Presolicitation Notice_FTG TMP_15 May 2025.pdf

PDF 250 KB Posted

Attached to
Fort Gibson Turbine Maintenance Platform (TMP)
Solicitation number
Yandell0001
Issued by

About this file

This document is a Pre-solicitation notice for a federal contract opportunity issued by the US Army Corps of Engineers on 15 May 2025. The solicitation (W912BV25A007) seeks proposals for fabricating and load testing one Turbine Maintenance Platform (TMP) for the Fort Gibson Powerhouse main unit turbines, with a competent assembly specialist required for the first at-site assembly. The procurement is a 100% small business set-aside using the Lowest Price Technically Acceptable method, with a firm-fixed price contract anticipated. The North American Industry Classification System (NAICS) code is 332312 for fabricated structural metal manufacturing, with a size standard of 500 employees.

The Request for Proposal (RFP) is expected to be issued in early June 2025, with proposals due mid-June 2025. The contract work will predominantly be performed at Fort Gibson Powerhouse in Oklahoma. Prospective offerors must register with the System for Award Management (SAM) and will only receive solicitation documents electronically through SAM.gov. The period of performance will be proposed by the offerors, and no reimbursement will be provided for costs associated with responding to the synopsis or information requests.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Action Code: This is a Pre-solicitation notice.

2. Date: 15 May 2025

3. Contracting Office Address:

USACE CEST-CT-E

2488 E 81st Street Tulsa, Oklahoma 74137-4290

4. Classification Code: 54 – Prefab Structures/Scaffolding

5. Subject Title: Fort Gibson Turbine Maintenance Platform (TMP)

6. Solicitation Number: W912BV25A007

7. Contact(s) Points:

Name: Clinton J. Yandell Shawn G. Brady Phone: 918-669-4920 918-669-4984 Email: clinton.j.yandell@usace.army.mil shawn.g.brady@usace.army.mil

8. Important: This notice does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by FAR 5.2 - Synopsis of Proposed Contract Actions in preparation for release of the Invitation for Bid (IFB) at a later date.

9. Description: The RFP for this project is expected to be issued on or about the beginning of June 2025.

The Proposal due date is planned on or about, middle of June 2025. The North American Industry Code Standard is NAICS 332312 – fabricated Structural Metal Manufacturing, and the size standard is 500 employees. The planned procurement method is contracting by Lowest Price Technically Acceptable.

The resulting contract is planned to be a firm-fixed price contract for the work described in the Statement of Work which will be provided with the solicitation.

The US ARMY CORPS OF ENGINEERS is seeking proposals for fabrication and load testing of one new TMP for the Fort Gibson Powerhouse main unit turbines, ready for installation. A competent assembly specialist shall be provided during the first at-site assembly.

10. Place of Contract Performance: The preponderance of the work to be placed under this contract is expected to be performed at Fort Gibson Powerhouse, Oklahoma.

11. Set Aside Status: This will be a 100% Small Business Set-aside.

12. Additional Details: THIS SOLICITATION WILL BE OFFERED IN ELECTRONIC FORMAT ONLY. NO HARD COPIES WILL BE PROVIDED. Offerors can view and/or download the Request for Proposal (RFP) and attachments at https://www.sam.gov when it is posted. Interested parties can register under the Interested Vendors List at FBO. This will be the only method of amendment distribution, therefore, it is the OFFERORS’ RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective offerors MUST register themselves on the website. Prospective offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM in order to participate in this procurement.

13. Period of Performance (POP): The POP shall be proposed by the Offeror(s).

14. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests.

File details come from the government source that posted it. Updated .