Price_List.pdf

PDF 149 KB Posted

Attached to
CHINLE LAND TRANSFER Federal contract opportunity
Solicitation number
140A0924Q0076
Issued by
Department of the Interior Bureau of Indian Affairs Navajo Region

About this file

The provided document is a Price Schedule for the CHINLE LAND TRANSFER contract opportunity, Solicitation Number 140A0924Q0076. The contract is being issued by the Department of the Interior Bureau of Indian Affairs Navajo Region for an ASTM Phase III environmental remediation project in Chinle, Arizona.

The Price Schedule outlines the tasks and associated pricing for the contract, including Prework Submittal, Mobilization/Site Setup, Remediation of three parcels (B12, G1, and P1), Abatement of Hazardous Constituents, and Final Reporting. Pricing details are provided for labor, equipment, materials, disposal, and other direct costs. The total price, including applicable state and tribal taxes, is also included. No performance period or award date is specified in the provided documentation.

View the file

Other files for this federal contract opportunity

Other files attached to CHINLE LAND TRANSFER, newest first.
File Type Posted
Sol_140A0924Q0076_Amd_0001.pdf PDF
SF1449_140A0924Q0076.pdf PDF
BuyIndianRepresentation_081922.pdf PDF
CombinedSynopsis_PhaseIII_ASTM_Chinle_082724.pdf PDF
Sol_140A0924Q0076.pdf PDF
20220720_CHINLE_PARCEL_B.pdf PDF
Wage_Rates_Apache_County.pdf PDF
BIA_Chinle_Land_Transfers_Phase_II_ESA_11-2022.pdf PDF
SOW_Chinle_Land_Transfer_082724.pdf PDF
BIA_Chinle_Land_Transfers_ASTM_Phase_I_ESA_11-2022.pdf PDF
Chinle_Map.pdf PDF
20220720_CHINLE_PARCEL_G_P.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK 1

Task 2

Task 3

Pre‐work Submittal (includes draft and final)

1 Health and Safety Plan

2 Work Plan/Work Schedule

5 Cultural and Biological Compliance Forms (NN)

Moblilization/Site Setup

1 Moblization

2 Equipment Owned/Rental (Heavy Equipment)

3 Materials/Supplies

4 Vehicles (2 vehicles*45 days*$_____/day)

5 Lodging (5 people*45 days*$____/day)

6 Per Diem (5 people*45 days*$____5/day)

7 Manpower (8 hr/day*5 People*45 days*$____/day)

Remediation

1 Parcel B‐1‐2: Gather, Remove and Dispose of miscellaneous debris.

Hauling Scrap Metal for Recycling (1 load*$___/load)

Hauling Solid Waste (1 load*$___load)

Parcel G‐1: Gather, Remove and Dispose of debris. Demolish well house and concrete base. Reseed.

Hauling Scrap Metal for Recycling (1 load*$_____/load)

Hauling Solid Waste (4 loads*$____/load)

Parcel P‐1: Gather, Remove and Dispose of debris. Demolish well house and concrete base. Reseed.

Hauling Scrap Metal for Recycling (1 load*$____/load)

Hauling Solid Waste (4 loads*$____/load) $

Task 4 Abatement of Hazardous Constituents

5 Parcel G‐1: Gather, Remove and Dispose of ACM material and LBP.

Hauling Asbestos Waste (1 Load*$___/load) Hauling

Concrete for Recycling (4 loads*$____/load) $

6 Parcel P‐1: Gather, Remove and Dispose of ACM material and LBP.

Hauling Asbestos Waste (1 Load*$____/load)

Hauling Concrete for Recycling (4 loads*$____/load) $

Task 4 Reports

1 Draft of Final Report $

2 PE Certification $

3 Final Report $

SubTotal $

AZ State Tax $

Navajo Nation Tax $

Grand Total $

PRICE SCHEDULE_CHINLE LAND TRANSFER

PARCELS B‐1‐2, G‐1, and P-1

File details come from the government source that posted it. Updated .