobcat 743 equiv. or Better)300Hr.$ - 0$ - 0
2088Compressor (Joy 175 or better)50Hr.$ - 0$ - 0
2089Tractor (Ford 4000 Equiv or better w/attachments (Auger, blade, loader bucket, mower/brush hog unit) w/Operator80Hr.$ - 0$ - 0
2090Trailer, 6 ton (for material hauling)100Hr.$ - 0$ - 0
2091Trencher (Ditchwitch 3700 Equiv or better) w/Operator200Hr.$ - 0$ - 0
2092Truck, Dump 14 ton cap w/Driver100Hr.$ - 0$ - 0
2093Plate Tamper100Hr.$ - 0$ - 0
2094Pick-up 1/2 ton or better w/Driver100Hr.$ - 0$ - 0
2095Truck, 1 ton flat or dump bed w/Driver100Hr.$ - 0$ - 0
2096Truck, bucket w/50-80 ft boom and Driver200Hr.$ - 0$ - 0
2097Truck, tandum dump w/Driver100Hr.$ - 0$ - 0
2098Truck, tri-ax dump w/Driver100Hr.$ - 0$ - 0
2099Welder, portable (Lincoln K1292 Equiv. or better)40Hr.$ - 0$ - 0
2100Track Hoe/Excavator (Case CX 50 B, 41 hp or better ) 24" w/Operator200Hr.$ - 0$ - 0
2101Track Hoe/Excavator (Case CX160 B, 120 hp or better ) 1/2 yd bk w/Operator200Hr.$ - 0$ - 0
Note: Item # 2102 - 2128: Bid should be based on Service Contract Labor Standards Act Wage Rates
2102Emergency Work Surcharge40Hr.$ - 0$ - 0
2103Carpenter200Hr.$ - 0$ - 0
2104General Maintenance Worker400Hr.$ - 0$ - 0
2105Electrician200Hr.$ - 0$ - 0
2106Equipment Operator80Hr.$ - 0$ - 0
2107Generator, Portable (4,000 watt)80Hr.$ - 0$ - 0
2108Laborer1,400Hr.$ - 0$ - 0
2109Painter200Hr.$ - 0$ - 0
2110Plumber200Hr.$ - 0$ - 0
2111Backhoe/Loader (Case 580 Equivalent) w/Operator300Hr.$ - 0$ - 0
2112Chain Saw W/Operator (3.2 cu/in Engine)200Hr.$ - 0$ - 0
2113Pesticide Applicator w/Certified Operator40Hr.$ - 0$ - 0
2114Dozer (D-6 Equivalent minimum) w/Operator80Hr.$ - 0$ - 0
2115Skid Loader (Bobcat 743 Equivalent, min) w/Operator300Hr.$ - 0$ - 0
2116Compressor (Joy 175 Equivalent)80Hr.$ - 0$ - 0
2117Tractor, (Ford 4000 Equiv. w/attach. Brush hog, mower unit, blade, bucket) w/Operator80Hr.$ - 0$ - 0
2118Trailer, 6 Ton (for hauling materials)80Hr.$ - 0$ - 0
2119Trencher (Hydra-Trencher 2400 Equivalent) w/Operator80Hr.$ - 0$ - 0
2120Truck, Dump (14 ton load cap., Bob-truck) w/Driver200Hr.$ - 0$ - 0
2121Plate tamper80Hr.$ - 0$ - 0
2122Pick up truck, 1/2 ton minimum w/Driver100Hr.$ - 0$ - 0
2123Truck, 1 ton (flat bed dump) w/Driver100Hr.$ - 0$ - 0
2124Truck, Bucket w/50'-80' boom w/Operator100Hr.$ - 0$ - 0
2125Truck, Knuckle boom w/Operator120Hr.$ - 0$ - 0
2126Excavator (track hoe), 10,000lb cap. min. w/Operator100Hr.$ - 0$ - 0
2127Chipper, wood 12" cap or better140Hr.$ - 0$ - 0
2128Truck, dump (27 ton load cap.) w/Operator200Hr.$ - 0$ - 0

SECTION 5 - Subtotal $ - 0

SECTION 6 - Bumpus Mills Water Treatment Plant
NTEUnit
Item #Quant.UnitPriceTotal
2129Operate Water Treatment Plant6Mo.$ - 0$ - 0
2130Opening Preparation of System1Ea.$ - 0$ - 0
2131Shutdown of Water System1Ea.$ - 0$ - 0
2132Additional Water testing (after line repair)20Ea.$ - 0$ - 0

SECTION 6 - Subtotal $ - 0

SECTION 7 - Beaches and Playgrounds
NTEUnit
Item #Quant.UnitPriceTotal
2133Beach Maintenance350Ea.$ - 0$ - 0
2134Playground Maintenance350Ea.$ - 0$ - 0
2135Water Testing180Ea.$ - 0$ - 0

SECTION 7 - Subtotal $ - 0

SECTION 8 - Boundary Line Marking and Repainting
NTEUnit
Item #Quant.UnitPriceTotal
2136Marking and Painting Boundary Line30Mi.$ - 0$ - 0

SECTION 8 - Subtotal $ - 0

SECTION 9- Janitorial Services for Kentucky Lock
NTEUnit
Item #Quant.UnitPriceTotal
2137Services for Kentucky Lock12Mo.$ - 0$ - 0

SECTION 9 - Subtotal $ - 0

SECTION 10- Janitorial Services for Barkley Power Plant
NTEUnit
Item #Quant.UnitPriceTotal
2138Powerplant Outside Areas12Mo.$ - 0$ - 0
2139Powerplant Operations Areas12Mo.$ - 0$ - 0
2140Powerplant Shop Areas12Mo.$ - 0$ - 0

SECTION 10 - Subtotal $ - 0

SECTION 11- Janitorial Services for Barkley Lock
NTEUnit
Item #Quant.UnitPriceTotal
2141Services for Barkley Lock12Mo.$ - 0$ - 0

SECTION 11 - Subtotal $ - 0

SECTION 12- Additional Janitorial Services
NTEUnit
Item #Quant.UnitPriceTotal
2142Enhanced Cleanings100Ea.$ - 0$ - 0
2143Deep Cleaning100Hrs$ - 0$ - 0

SECTION 12 - Subtotal $ - 0

SECTION 13- Pavement Striping and Sealing
NTEUnit
Item #Quant.UnitPriceTotal
2144Pavement Striping12,500Lin. Ft.$ - 0$ - 0
2145Pavement Sealing12,500Sq. Yd.$ - 0$ - 0

SECTION 13 - Subtotal $ - 0

OPTION YEAR 2 TOTAL $ - 0

OPTION YEAR 3

SECTION 2 - Grass Mowing
NTEUnit
Item #Quant.UnitPriceTotal
3001Canal Campground- Hill loop18Ea.$ - 0$ - 0
3002Canal Campground- Beach loop18Ea.$ - 0$ - 0
3003Canal Campground- Woods loop18Ea.$ - 0$ - 0
3004Canal Campground- Primitive loop18Ea.$ - 0$ - 0
3005Canal Campground- Fisherman's loop18Ea.$ - 0$ - 0
3006Canal Campground- Point loop18Ea.$ - 0$ - 0
3007Canal Campground- The View loop18Ea.$ - 0$ - 0
3008Canal Campground- Entrance area and Road18Ea.$ - 0$ - 0
3009Canal Overlook11Ea.$ - 0$ - 0
3010Dam Site Left Bank17Ea.$ - 0$ - 0
3011Left Bank Tailwater Embankment (Slope)11Ea.$ - 0$ - 0
3012Dam Site Right Bank17Ea.$ - 0$ - 0
3013Dam Site Right Bank warehouse area & roads11Ea.$ - 0$ - 0
3014Dam Embankment Left Bank11Ea.$ - 0$ - 0
3015Dam Embankment Right Bank -- Lower Slope11Ea.$ - 0$ - 0
3016Dam Embankment Right Bank -- Upper Slope11Ea.$ - 0$ - 0
3017Resource Office/Visitor Center18Ea.$ - 0$ - 0
3018Barkley Lock Area18Ea.$ - 0$ - 0
3019Eureka Campground area16Ea.$ - 0$ - 0
3020Eureka Picnic, Shelter and Launching area17Ea.$ - 0$ - 0
3021Boyds Landing11Ea.$ - 0$ - 0
3022Poplar Creek11Ea.$ - 0$ - 0
3023Kuttawa17Ea.$ - 0$ - 0
3024Eddyville -- Lower Slope11Ea.$ - 0$ - 0
3025Eddyville -- Upper Slope11Ea.$ - 0$ - 0
3026Coleman Bridge11Ea.$ - 0$ - 0
3027Drydens Creek11Ea.$ - 0$ - 0
3028Hurricane Creek17Ea.$ - 0$ - 0
3029Rockcastle17Ea.$ - 0$ - 0
3030Rivers End11Ea.$ - 0$ - 0
3031Little River11Ea.$ - 0$ - 0
3032Cadiz17Ea.$ - 0$ - 0
3033Devils Elbow11Ea.$ - 0$ - 0
3034Calhoun Hill11Ea.$ - 0$ - 0
3035Linton17Ea.$ - 0$ - 0
3036Tobacco Port11Ea.$ - 0$ - 0
3037Bumpus Mills Entrance, road and day use14Ea.$ - 0$ - 0
3038Bumpus Mills Campground area14Ea.$ - 0$ - 0
3039Saline Creek11Ea.$ - 0$ - 0
3040Blue Creek11Ea.$ - 0$ - 0
3041Dyers Creek17Ea.$ - 0$ - 0
3042Dover17Ea.$ - 0$ - 0
3043Hickman Creek & Dover radio tower11Ea.$ - 0$ - 0
3044Canal Overlook Slope11Ea.$ - 0$ - 0
3045Drain Field at Resource Office11Ea.$ - 0$ - 0
3046Road Shoulders & Fleet Storage Area11Ea.$ - 0$ - 0
3047Left Bank Berm11Ea.$ - 0$ - 0
3048Tree Removal 6"-12" ABH30Ea.$ - 0$ - 0
3049Tree Removal 12"-18" ABH25Ea.$ - 0$ - 0
3050Tree Removal 18"-24" ABH25Ea.$ - 0$ - 0
3051Tree Removal 24"-30" ABH25Ea.$ - 0$ - 0
3052Tree Removal 30" and greater ABH10Ea.$ - 0$ - 0
3053Perimeter Trimming5,000Ft.$ - 0$ - 0

SECTION 2 - Subtotal $ - 0

SECTION 3 - Cleaning Services - Recreational Facilities and Areas
NTEUnit
Item #Quant.UnitPriceTotal
3054Restrooms1,400Ea.$ - 0$ - 0
3055Washhouses1,400Ea.$ - 0$ - 0
3056Shelters2,500Ea.$ - 0$ - 0
3057Minishelters3,000Ea.$ - 0$ - 0
3058Campsites11,000Ea.$ - 0$ - 0
3059Litter - Canal Campground225Ea.$ - 0$ - 0
3060Litter - Campgrounds650Ea.$ - 0$ - 0
3061Litter - Day Use/High Use1,200Ea.$ - 0$ - 0
3062Litter - Day Use/Moderate Use1,200Ea.$ - 0$ - 0
3063Litter - Boat Ramps1,500Ea.$ - 0$ - 0
3064Dumpsters800Ea.$ - 0$ - 0
3065Additional Cleaning350Hr.$ - 0$ - 0
3066Pre-Season Cleaning Canal1Ea.$ - 0$ - 0
3067Pre-Season Cleaning Campgrounds3Ea.$ - 0$ - 0
3068Pre-Season Cleaning Day Use5Ea.$ - 0$ - 0

SECTION 3 - Subtotal $ - 0

SECTION 4 - Janitorial Services - Barkley Resource
NTEUnit
Item #Quant.UnitPriceTotal
3069Janitorial Services -- Resource Office12Mo.$ - 0$ - 0
3070Janitorial Services -- Shop12Mo.$ - 0$ - 0
3071Additional Janitorial Cleaning Hours60Hr.$ - 0$ - 0
3072Non-Routine Janitorial100Hr.$ - 0$ - 0

SECTION 4 - Subtotal $ - 0

SECTION 5- Facility Repair, Maintenance, and Other Non-Routine Work
NTEUnit
Item #Quant.UnitPriceTotal
Note: Item # 3073 - 3101: Bid should be based on Wage Rate Requirements (Construction) Act Wage Rates
3073Carpenter350Hr.$ - 0$ - 0
3074Concrete Finisher250Hr.$ - 0$ - 0
3075Electrician200Hr.$ - 0$ - 0
3076Heavy Equipment Operator/Truck Driver100Hr.$ - 0$ - 0
3077Mason (block/brick/rock layer)80Hr.$ - 0$ - 0
3078Concrete Saw40Hr.$ - 0$ - 0
3079Concrete Mixer, Portable40Hr.$ - 0$ - 0
3080Generator, Portable100Hr.$ - 0$ - 0
3081Laborer1,400Hr.$ - 0$ - 0
3082Painter300Hr.$ - 0$ - 0
3083Plumber200Hr.$ - 0$ - 0
3084Backhoe/Loader w/Operator (case 580 Equiv)300Hr.$ - 0$ - 0
3085Chainsaw W/Operator (3.2 cc /in eng or better)150Hr.$ - 0$ - 0
3086Dozer/Crawler D6 minimum w/Operator50Hr.$ - 0$ - 0
3087Skid Loader w/ Operator (Bobcat 743 equiv. or Better)300Hr.$ - 0$ - 0
3088Compressor (Joy 175 or better)50Hr.$ - 0$ - 0
3089Tractor (Ford 4000 Equiv or better w/attachments (Auger, blade, loader bucket, mower/brush hog unit) w/Operator80Hr.$ - 0$ - 0
3090Trailer, 6 ton (for material hauling)100Hr.$ - 0$ - 0
3091Trencher (Ditchwitch 3700 Equiv or better) w/Operator200Hr.$ - 0$ - 0
3092Truck, Dump 14 ton cap w/Driver100Hr.$ - 0$ - 0
3093Plate Tamper100Hr.$ - 0$ - 0
3094Pick-up 1/2 ton or better w/Driver100Hr.$ - 0$ - 0
3095Truck, 1 ton flat or dump bed w/Driver100Hr.$ - 0$ - 0
3096Truck, bucket w/50-80 ft boom and Driver200Hr.$ - 0$ - 0
3097Truck, tandum dump w/Driver100Hr.$ - 0$ - 0
3098Truck, tri-ax dump w/Driver100Hr.$ - 0$ - 0
3099Welder, portable (Lincoln K1292 Equiv. or better)40Hr.$ - 0$ - 0
3100Track Hoe/Excavator (Case CX 50 B, 41 hp or better ) 24" w/Operator200Hr.$ - 0$ - 0
3101Track Hoe/Excavator (Case CX160 B, 120 hp or better ) 1/2 yd bk w/Operator200Hr.$ - 0$ - 0
Note: Item # 3102 - 3128: Bid should be based on Service Contract Labor Standards Act Wage Rates
3102Emergency Work Surcharge40Hr.$ - 0$ - 0
3103Carpenter200Hr.$ - 0$ - 0
3104General Maintenance Worker400Hr.$ - 0$ - 0
3105Electrician200Hr.$ - 0$ - 0
3106Equipment Operator80Hr.$ - 0$ - 0
3107Generator, Portable (4,000 watt)80Hr.$ - 0$ - 0
3108Laborer1,400Hr.$ - 0$ - 0
3109Painter200Hr.$ - 0$ - 0
3110Plumber200Hr.$ - 0$ - 0
3111Backhoe/Loader (Case 580 Equivalent) w/Operator300Hr.$ - 0$ - 0
3112Chain Saw W/Operator (3.2 cu/in Engine)200Hr.$ - 0$ - 0
3113Pesticide Applicator w/Certified Operator40Hr.$ - 0$ - 0
3114Dozer (D-6 Equivalent minimum) w/Operator80Hr.$ - 0$ - 0
3115Skid Loader (Bobcat 743 Equivalent, min) w/Operator300Hr.$ - 0$ - 0
3116Compressor (Joy 175 Equivalent)80Hr.$ - 0$ - 0
3117Tractor, (Ford 4000 Equiv. w/attach. Brush hog, mower unit, blade, bucket) w/Operator80Hr.$ - 0$ - 0
3118Trailer, 6 Ton (for hauling materials)80Hr.$ - 0$ - 0
3119Trencher (Hydra-Trencher 2400 Equivalent) w/Operator80Hr.$ - 0$ - 0
3120Truck, Dump (14 ton load cap., Bob-truck) w/Driver200Hr.$ - 0$ - 0
3121Plate tamper80Hr.$ - 0$ - 0
3122Pick up truck, 1/2 ton minimum w/Driver100Hr.$ - 0$ - 0
3123Truck, 1 ton (flat bed dump) w/Driver100Hr.$ - 0$ - 0
3124Truck, Bucket w/50'-80' boom w/Operator100Hr.$ - 0$ - 0
3125Truck, Knuckle boom w/Operator120Hr.$ - 0$ - 0
3126Excavator (track hoe), 10,000lb cap. min. w/Operator100Hr.$ - 0$ - 0
3127Chipper, wood 12" cap or better140Hr.$ - 0$ - 0
3128Truck, dump (27 ton load cap.) w/Operator200Hr.$ - 0$ - 0

SECTION 5 - Subtotal $ - 0

SECTION 6 - Bumpus Mills Water Treatment Plant
NTEUnit
Item #Quant.UnitPriceTotal
3129Operate Water Treatment Plant6Mo.$ - 0$ - 0
3130Opening Preparation of System1Ea.$ - 0$ - 0
3131Shutdown of Water System1Ea.$ - 0$ - 0
3132Additional Water testing (after line repair)20Ea.$ - 0$ - 0

SECTION 6 - Subtotal $ - 0

SECTION 7 - Beaches and Playgrounds
NTEUnit
Item #Quant.UnitPriceTotal
3133Beach Maintenance350Ea.$ - 0$ - 0
3134Playground Maintenance350Ea.$ - 0$ - 0
3135Water Testing180Ea.$ - 0$ - 0

SECTION 7 - Subtotal $ - 0

SECTION 8 - Boundary Line Marking and Repainting
NTEUnit
Item #Quant.UnitPriceTotal
3136Marking and Painting Boundary Line30Mi.$ - 0$ - 0

SECTION 8 - Subtotal $ - 0

SECTION 9- Janitorial Services for Kentucky Lock
NTEUnit
Item #Quant.UnitPriceTotal
3137Services for Kentucky Lock12Mo.$ - 0$ - 0

SECTION 9 - Subtotal $ - 0

SECTION 10- Janitorial Services for Barkley Power Plant
NTEUnit
Item #Quant.UnitPriceTotal
3138Powerplant Outside Areas12Mo.$ - 0$ - 0
3139Powerplant Operations Areas12Mo.$ - 0$ - 0
3140Powerplant Shop Areas12Mo.$ - 0$ - 0

SECTION 10 - Subtotal $ - 0

SECTION 11- Janitorial Services for Barkley Lock
NTEUnit
Item #Quant.UnitPriceTotal
3141Services for Barkley Lock12Mo.$ - 0$ - 0

SECTION 11 - Subtotal $ - 0

SECTION 12- Additional Janitorial Services
NTEUnit
Item #Quant.UnitPriceTotal
3142Enhanced Cleanings100Ea.$ - 0$ - 0
3143Deep Cleaning100Hrs$ - 0$ - 0

SECTION 12 - Subtotal $ - 0

SECTION 13- Pavement Striping and Sealing
NTEUnit
Item #Quant.UnitPriceTotal
3144Pavement Striping12,500Lin. Ft.$ - 0$ - 0
3145Pavement Sealing12,500Sq. Yd.$ - 0$ - 0

SECTION 13 - Subtotal $ - 0

OPTION YEAR 3 TOTAL $ - 0

OPTION YEAR 4

SECTION 2 - Grass Mowing
NTEUnit
Item #Quant.UnitPriceTotal
4001Canal Campground- Hill loop18Ea.$ - 0$ - 0
4002Canal Campground- Beach loop18Ea.$ - 0$ - 0
4003Canal Campground- Woods loop18Ea.$ - 0$ - 0
4004Canal Campground- Primitive loop18Ea.$ - 0$ - 0
4005Canal Campground- Fisherman's loop18Ea.$ - 0$ - 0
4006Canal Campground- Point loop18Ea.$ - 0$ - 0
4007Canal Campground- The View loop18Ea.$ - 0$ - 0
4008Canal Campground- Entrance area and Road18Ea.$ - 0$ - 0
4009Canal Overlook11Ea.$ - 0$ - 0
4010Dam Site Left Bank17Ea.$ - 0$ - 0
4011Left Bank Tailwater Embankment (Slope)11Ea.$ - 0$ - 0
4012Dam Site Right Bank17Ea.$ - 0$ - 0
4013Dam Site Right Bank warehouse area & roads11Ea.$ - 0$ - 0
4014Dam Embankment Left Bank11Ea.$ - 0$ - 0
4015Dam Embankment Right Bank -- Lower Slope11Ea.$ - 0$ - 0
4016Dam Embankment Right Bank -- Upper Slope11Ea.$ - 0$ - 0
4017Resource Office/Visitor Center18Ea.$ - 0$ - 0
4018Barkley Lock Area18Ea.$ - 0$ - 0
4019Eureka Campground area16Ea.$ - 0$ - 0
4020Eureka Picnic, Shelter and Launching area17Ea.$ - 0$ - 0
4021Boyds Landing11Ea.$ - 0$ - 0
4022Poplar Creek11Ea.$ - 0$ - 0
4023Kuttawa17Ea.$ - 0$ - 0
4024Eddyville -- Lower Slope11Ea.$ - 0$ - 0
4025Eddyville -- Upper Slope11Ea.$ - 0$ - 0
4026Coleman Bridge11Ea.$ - 0$ - 0
4027Drydens Creek11Ea.$ - 0$ - 0
4028Hurricane Creek17Ea.$ - 0$ - 0
4029Rockcastle17Ea.$ - 0$ - 0
4030Rivers End11Ea.$ - 0$ - 0
4031Little River11Ea.$ - 0$ - 0
4032Cadiz17Ea.$ - 0$ - 0
4033Devils Elbow11Ea.$ - 0$ - 0
4034Calhoun Hill11Ea.$ - 0$ - 0
4035Linton17Ea.$ - 0$ - 0
4036Tobacco Port11Ea.$ - 0$ - 0
4037Bumpus Mills Entrance, road and day use14Ea.$ - 0$ - 0
4038Bumpus Mills Campground area14Ea.$ - 0$ - 0
4039Saline Creek11Ea.$ - 0$ - 0
4040Blue Creek11Ea.$ - 0$ - 0
4041Dyers Creek17Ea.$ - 0$ - 0
4042Dover17Ea.$ - 0$ - 0
4043Hickman Creek & Dover radio tower11Ea.$ - 0$ - 0
4044Canal Overlook Slope11Ea.$ - 0$ - 0
4045Drain Field at Resource Office11Ea.$ - 0$ - 0
4046Road Shoulders & Fleet Storage Area11Ea.$ - 0$ - 0
4047Left Bank Berm11Ea.$ - 0$ - 0
4048Tree Removal 6"-12" ABH30Ea.$ - 0$ - 0
4049Tree Removal 12"-18" ABH25Ea.$ - 0$ - 0
4050Tree Removal 18"-24" ABH25Ea.$ - 0$ - 0
4051Tree Removal 24"-30" ABH25Ea.$ - 0$ - 0
4052Tree Removal 30" and greater ABH10Ea.$ - 0$ - 0
4053Perimeter Trimming5,000Ft.$ - 0$ - 0

SECTION 2 - Subtotal $ - 0

SECTION 3 - Cleaning Services - Recreational Facilities and Areas
NTEUnit
Item #Quant.UnitPriceTotal
4054Restrooms1,400Ea.$ - 0$ - 0
4055Washhouses1,400Ea.$ - 0$ - 0
4056Shelters2,500Ea.$ - 0$ - 0
4057Minishelters3,000Ea.$ - 0$ - 0
4058Campsites11,000Ea.$ - 0$ - 0
4059Litter - Canal Campground225Ea.$ - 0$ - 0
4060Litter - Campgrounds650Ea.$ - 0$ - 0
4061Litter - Day Use/High Use1,200Ea.$ - 0$ - 0
4062Litter - Day Use/Moderate Use1,200Ea.$ - 0$ - 0
4063Litter - Boat Ramps1,500Ea.$ - 0$ - 0
4064Dumpsters800Ea.$ - 0$ - 0
4065Additional Cleaning350Hr.$ - 0$ - 0
4066Pre-Season Cleaning Canal1Ea.$ - 0$ - 0
4067Pre-Season Cleaning Campgrounds3Ea.$ - 0$ - 0
4068Pre-Season Cleaning Day Use5Ea.$ - 0$ - 0

SECTION 3 - Subtotal $ - 0

SECTION 4 - Janitorial Services - Barkley Resource
NTEUnit
Item #Quant.UnitPriceTotal
4069Janitorial Services -- Resource Office12Mo.$ - 0$ - 0
4070Janitorial Services -- Shop12Mo.$ - 0$ - 0
4071Additional Janitorial Cleaning Hours60Hr.$ - 0$ - 0
4072Non-Routine Janitorial100Hr.$ - 0$ - 0

SECTION 4 - Subtotal $ - 0

SECTION 5- Facility Repair, Maintenance, and Other Non-Routine Work
NTEUnit
Item #Quant.UnitPriceTotal
Note: Item # 4073 - 4101: Bid should be based on Wage Rate Requirements (Construction) Act Wage Rates
4073Carpenter350Hr.$ - 0$ - 0
4074Concrete Finisher250Hr.$ - 0$ - 0
4075Electrician200Hr.$ - 0$ - 0
4076Heavy Equipment Operator/Truck Driver100Hr.$ - 0$ - 0
4077Mason (block/brick/rock layer)80Hr.$ - 0$ - 0
4078Concrete Saw40Hr.$ - 0$ - 0
4079Concrete Mixer, Portable40Hr.$ - 0$ - 0
4080Generator, Portable100Hr.$ - 0$ - 0
4081Laborer1,400Hr.$ - 0$ - 0
4082Painter300Hr.$ - 0$ - 0
4083Plumber200Hr.$ - 0$ - 0
4084Backhoe/Loader w/Operator (case 580 Equiv)300Hr.$ - 0$ - 0
4085Chainsaw W/Operator (3.2 cc /in eng or better)150Hr.$ - 0$ - 0
4086Dozer/Crawler D6 minimum w/Operator50Hr.$ - 0$ - 0
4087Skid Loader w/ Operator (Bobcat 743 equiv. or Better)300Hr.$ - 0$ - 0
4088Compressor (Joy 175 or better)50Hr.$ - 0$ - 0
4089Tractor (Ford 4000 Equiv or better w/attachments (Auger, blade, loader bucket, mower/brush hog unit) w/Operator80Hr.$ - 0$ - 0
4090Trailer, 6 ton (for material hauling)100Hr.$ - 0$ - 0
4091Trencher (Ditchwitch 3700 Equiv or better) w/Operator200Hr.$ - 0$ - 0
4092Truck, Dump 14 ton cap w/Driver100Hr.$ - 0$ - 0
4093Plate Tamper100Hr.$ - 0$ - 0
4094Pick-up 1/2 ton or better w/Driver100Hr.$ - 0$ - 0
4095Truck, 1 ton flat or dump bed w/Driver100Hr.$ - 0$ - 0
4096Truck, bucket w/50-80 ft boom and Driver200Hr.$ - 0$ - 0
4097Truck, tandum dump w/Driver100Hr.$ - 0$ - 0
4098Truck, tri-ax dump w/Driver100Hr.$ - 0$ - 0
4099Welder, portable (Lincoln K1292 Equiv. or better)40Hr.$ - 0$ - 0
4100Track Hoe/Excavator (Case CX 50 B, 41 hp or better ) 24" w/Operator200Hr.$ - 0$ - 0
4101Track Hoe/Excavator (Case CX160 B, 120 hp or better ) 1/2 yd bk w/Operator200Hr.$ - 0$ - 0
Note: Item # 4102 - 4128: Bid should be based on Service Contract Labor Standards Act Wage Rates
4102Emergency Work Surcharge40Hr.$ - 0$ - 0
4103Carpenter200Hr.$ - 0$ - 0
4104General Maintenance Worker400Hr.$ - 0$ - 0
4105Electrician200Hr.$ - 0$ - 0
4106Equipment Operator80Hr.$ - 0$ - 0
4107Generator, Portable (4,000 watt)80Hr.$ - 0$ - 0
4108Laborer1,400Hr.$ - 0$ - 0
4109Painter200Hr.$ - 0$ - 0
4110Plumber200Hr.$ - 0$ - 0
4111Backhoe/Loader (Case 580 Equivalent) w/Operator300Hr.$ - 0$ - 0
4112Chain Saw W/Operator (3.2 cu/in Engine)200Hr.$ - 0$ - 0
4113Pesticide Applicator w/Certified Operator40Hr.$ - 0$ - 0
4114Dozer (D-6 Equivalent minimum) w/Operator80Hr.$ - 0$ - 0
4115Skid Loader (Bobcat 743 Equivalent, min) w/Operator300Hr.$ - 0$ - 0
4116Compressor (Joy 175 Equivalent)80Hr.$ - 0$ - 0
4117Tractor, (Ford 4000 Equiv. w/attach. Brush hog, mower unit, blade, bucket) w/Operator80Hr.$ - 0$ - 0
4118Trailer, 6 Ton (for hauling materials)80Hr.$ - 0$ - 0
4119Trencher (Hydra-Trencher 2400 Equivalent) w/Operator80Hr.$ - 0$ - 0
4120Truck, Dump (14 ton load cap., Bob-truck) w/Driver200Hr.$ - 0$ - 0
4121Plate tamper80Hr.$ - 0$ - 0
4122Pick up truck, 1/2 ton minimum w/Driver100Hr.$ - 0$ - 0
4123Truck, 1 ton (flat bed dump) w/Driver100Hr.$ - 0$ - 0
4124Truck, Bucket w/50'-80' boom w/Operator100Hr.$ - 0$ - 0
4125Truck, Knuckle boom w/Operator120Hr.$ - 0$ - 0
4126Excavator (track hoe), 10,000lb cap. min. w/Operator100Hr.$ - 0$ - 0
4127Chipper, wood 12" cap or better140Hr.$ - 0$ - 0
4128Truck, dump (27 ton load cap.) w/Operator200Hr.$ - 0$ - 0

SECTION 5 - Subtotal $ - 0

SECTION 6 - Bumpus Mills Water Treatment Plant
NTEUnit
Item #Quant.UnitPriceTotal
4129Operate Water Treatment Plant6Mo.$ - 0$ - 0
4130Opening Preparation of System1Ea.$ - 0$ - 0
4131Shutdown of Water System1Ea.$ - 0$ - 0
4132Additional Water testing (after line repair)20Ea.$ - 0$ - 0

SECTION 6 - Subtotal $ - 0

SECTION 7 - Beaches and Playgrounds
NTEUnit
Item #Quant.UnitPriceTotal
4133Beach Maintenance350Ea.$ - 0$ - 0
4134Playground Maintenance350Ea.$ - 0$ - 0
4135Water Testing180Ea.$ - 0$ - 0

SECTION 7 - Subtotal $ - 0

SECTION 8 - Boundary Line Marking and Repainting
NTEUnit
Item #Quant.UnitPriceTotal
4136Marking and Painting Boundary Line30Mi.$ - 0$ - 0

SECTION 8 - Subtotal $ - 0

SECTION 9- Janitorial Services for Kentucky Lock
NTEUnit
Item #Quant.UnitPriceTotal
4137Services for Kentucky Lock12Mo.$ - 0$ - 0

SECTION 9 - Subtotal $ - 0

SECTION 10- Janitorial Services for Barkley Power Plant
NTEUnit
Item #Quant.UnitPriceTotal
4138Powerplant Outside Areas12Mo.$ - 0$ - 0
4139Powerplant Operations Areas12Mo.$ - 0$ - 0
4140Powerplant Shop Areas12Mo.$ - 0$ - 0

SECTION 10 - Subtotal $ - 0

SECTION 11- Janitorial Services for Barkley Lock
NTEUnit
Item #Quant.UnitPriceTotal
4141Services for Barkley Lock12Mo.$ - 0$ - 0

SECTION 11 - Subtotal $ - 0

SECTION 12- Additional Janitorial Services
NTEUnit
Item #Quant.UnitPriceTotal
4142Enhanced Cleanings100Ea.$ - 0$ - 0
4143Deep Cleaning100Hrs$ - 0$ - 0

SECTION 12 - Subtotal $ - 0

SECTION 13- Pavement Striping and Sealing
NTEUnit
Item #Quant.UnitPriceTotal
4144Pavement Striping12,500Lin. Ft.$ - 0$ - 0
4145Pavement Sealing12,500Sq. Yd.$ - 0$ - 0

SECTION 13 - Subtotal $ - 0

OPTION YEAR 4 TOTAL $ - 0

Totals by Contract Year
Base Year$ - 0
Option Year #1$ - 0
Option Year #2$ - 0
Option Year #3$ - 0
Option Year #4$ - 0

Grand Total (Base + 4 option years) $ - 0