About this file
Summary of Scope of Work for Pressure Washing/Window Washing
This is a Statement of Work (SOW) for pressure washing and window washing services at Marine Forces Reserve in New Orleans, Louisiana. The scope encompasses four distinct service categories for which contractors must provide separate lump-sum pricing: building façade cleaning, pavement/hardscape pressure washing, window washing, and fencing cleaning. The total pressure-wash area is approximately 96,119 square feet, and the building includes 317 windows requiring exterior cleaning. The project includes a main building with exterior dimensions of 560'-4" x 194'-0" and additional structures (warehouse and band building) totaling approximately 20,202 square feet of façade to be cleaned.
The contractor must maintain minimum insurance coverage including Commercial General Liability ($1,000,000 per occurrence/$2,000,000 general aggregate), Automobile Liability ($1,000,000 combined single limit), Workers' Compensation (statutory with $1,000,000 Employers' Liability), and Umbrella/Excess Liability ($2,000,000 per occurrence/aggregate). Services include soft-wash chemical cleaning of stucco/concrete/metal façades using low-pressure application with manufacturer-approved solutions, pressure washing of parking lots and hardscapes, and exterior window and frame cleaning. The contractor must have minimum three years' experience in commercial exterior cleaning, perform pre-work test panels, provide detailed pre-work planning including access and traffic control plans, and meet stringent acceptance criteria for uniform cleaning without surface damage. Work is excluded during wind conditions exceeding safe limits, freezing temperatures below 40°F, lightning, heavy rain, or when runoff cannot be controlled. Contractors are responsible for their own quantity verification and independent analysis, as government-provided estimates are preliminary only.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - M6786126Q0017.pdf | ||
| Wage Determination (1) (1).docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date
2026-01-16
MARINE FORCES RESERVE
NEW ORLEANS, LA
PRESSURE WASHING / WINDOW WASHING SCOPE OF WORK
PRICING REQUIREMENTS:
CONTRACTOR SHALL PROVIDE
PRICING AS SEPARATE LUMP-SUMS
FOR EACH CATEGORY: BUILDING,
PAVEMENT, WINDOW WASHING AND
FENCING.
GENERAL NOTE – INSURANCE: Contractor shall maintain, at minimum: CGL (occurrence) $1,000,000 each occurrence / $2,000,000 general aggregate / $2,000,000 products-completed operations aggregate; Automobile Liability $1,000,000 CSL;
Workers’ Compensation statutory with Employers’ Liability $1,000,000; Umbrella/Excess Liability $2,000,000 each occurrence/aggregate.
UP TO EDGE OF
STREET AT ALL
TURNSTILE LOCATIONS
AREA TO PRESSURE WASH
LEGEND:
Date SK-10
PW- SITE
MFR- PRESSURE WASHING S.O.W.
2026-01-16
1" = 100'-0"
1 SITE PLAN- PRESSURE WASHING
TOTAL SQFT: APPROX. 96,119 SQFT
NOTE: SQUARE FOOTAGE EXCLUDES ALL WALLS AND FENCING. ALL
SQUARE FOOTAGE ESTIMATES ARE BASED ON 2D AREA ONLY.
NOTE:
Any quantities shown in the solicitation, drawings, specifications, schedules, or other contract documents are preliminary estimates only and are provided solely for the purpose of proposal preparation.
The Government makes no representation or warranty as to the accuracy or completeness of these quantities.
Proposers are responsible for performing their own independent analysis, verification, and quantity takeoffs as necessary to develop their proposals. By submitting a proposal, the Proposer acknowledges that it has reviewed the Contract Documents and has not relied solely on Government-provided quantity estimates in developing its price or schedule.
No adjustment to the Contract Price or Contract Time will be made solely due to differences between estimated quantities and the actual quantities required to perform the Work in accordance with the Contract Documents.
ALL SIDES OF PERIMETER FENCING.
ALL SIDES OF GUARDHOUSE.
UNDERSIDE OF WALKWAY CANOPY.
BREEZEWAY.
ALL SIDES OF SCREENING.
ADDITIONAL PLACES TO PRESSURE WASH:
ALL SIDES OF WALL.
Date SK-10.5
PW- SITE W/ PHOTOS
MFR- PRESSURE WASHING S.O.W.
2026-01-16
1" = 100'-0"
1 SITE PLAN
NOTE:
Any quantities shown in the solicitation, drawings, specifications, schedules, or other contract documents are preliminary estimates only and are provided solely for the purpose of proposal preparation. The Government makes no representation or warranty as to the accuracy or completeness of these quantities.
Proposers are responsible for performing their own independent analysis, verification, and quantity takeoffs as necessary to develop their proposals. By submitting a proposal, the Proposer acknowledges that it has reviewed the Contract Documents and has not relied solely on Government-provided quantity estimates in developing its price or schedule.
No adjustment to the Contract Price or Contract Time will be made solely due to differences between estimated quantities and the actual quantities required to perform the Work in accordance with the Contract Documents.
TOTAL SQFT: APPROX. 70,622 SQFT
TOTAL NUMBER OF WINDOWS: 317
NOTE:
Any quantities shown in the solicitation, drawings, specifications, schedules, or other contract documents are preliminary estimates only and are provided solely for the purpose of proposal preparation. The Government makes no representation or warranty as to the accuracy or completeness of these quantities.
Proposers are responsible for performing their own independent analysis, verification, and quantity takeoffs as necessary to develop their proposals.
By submitting a proposal, the Proposer acknowledges that it has reviewed the Contract Documents and has not relied solely on Government-provided quantity estimates in developing its price or schedule.
No adjustment to the Contract Price or Contract Time will be made solely due to differences between estimated quantities and the actual quantities required to perform the Work in accordance with the Contract Documents.
6"
0"
0"
560' - 4"
560' - 4"
NOTE: AREA NOT
ACCESSIBLE BY LIFT
NOTE: AREA NOT
ACCESSIBLE BY LIFT
WAREHOUSE
NOTE: CEILING AND ACCESS-WAY
TO BE PRESSURE WASHED. CEILING
AREA NOT INCLUDED IN SQFT
CALCULATIONS.
AREA TO PRESSURE WASH
LEGEND:
(SEE NEXT PAGE)
NORTH ELEVATION- MAIN BLDG
SOUTH ELEVATION- MAIN BLDG
0"
0"
194' - 0" 194' - 0"
EAST ELEVATION- MAIN BLDG WEST ELEVATION- MAIN BLDG
Date SK-11
PW- MFR ELEVATIONS
MFR- PRESSURE WASHING S.O.W.
2026-01-16
1" = 50'-0"
1 EXT ELEVATIONS- PRESSURE WASHING- MFR
4"
4"
4"
Date SK-12
PW- WAREHOUSE & BAND
ELEV.MFR- PRESSURE WASHING S.O.W.
2026-01-16
NOTE:
Any quantities shown in the solicitation, drawings, specifications, schedules, or other contract documents are preliminary estimates only and are provided solely for the purpose of proposal preparation. The Government makes no representation or warranty as to the accuracy or completeness of these quantities.
Proposers are responsible for performing their own independent analysis, verification, and quantity takeoffs as necessary to develop their proposals. By submitting a proposal, the Proposer acknowledges that it has reviewed the Contract Documents and has not relied solely on Government-provided quantity estimates in developing its price or schedule.
No adjustment to the Contract Price or Contract Time will be made solely due to differences between estimated quantities and the actual quantities required to perform the Work in accordance with the Contract Documents.
TOTAL SQFT: APPROX. 20,202 SQFT
TOTAL NUMBER OF WINDOWS: 20
1" = 40'-0"
5 WEST ELEVATION- BAND WING
1" = 40'-0"
3 EAST ELEVATION- WAREHOUSE
1" = 40'-0"
4 WEST ELEVATION- WAREHOUSE
1" = 40'-0"
1 SOUTH ELEVATION- WAREHOUSE
1" = 40'-0"
2 NORTH ELEVATION- WAREHOUSE
AREA TO PRESSURE WASH
LEGEND:
Date SK-13
SPEC- 013546
MFR- PRESSURE WASHING S.O.W.
2026-01-16
SECTION 01 35 46 – EXTERIOR PRESSURE WASHING AND SOFT WASH CLEANING
PART 1 – GENERAL
1.1 SUMMARY
A. Work includes furnishing all labor, supervision, equipment, materials, chemicals, water supply, access equipment, traffic control, and incidentals required to clean:
1. Parking lots / sidewalks / exterior hardscape by pressure washing.
2. Exterior stucco/concrete/Metal façade/strucutres by chemical application (soft wash) and low-pressure rinse, up to full building height.
B. Work includes protection of adjacent surfaces, landscaping, doors/windows, electrical devices, and vehicles.
1.2 RELATED REQUIREMENTS
A. Not used.
1.3 DEFINITIONS
A. Pressure Washing: Mechanical cleaning using pressurized water for exterior hardscape.
B. Soft Wash: Low-pressure application of approved cleaning solution to remove organic growth and staining, followed by low-pressure rinse.
C. Working Height: Vertical reach required to perform cleaning from access equipment
1.4 SUBMITTALS
A. Pre-Work Plan (submit 7 days prior): sequence, staffing, hours, work zones, protection plan, and coordination plan.
B. Product Data for all cleaners, surfactants, and rinsing agents.
C. SDS for all chemicals.
D. Equipment List: pressure washer (GPM/PSI), nozzles, surface cleaner size, hoses, injectors, pumps, and access equipment.
E. Access Plan: boom lift type/class, reach, platform capacity, tie-off plan, rescue plan.
F. Traffic Control Plan for parking lot work areas.
G. Test Panel Plan identifying locations and acceptance criteria.
1.5 QUALITY ASSURANCE
A. Contractor shall have a minimum of 3 years’ experience performing commercial exterior cleaning including façade soft-wash and hardscape washing.
B. Provide an onsite competent person for lift operations and a crew lead experienced with soft wash on stucco/concrete.
C. Perform test panels prior to full production.
1.6 FIELD CONDITIONS
A. Do not apply chemicals or wash during:
1. Wind conditions causing overspray drift beyond work area.
2. Freezing conditions or when surfaces are below 40°F.
3. Lightning, heavy rain, or when runoff cannot be controlled safely.
B. Coordinate water source with Owner. Contractor to provide backflow prevention as required by site.
1.7 WARRANTY
A. Not used.
PART 2 – PRODUCTS
2.1 CLEANING CHEMICALS (FACADE SOFT WASH)
A. Use manufacturer-recommended exterior building wash compatible with stucco/concrete/metal and adjacent materials.
B. Chemicals shall be:
1. Non-abrasive; no sandblasting media.
2. Free of hydrofluoric acid and muriatic acid unless specifically approved in writing by Owner (generally not allowed).
3. Applied per manufacturer dilution and dwell limits.
C. Provide surfactant as needed for cling and uniform dwell.
2.2 HARD-SURFACE CLEANING (PARKING LOT)
A. Water-only cleaning is preferred where feasible.
B. If detergent/degreaser is required for oil/grease staining, use a product labeled for exterior hardscape and follow label directions; do not leave residue.
2.3 EQUIPMENT
A. Pressure washer(s) capable of delivering not less than 8 GPM at operating pressure appropriate for the surfaces.
B. Surface cleaner attachment sized to meet production requirements; contractor shall select equipment that provides uniform cleaning without striping.
C. Soft-wash application system: downstream injector, low-pressure pump, or pump sprayer suitable for façade application.
D. Boom lift (if required) suitable work height and reach for complete façade access.
Date SK-14
SPEC- 013546 CONTINUED
MFR- PRESSURE WASHING S.O.W.
2026-01-16
PART 3 – EXECUTION
3.1 EXAMINATION
A. Verify surfaces are sound and suitable for cleaning. Notify Owner of:
1. Loose stucco/concrete, failing paint, open joints, missing sealant, or damaged areas.
2. Any conditions that may worsen with washing.
B. Identify sensitive items: cameras, access control, lighting, receptacles, signage, sealant joints, louvers, and vehicles.
3.2 PROTECTION
A. Protect adjacent surfaces from overspray and runoff staining.
B. pre-wet and continuously protect landscaping, rinse vegetation after chemical use.
C. Shield electrical devices, cameras, access controls, lighting, receptacles, and openings. Do not direct water into building penetrations or around doorways.
D. Provide cones/barricades and maintain pedestrian safety.
3.3 TEST PANELS
A. Perform two test panels minimum:
1. One on façade (representative staining).
2. One on parking lot/hardscape (representative soiling).
B. Test panel shall establish:
• Chemical dilution and dwell time
• Application method
• Rinse method and distance
• Acceptance criteria
C. Do not proceed until Owner’s Representative accepts test results.
3.4 STUCCO/CONCRETE FAÇADE CLEANING (SOFT WASH) – PROCEDURE
A. Perform soft wash as follows:
1. Apply solution using low pressure only (no high-pressure blasting).
2. Allow dwell time per product instructions; do not allow solution to dry on surface.
3. Rinse top-down with a wide fan tip and sufficient standoff distance to avoid damage.
4. Repeat mild application as needed rather than increasing pressure.
B. Pressure limits:
• Maintain rinse pressure and distance such that finishes are not etched, dislodged, or roughened.
• Turbo nozzles are prohibited on stucco-like finishes.
C. Uniformity: Work in vertical sections; maintain consistent overlap to prevent striping.
3.5 PARKING LOT / HARDSCAPE PRESSURE WASHING – PROCEDURE
A. Pre-sweep debris as needed.
B. Pressure wash using surface cleaner to achieve uniform appearance without striping.
C. Spot treat oil/grease only where present; rinse thoroughly.
D. Maintain safe pedestrian routing and prevent slip hazards; post wet-surface signage.
3.6 RUNOFF AND HOUSEKEEPING
A. Contractor shall prevent nuisance conditions to adjacent areas (tracking, overspray, slippery surfaces).
B. Wash-and-run is permitted only where allowed by site rules; contractor remains responsible for preventing property damage and maintaining safe conditions.
C. Leave site clean; remove debris generated by cleaning operations.
3.7 ACCEPTANCE CRITERIA
A. Façade: Visible organic growth, streaking, and dirt film removed to a uniform, cleaned appearance consistent with approved test panel. No damage to finish.
B. Hardscape: Uniform cleaned appearance consistent with test panel; no excessive striping or residue.
3.8 MEASUREMENT AND PAYMENT (OPTIONAL – IF YOU WANT UNIT PRICING)
A. Parking lot/hardscape cleaning paid by lump sum.
B. Façade soft wash: paid by lump sum (elevation area).
C. Access equipment: include in unit price unless bid schedule provides separate line item.
D. Mobilization: include in unit price unless bid schedule provides separate line item.
END OF SECTION
Date SK-15
WINDOW WASHING SPEC
MFR- PRESSURE WASHING S.O.W.
2026-01-16
Exterior Window Washing Specification
1. SCOPE
Provide all labor, supervision, equipment, access devices, tools, and materials to clean exterior glazing surfaces at the facility, including:
• Exterior glass on windows, storefront glazing, sidelites, transoms, and exterior glass doors (as applicable)
• Exterior-facing frames and sills (wipe-down included)
• Do not clean interior glass under this scope
2. EXCLUSIONS
Unless specifically listed in the inventory/attachment:
• Skylights, roof glazing, and atrium glass
• Interior glass partitions
• Removal of sealants/caulking, glazing repairs, scratch removal, or restoration polishing
3. MATERIALS AND METHODS
• Use non-abrasive cleaning agents compatible with tinted/low-E/coated glass.
• Use squeegee/microfiber methods or DI/pure water cleaning methods if they meet acceptance criteria.
• Protect building envelope: do not force water into weeps, joints, or penetrations.
• Prohibited: abrasive pads, acids, or razor scraping unless manufacturer-approved and authorized by the Owner/COR due to scratch risk.
4. EXECUTION REQUIREMENTS
For each exterior glazed opening:
1. Remove loose debris from exterior sills/ledges.
2. Wash glass (scrub) and squeegee or rinse to a spot-free finish.
3. Detail edges; remove drips and runs.
4. Wipe exterior-facing frames and sills clean.
5. Remove minor adhesive/tape residue and light soiling where feasible without damaging coatings.
5. ACCESS, PROTECTION, AND SITE CONTROL
• Provide safe access (extension poles, ladders, lifts, scaffolding) as required.
• Barricade work areas below overhead work; maintain pedestrian safety and egress.
• Prevent overspray or runoff onto sensitive areas (entries, sidewalks, vehicles, landscaping, HVAC intakes).
• COORDINATE WITH SECURITY REQUIREMENTS AND RESTRICTED AREAS.
• Do not allow overspray or runoff into HVAC outside air intakes or electrical equipment.
6. NOT USED
7. SAFETY
• Comply with OSHA requirements for ladders, lifts, and fall protection.
• Lift/scaffold operators shall be trained/authorized; inspect equipment daily.
• Use appropriate PPE and manage chemical SDS on-site.
8. QUALITY CONTROL / ACCEPTANCE
Work is acceptable when:
• Exterior glass is free of visible dirt, streaks, smears, and water spotting when viewed from 10 feet in normal daylight.
• No drips, runoff stains, or residue are left on facade materials, sills, sidewalks, or entries.
• Work areas are left clean and free of debris.
Rework: Deficiencies shall be corrected at no additional cost.
9. WEATHER CONSTRAINTS
Do not perform exterior washing when conditions will degrade results or create hazards, including:
• Lightning or high winds impacting lift/ladder safety
• Freezing conditions or when ice may form on walking surfaces
• Heavy rain (unless method is designed for it and still meets acceptance)
10. MEASUREMENT AND PAYMENT
Payment shall be lump sum for complete performance of the exterior window washing scope described herein, inclusive of all labor, materials, equipment, access, protection, and incidentals required to deliver an acceptable finished product.
END OF SECTION
| Sheets |
| SK-9 - COVER SHEET |
| SK-10 - PW- SITE |
| SK-10.5 - PW- SITE W/ PHOTOS |
| SK-11 - PW- MFR ELEVATIONS |
| SK-12 - PW- WAREHOUSE & BAND ELEV. |
| SK-13 - SPEC- 013546 |
| SK-14 - SPEC- 013546 CONTINUED |
| SK-15 - WINDOW WASHING SPEC |