previous Site visit questions w-picture.pdf

PDF 463 KB Posted

Attached to
Total Small Business Set-Aside: 87A Test Tank resurface/repair
Solicitation number
N613312-25-R-002800001
Issued by

About this file

These site visit notes document a May 19, 2025 site visit for a Navy test pool repair project at NSWC-PCD. The notes record nine key questions and answers from the site visit, providing critical details about the project scope and site conditions. Contractors learned the 12-foot deep, 10-foot diameter in-ground test tank requires resurfacing, with specific constraints including maintaining a functional water pump, preserving a pool ladder, and working in temperature ranges from 32 to 100+ degrees. The site offers equipment access through an unlocked gate, includes a laydown area for storage, and is located approximately 50 yards from a base road. The solicitation is a 100% small business set-aside with a closing date of May 29, 2025 at 4:00 p.m. CDT. Accompanying photos show the current condition of the test pool, revealing a circular concrete tank with water, visible structural deterioration, and some surface equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE VISIT NOTES

87 A TEST POOL -NSWC-PCD

MAY 19, 2025, 10:00 AM CDT

Contractors attended: 1

Questions asked:

1. Is there room to bring in large pieces of equipment?

Government Answer: Yes, through the gate on site.

2. Will there be room to store the equipment?

Government Answer: Yes, there will be a laydown area

3. Is the site secure/does the gate get locked?

Government Answer: The site gate does not get locked. If you can get on the base, you can get onto the site.

4. What was used to repair previously?

Government Answer: Spot repairs and paint were used to repair the tank previously

5. Is there equipment that will need to be protected?

Government Answer: The water pump and lines should not be damaged during the pool repair. Also, a ladder acts as ingress/egress for the pool and must be maintained in working order

6. How hot and cold does the tank get?

Government Answer: The tank can experience temperatures from 32 degrees or below and up to 100+ degrees. The water insulates and stabilizes the temperature changes.

7. Is the tank pressurized?

Government Answer: No, the tank is not pressurized

8. Is the tank currently leaking?

Government Answer: No, the tank is not currently leaking

9. How far is it to the nearest exit?

Government Answer: The building covering the tank is approximately 50 yards from a base road

Solicitation closes on 29 May 2025 at 4:00 p.m. CDT

The requested photos have been added on the next page.