Price_Proposal.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Design-Build Services for a Hydrogen Fueling Station
Solicitation number
2026-RFP-0123
Issued by
Los Angeles County, California

About this file

This is a Price Proposal form for the City of Pasadena's design-build-operate-maintain (DBOM) services for a hydrogen fueling station project. The proposal template requires proposers to provide pricing across multiple components including bonding and insurance, general requirements, architecture/engineering and permitting, civil work and site preparation, mechanical and electrical work, hydrogen safety planning, hydrogen fueling system equipment, spare parts, warranty, three-year operations and maintenance services, commissioning and acceptance testing, training, and overhead and profit. The base bid price proposal includes 14 line items with a total base proposal price field, while an alternates section provides pricing options for a liquid hydrogen offload pump, a third liquid hydrogen product pump, and a boiler off-gas recovery system. The mandatory pre-proposal meeting is scheduled for April 23, 2026, at 10:00 AM, with questions due by May 22, 2026, at 2:00 PM and proposals due June 8, 2026, at 2:00 PM. The design phase will commence in July 2026 for six months, construction will begin in February 2027 and last approximately 20 months, with substantial completion required by September 2028 and full commissioning by December 2028.

The fuel pricing section requires proposers to provide maximum not-to-exceed pricing for liquid hydrogen commodity delivery over three one-year terms beginning with station commissioning, with pricing specified per kilogram including taxes, estimated annual dispensing volumes of 200,000 kilograms, delivery charges per load at assumed 4,000-kilogram deliveries, and any additional charges. All permits, inspections, plan checks, and governmental approvals must be obtained, paid for, and issued in the name of the Design-Builder and included in the total proposal price. The estimated cost of the design-build scope of work is $16,000,000, with project funding provided in part by the California Energy Commission's Clean Transportation Program, EnergIIZe, and the California State Transportation Agency's Transit and Intercity Rail Capital Program (TIRCP). Proposals are limited to 75 total pages for technical components and must be submitted via the City's eProcurement Portal with six bound copies plus one unbound original delivered to the Department of Public Works within three business days of electronic submission.

View the file

Other files

File Type Posted
Design-Build_Services_for_a_Hydrogen_Fueling_Station_(Addendum_#11_Revision).pdf PDF
Hydrogen_Fueling_Agreement_General_Conditions_Exhibits_and_Appendices.pdf PDF
Design-Build_Services_for_a_Hydrogen_Fueling_Station_(Addendum_#9_Revision).pdf PDF
Design-Build_Services_for_a_Hydrogen_Fueling_Station_(Addendum_#8_Revision).pdf PDF
AA_Price_Proposal.xlsx XLSX spreadsheet
Design-Build_Services_for_a_Hydrogen_Fueling_Station_(Addendum_#3_Revision).pdf PDF
Insurance_Requirements.pdf PDF
Design-Build_Services_for_a_Hydrogen_Fueling_Station.pdf PDF
[I]_-_Insurance_Requirements.pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
Civil_Litigation_History_Certification_ver02.pdf PDF
Indemnity_Agreement_Form.pdf PDF
Price_Proposal.xlsx XLSX spreadsheet
Subcontractor_Listing.pdf PDF
Public_Contract_Code_Disclosure.pdf PDF
DB_Qualificiation_Statement_FINAL.docx DOCX document
Proof_of_Authority.pdf PDF
Declaration_of_Elibility_to_Contract_(not_debarred).pdf PDF
AFFIDAVIT_OF_JOINT_VENTURE.pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
Health_and_Safety_Plan.pdf PDF
City's_Standard_Form_(Traditional)_Design-Build_Agreement.pdf PDF
Soil_Management_Plan.pdf PDF
Geotechnical_Report.pdf PDF
Conceptual_Drawings.pdf PDF
Project_Manual.pdf PDF
Emergency_FEMA_TC.pdf PDF
AR_7_-_Alternative_Delivery_Method_Approval.pdf PDF
Unique_Entity_ID_(SAM).pdf PDF
Exclusive_Negotiation_Agreement__TEMPLATE.pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
Federal_Required_Certification_(4).pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Bid

PRICE PROPOSAL
Proposer Name:
Note: All permits, inspections, plan checks, and Governmental Approvals shall be obtained, paid for and issued in the name of the Design-Builder and included in the Total Proposal Price. Fuel Supply Pricing to be input on other tabs.
Date:
Project Name:
Project Number:
Line ItemDetailed Items of WorkScheduled PriceNotes
1Bonding & Insurance$ - 0
2General Requirements and Conditions$ - 0
3Architecture/Engineering/Design Drawings and Permitting$ - 0
4Civil Work and Site Preparation$ - 0
5Mechanical and Electrical Work$ - 0
6Hydrogen Safety Plan$ - 0
7Hydrogen Fueling System Equipment (please Itemize)$ - 0
8Spare Parts$ - 0
9Warranty$ - 0
10Operations & Maintenance (3 year term)$ - 0
11Commissioning and Acceptance Testing$ - 0
12Training$ - 0
13Overhead & Profit$ - 0
14Total Base Proposal Price$ - 0

Alternates

PRICE PROPOSAL
Proposer Name:
Note: Refer to Project Manual for additive alternate descriptions.
Date:
Project Name:
Project Number:
Item#Detailed Items of WorkScheduled PriceNotes
ALH2 Offload Pump$ - 0
BThird LH2 Product Pump$ - 0
CBOG Recovery System$ - 0
Total of Additive Alternates Price$ - 0

Alternates - Fuel Price

PRICE PROPOSAL
Proposer Name:
Note: Fuel pricing to be maximum not to exceed. Liquid hydrogen commodity for three one-year terms.
Date:
Project Name:
Project Number:
Line ItemFUEL CHARGES
Maximum Not to Exceed Price3 ONE-YEAR TERMS

BEGINS WITH COMMISSIONING OF STATION

DFuel Price (3 One-year terms)YEAR ONEYEAR TWOYEAR THREE
Price/Kg (including taxes)$ - 0$ - 0$ - 0
Kgs dispensed in one year200,000200,000200,000
Total - Fuel Charge (including taxes)$ - 0$ - 0$ - 0
Delivery Charges
Cost per Delivery$ - 0$ - 0$ - 0
Estimated Annual Deliveries (assume 4,000 kg at a time)000
Total - Delivery Charges$ - 0$ - 0$ - 0
Other Charges (Must define and list other charges)$ - 0$ - 0$ - 0
Additive Alternate: TOTAL Annual Fuel Charges$ - 0$ - 0$ - 0