This price breakdown worksheet is for a solicitation to replace interior doors in Building 200 at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. The solicitation number is 36C26123R0043.
The price breakdown worksheet requires bidders to provide itemized pricing for materials, labor, equipment, and other costs for two divisions of work - Division 01 General Requirements and Division 08 Doors/Hardware. Bidders must also provide separate line items for overhead, profit, bonds and insurance, and a total proposed price. All other costs may be included as separate line items with descriptions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Presentation-11 July 2023.pdf | ||
| 36C26123R0043 0001.docx | DOCX document | |
| Site visit log-11Jul2023.pdf | ||
| RFI-Answer to Questions-Final-28 Jul 2023.pdf | ||
| ATTACHMENT A - PHASE 1 FACTOR 2 - EXPERIENCE.xlsx | XLSX spreadsheet | |
| DBA Wage Determination_San Mateo_CA20230018_23June2023.pdf | ||
| Map of VAMC -San Francisco Campus.pdf | ||
| ATTACHMENT C - PHASE 2 FACTOR 4 - Offeror Key Personnel.docx | DOCX document | |
| Combined Drawings Bldg 200.pdf | ||
| ATTACHMENT B - PHASE 1 FACTOR 3 - PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| SOW Replace Interior Doors - Building 200 _19Apr2023.pdf | ||
| 36C26123R0043.docx | DOCX document | |
| Specificaton_01 32 16 16_Network Analysis Schedules_21Apr2023.pdf | ||
| SPECIFICATIONS PROJECT 662-23-122_28Jun2023.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 36C26123R0043 Attachment - Price Breakdown
DESCRIPTION MATERIAL LABOR EQUIPMENT OTHER TOTAL
Division 01 -General Requirements Division Total $ $ $ $ $
Division 08 – Doors/Hardware MATERIAL LABOR EQUIPMENT OTHER TOTAL
Division Total $ $ $ $ $
SUB TOTAL $ $ $ $ $
Overhead $ $ $ $ $ Profit $ $ $ $ $ Bonds and Insurance $ $ $ $ $ TOTAL Proposal $ $ $ $ $