Price Breakdown Worksheet.pdf
PDF 66 KB Posted
- Solicitation number
- 36C25725R0097
About this file
This document is a Price Breakdown Worksheet template for a construction project, designed to itemize costs across 25 different construction and engineering divisions. The worksheet provides a structured format for contractors to detail material, labor, and equipment expenses for each division, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood/Plastics/Composites, Thermal & Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, and Utilities. The template also includes sections for calculating subtotal cost, general liability/insurance, overhead and profit, bonding, and the total project cost.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25725R0097 0001.docx | DOCX document | |
| AHA for Dallas VA CCR Example.xlsx | XLSX spreadsheet | |
| CONSTRUCTION SAFETY PIN 2025 UPDATED 20260120sc.pdf | ||
| Final RFI Questions and Answers_36C25726R0097_01.pdf | ||
| Site Visit Sign In Sheet.pdf | ||
| 36C25725R0097.docx | DOCX document | |
| Spec _SECTION 23 65 00 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIAL LABOR EQUIPMENT TOTAL
DIVISION 01: GENERAL REQUIREMENTS
DIVISION 02: EXISTING CONDITIONS
DIVISION 03: CONCRETE
DIVISION 04: MASONRY
DIVISION 05: METALS
DIVISION 06: WOOD, PLASTICS & COMPOSITES
DIVISION 07: THERMAL & MOISTURE PROTECTION
DIVISION 08: OPENINGS
DIVISION 09: FINISHES
DIVISION 10: SPECIALTIES
DIVISION 11: EQUIPMENT
DIVISION 12: FURNISHINGS
DIVISION 13: SPECIAL CONSTRUCTION
DIVISION 14: CONVEYING EQUIPMENT
DIVISION 21: FIRE SUPPRESSION
DIVISION 22: PLUMBING
DIVISION 23: HVAC
DIVISION 25: INTEGRATED AUTOMATION
DIVISION 26: ELECTRICAL
DIVISION 27: COMMUNICATIONS
DIVISION 28: ELECTRONIC SAFETY AND SECURITY
DIVISION 31: EARTHWORK
DIVISION 32: EXTERIOR IMPROVEMENTS
DIVISION 33: UTILITIES
SUBTOTAL COST:
GENERAL LIABILITY / INSURANCE:
OVERHEAD & PROFIT:
BOND:
PROJECT TOTAL COST:
File details come from the government source that posted it. Updated .