AA_Price_Proposal.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Design-Build Services for a Hydrogen Fueling Station
Solicitation number
2026-RFP-0123
Issued by
Los Angeles County, California

About this file

This is a price proposal template for design-build-operate-maintain (DBOM) services for a hydrogen fueling station project solicited by the City of Pasadena, California. The proposal encompasses design, construction, operations, and maintenance of a stand-alone hydrogen fueling facility at 159 South Kinneloa Avenue that will support the city's planned fleet of fuel cell electric buses utilizing delivered liquid hydrogen as the primary storage medium. The facility will include an 18,000-gallon gross capacity LH2 storage tank, two LH2 product pumps, two gaseous hydrogen dispensers rated for H35 fills, vaporizers, chillers, site improvements, masonry fencing, fueling canopy, utility building, backup generator, bus-parking canopy, and surveillance systems. The mandatory pre-proposal meeting is scheduled for April 23, 2026, at 10:00 AM, with questions due by May 22, 2026, at 2:00 PM, and proposals due June 8, 2026, at 2:00 PM. The estimated design phase will commence in July 2026 for six months, with construction beginning in February 2027 and lasting approximately 20 months, and substantial completion required by September 2028 with full commissioning by December 2028.

The price proposal template itemizes 14 base bid line items including bonding and insurance, general requirements, architecture and engineering, civil work, mechanical and electrical work, hydrogen safety plan, fueling system equipment, spare parts, warranty, three-year operations and maintenance, commissioning and testing, training, and overhead and profit. Four additive alternates are included addressing LH2 offload pump, third LH2 product pump, BOG recovery system, and dual hose dispensers. A separate fuel pricing section establishes maximum not-to-exceed charges for liquid hydrogen commodity over three one-year terms beginning with station commissioning, with pricing specified per kilogram for 200,000 kilograms annual dispensing and delivery charges based on estimated annual deliveries of 4,000 kilograms at a time. The project is estimated at $16,000,000 and is funded in part by the California Energy Commission's Clean Transportation Program, EnergIIZe, and the California State Transportation Agency's Transit and Intercity Rail Capital Program (TIRCP), which impose federal compliance requirements under 2 CFR 200.

View the file

Other files

File Type Posted
Design-Build_Services_for_a_Hydrogen_Fueling_Station_(Addendum_#11_Revision).pdf PDF
Hydrogen_Fueling_Agreement_General_Conditions_Exhibits_and_Appendices.pdf PDF
Design-Build_Services_for_a_Hydrogen_Fueling_Station_(Addendum_#9_Revision).pdf PDF
Design-Build_Services_for_a_Hydrogen_Fueling_Station_(Addendum_#8_Revision).pdf PDF
Design-Build_Services_for_a_Hydrogen_Fueling_Station_(Addendum_#3_Revision).pdf PDF
Insurance_Requirements.pdf PDF
Design-Build_Services_for_a_Hydrogen_Fueling_Station.pdf PDF
[I]_-_Insurance_Requirements.pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
Civil_Litigation_History_Certification_ver02.pdf PDF
Indemnity_Agreement_Form.pdf PDF
Price_Proposal.xlsx XLSX spreadsheet
Subcontractor_Listing.pdf PDF
Public_Contract_Code_Disclosure.pdf PDF
DB_Qualificiation_Statement_FINAL.docx DOCX document
Proof_of_Authority.pdf PDF
Declaration_of_Elibility_to_Contract_(not_debarred).pdf PDF
AFFIDAVIT_OF_JOINT_VENTURE.pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
Health_and_Safety_Plan.pdf PDF
City's_Standard_Form_(Traditional)_Design-Build_Agreement.pdf PDF
Soil_Management_Plan.pdf PDF
Geotechnical_Report.pdf PDF
Conceptual_Drawings.pdf PDF
Project_Manual.pdf PDF
Emergency_FEMA_TC.pdf PDF
AR_7_-_Alternative_Delivery_Method_Approval.pdf PDF
Unique_Entity_ID_(SAM).pdf PDF
Exclusive_Negotiation_Agreement__TEMPLATE.pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
Federal_Required_Certification_(4).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Bid

PRICE PROPOSAL
Proposer Name:
Note: All permits, inspections, plan checks, and Governmental Approvals shall be obtained, paid for and issued in the name of the Design-Builder and included in the Total Proposal Price. Fuel Supply Pricing to be input on other tabs.
Date:
Project Name:
Project Number:
Line ItemDetailed Items of WorkScheduled PriceNotes
1Bonding & Insurance$ - 0
2General Requirements and Conditions$ - 0
3Architecture/Engineering/Design Drawings and Permitting$ - 0
4Civil Work and Site Preparation$ - 0
5Mechanical and Electrical Work$ - 0
6Hydrogen Safety Plan$ - 0
7Hydrogen Fueling System Equipment (please Itemize)$ - 0
8Spare Parts$ - 0
9Warranty$ - 0
10Operations & Maintenance (3 year term)$ - 0
11Commissioning and Acceptance Testing$ - 0
12Training$ - 0
13Overhead & Profit$ - 0
14Total Base Proposal Price$ - 0

Alternates

PRICE PROPOSAL
Proposer Name:
Note: Refer to Project Manual for additive alternate descriptions. Refer to question number 12 related to Alternate E.
Date:
Project Name:
Project Number:
Item#Detailed Items of WorkScheduled PriceNotes
ALH2 Offload Pump$ - 0
BThird LH2 Product Pump$ - 0
CBOG Recovery System$ - 0
EAdditional cost of two (2) each Dual Hose & Dual Meter H35 Dispensers in lieu of single hose Dispensers$ - 0
Total of Additive Alternates Price$ - 0

Alternates - Fuel Price

PRICE PROPOSAL
Proposer Name:
Note: Fuel pricing to be maximum not to exceed. Liquid hydrogen commodity for three one-year terms.
Date:
Project Name:
Project Number:
Line ItemFUEL CHARGES
Maximum Not to Exceed Price3 ONE-YEAR TERMS

BEGINS WITH COMMISSIONING OF STATION

DFuel Price (3 One-year terms)YEAR ONEYEAR TWOYEAR THREE
Price/Kg (including taxes)$ - 0$ - 0$ - 0
Kgs dispensed in one year200,000200,000200,000
Total - Fuel Charge (including taxes)$ - 0$ - 0$ - 0
Delivery Charges
Cost per Delivery$ - 0$ - 0$ - 0
Estimated Annual Deliveries (assume 4,000 kg at a time)000
Total - Delivery Charges$ - 0$ - 0$ - 0
Other Charges (Must define and list other charges)$ - 0$ - 0$ - 0
Additive Alternate: TOTAL Annual Fuel Charges$ - 0$ - 0$ - 0

File details come from the government source that posted it. Updated .