This is a Price Breakdown attachment for a federal construction solicitation (36C26127Q0026) issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. The price breakdown provides the cost structure template for the Replace B650 3rd and 2nd Flooring project (Project #612A4-27-018) at the Sacramento VA Medical Center in Mather, California. The breakdown organizes costs across multiple categories including project management and quality control oversight, mobilization, general requirements (Division 01), existing conditions demolition (Division 02), and finishes work (Division 09) such as subsurface preparation, gypsum board installation, resilient base and sheet flooring, resilient tile flooring, carpeting, and painting. Each line item is structured to capture material costs, equipment costs, and labor costs separately, with subtotals leading to a project grand total. The price breakdown also accounts for ancillary project costs including bonds, insurance, home office overhead, and profit margin.

The scope of work requires contractors to furnish all labor and materials for demolition, replacement, and installation of flooring, resilient base, stainless steel corner guards, and paint on the 3rd and 2nd floors of Building 650. All work must be performed outside normal working hours (7:30 AM to 4:00 PM, Monday through Friday) unless approved by the Contracting Officer, and contractors are responsible for waste disposal and compliance with VA infection control procedures. The attachment serves as the pricing template for bidders to submit their cost proposals for this construction project.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A - Price Breakdown 36C26127Q0026_2 - Project # 612A4-27-018, Replace B650 3rd and 2nd Flooring Attachment A - PRICE BREAKDOWN Description Material Equipment Labor Total

Project Manager/QC
Superintendent/Safety
Mobilization
Division 01 - General Requirements
General Requirements
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Construction Waste Management
Sustainable Construction Requirement
Division 02 - Existing Conditions
Demolition
Division 09- Finishes
Subsurface Preparation for Floor Finishes
Schedule for Finishes
Gypsum Board
Resilient Base and Accessories
Resilient Sheet Flooring
Resilient Tile Flooring
Carpeting
Painting
Bonds
Insurance
Home Office Overhead
Profit

SUB-TOTAL

PROJECT GRAND TOTAL