Price_List.pdf

PDF 149 KB Posted

Attached to
CHINLE LAND TRANSFER
Solicitation number
140A0924Q0076
Issued by

About this file

The provided document is a Price Schedule for the CHINLE LAND TRANSFER contract opportunity, Solicitation Number 140A0924Q0076. The contract is being issued by the Department of the Interior Bureau of Indian Affairs Navajo Region for an ASTM Phase III environmental remediation project in Chinle, Arizona.

The Price Schedule outlines the tasks and associated pricing for the contract, including Prework Submittal, Mobilization/Site Setup, Remediation of three parcels (B12, G1, and P1), Abatement of Hazardous Constituents, and Final Reporting. Pricing details are provided for labor, equipment, materials, disposal, and other direct costs. The total price, including applicable state and tribal taxes, is also included. No performance period or award date is specified in the provided documentation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK 1

Task 2

Task 3

Pre‐work Submittal (includes draft and final)

1 Health and Safety Plan

2 Work Plan/Work Schedule

5 Cultural and Biological Compliance Forms (NN)

Moblilization/Site Setup

1 Moblization

2 Equipment Owned/Rental (Heavy Equipment)

3 Materials/Supplies

4 Vehicles (2 vehicles*45 days*$_____/day)

5 Lodging (5 people*45 days*$____/day)

6 Per Diem (5 people*45 days*$____5/day)

7 Manpower (8 hr/day*5 People*45 days*$____/day)

Remediation

1 Parcel B‐1‐2: Gather, Remove and Dispose of miscellaneous debris.

Hauling Scrap Metal for Recycling (1 load*$___/load)

Hauling Solid Waste (1 load*$___load)

Parcel G‐1: Gather, Remove and Dispose of debris. Demolish well house and concrete base. Reseed.

Hauling Scrap Metal for Recycling (1 load*$_____/load)

Hauling Solid Waste (4 loads*$____/load)

Parcel P‐1: Gather, Remove and Dispose of debris. Demolish well house and concrete base. Reseed.

Hauling Scrap Metal for Recycling (1 load*$____/load)

Hauling Solid Waste (4 loads*$____/load) $

Task 4 Abatement of Hazardous Constituents

5 Parcel G‐1: Gather, Remove and Dispose of ACM material and LBP.

Hauling Asbestos Waste (1 Load*$___/load) Hauling

Concrete for Recycling (4 loads*$____/load) $

6 Parcel P‐1: Gather, Remove and Dispose of ACM material and LBP.

Hauling Asbestos Waste (1 Load*$____/load)

Hauling Concrete for Recycling (4 loads*$____/load) $

Task 4 Reports

1 Draft of Final Report $

2 PE Certification $

3 Final Report $

SubTotal $

AZ State Tax $

Navajo Nation Tax $

Grand Total $

PRICE SCHEDULE_CHINLE LAND TRANSFER

PARCELS B‐1‐2, G‐1, and P-1

File details come from the government source that posted it. Updated .