Summary of Proposed Costs BARDA-08-20TEMPLATE.xls

XLS spreadsheet 178 KB Posted

Attached to
Advanced Development of Next Generation Portable Ventilators Federal contract opportunity
Solicitation number
PreSol-HHS-BARDA-08-20
Issued by
Department of Health and Human Services Immediate Office of the Secretary

About this file

Attachment 08

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Development of Next Generation Portable Ventilators, newest first.
File Type Posted
Amendment3-SF30.pdf PDF
RFP Questions-BARDA-08-20.pdf PDF
Amendment1-SF30.pdf PDF
RFP-BARDA-08-20 FINAL 12-12-08.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions OMB Control No. 9000-0013

&A Page &P How to use this Excel file:

(Updated 1/3/2006) This file is intended to help you prepare your cost proposal. If you provide us with an electronic copy of the cost proposal, we can save time by not recreating it. This will help speed up the review/award process and perhaps reduce the number of questions we need to ask in order to understand your proposal. We understand that one spreadsheet format can not fit every situation; however, we have attempted to create a simple model that fits many circumstances that arise in Government contracting. Feel free to modify the spreadsheet to fit your circumstances, and to use the parts that work for you. There are more specific instructions on specific cost element sheets where applicable.

Summary Sheet Please insert the contractor's Name in cell B2.

The totals from each cost element sheet are automatically carried forward to the Summary sheet.

Labor Use the Labor sheet to show direct labor hours by labor category. The proposed amounts must be based on current and projected payroll information. Supporting documentation may be requested at a later date.

Indirect Costs and Fee or Profit Utilize the blank Indirect Costs and Fee or Profit sheets as needed. Include any additional breakdowns, as applicable, on the other blank sheets in this spreadsheet. Add additional lines or columns as needed to any existing spreadsheet. You may use the Indirect Costs sheet to explain fringe benefit rates.

Note Please provide a brief summary statement to explain any changes made to this model spreadsheet format.

Summary

SUMMARY OF PROPOSED COSTS AND PROFIT
Contractor's Name**
RFP No.HHS-BARDA--08-20
CLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006TOTAL
TOTAL LABOR HOURS0000000
DIRECT LABOR COST0000000
FRINGE BENEFITS0%00%00%00%00%00%00
TOTAL DIRECT LABOR & FRINGE BENEFITS$0$0$0$0$0$0$0
* OVERHEAD0%$00%$00%$00%$00%$00%$0$0
MATERIALS AND SUPPLIES$0$0$0$0$0$00
PROFESSIONAL TRAVEL0000000
EQUIPMENT0000000
CONSULTANTS0000000
OTHER DIRECT COSTS0000000
PATIENT CARE COST0000000
SUBCONTRACTS0000000
TOTAL OTHER DIRECT COSTS$0$0$0$0$0$0$0
SUBTOTAL: OTHER DIRECT AND TOTAL LABOR$0$0$0$0$0$0$0
* EXCLUSION FROM BASE FOR G&A0000000
* ADJUSTED BASE FOR G&A$0$0$0$0$0$0$0
* G&A0%00%00%00%00%00%00
TOTAL PROPOSED COST EXCLUDING PROFIT0000000
PROPOSED PROFIT0%00%00%00%00%00%00
TOTAL PROPOSED PRICE$0$0$0$0$0$0$0
*
**

&L&12ATTACHMENT 8

Not all organizations allocate indirect cost in the same way. It is important that you use the indirect rate structure applicable to your organization. For example, if you have a three tier indirect rate structure, then you will use a three tier structure when proposing indirect costs.

Generally, Universities and Non-Profits have fringe benefit and G&A (or sometimes called F&A) rates, while For-Profit Companies can have various indirect rates such as fringe benefits, overhead, G&A, etc.

The base for overhead costs includes direct labor and fringe benefits. Please modify if your base is different.

If applicable, insert exclusions to the G&A base in row 22.

Please insert the Company's name.

Labor

DIRECT LABOR
**CLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006TOTAL
RFPHHS-BARDA--08-20DIRECTDIRECTDIRECTDIRECTDIRECTDIRECTDIRECT
HOURLYNUMBERLABORNUMBERLABORNUMBERLABORNUMBERLABORNUMBERLABORNUMBERLABORLABOR
LABOR CATEGORYRATEHOURSCOSTHOURSCOSTHOURSCOSTHOURSCOSTHOURSCOSTHOURSCOSTCOST
1$0.000.00$00.00$00.00$00.00$00.00$00.00$0$0
20.000.00$00.00$00.00$00.00$00.00$00.00$0$0
30.000.00$00.00$00.00$00.00$00.00$00.00$0$0
40.000.00$00.00$00.00$00.00$00.00$00.00$0$0
50.000.00$00.00$00.00$00.00$00.00$00.00$0$0
60.000.00$00.00$00.00$00.00$00.00$00.00$0$0
70.000.00$00.00$00.00$00.00$00.00$00.00$0$0
80.000.00$00.00$00.00$00.00$00.00$00.00$0$0
90.000.00$00.00$00.00$00.00$00.00$00.00$0$0
100.000.00$00.00$00.00$00.00$00.00$00.00$0$0
110.000.00$00.00$00.00$00.00$00.00$00.00$0$0
120.000.00$00.00$00.00$00.00$00.00$00.00$0$0
130.000.00$00.00$00.00$00.00$00.00$00.00$0$0
140.000.00$00.00$00.00$00.00$00.00$00.00$0$0
150.000.00$00.00$00.00$00.00$00.00$00.00$0$0
160.000.00$00.00$00.00$00.00$00.00$00.00$0$0
170.000.00$00.00$00.00$00.00$00.00$00.00$0$0
180.000.00$00.00$00.00$00.00$00.00$00.00$0$0
190.000.00$00.00$00.00$00.00$00.00$00.00$0$0
200.000.00$00.00$00.00$00.00$00.00$00.00$0$0
210.000.00$00.00$00.00$00.00$00.00$00.00$0$0
220.000.00$00.00$00.00$00.00$00.00$00.00$0$0
230.000.00$00.00$00.00$00.00$00.00$00.00$0$0
240.000.00$00.00$00.00$00.00$00.00$00.00$0$0
250.000.00$00.00$00.00$00.00$00.00$00.00$0$0
260.000.00$00.00$00.00$00.00$00.00$00.00$0$0
270.000.00$00.00$00.00$00.00$00.00$00.00$0$0
280.000.00$00.00$00.00$00.00$00.00$00.00$0$0
290.000.00$00.00$00.00$00.00$00.00$00.00$0$0
300.000.00$00.00$00.00$00.00$00.00$00.00$0$0
310.000.00$00.00$00.00$00.00$00.00$00.00$0$0
0.00$00.00$00.00$00.00$00.00$00.00$0$0

Page &P

Materials

SUMMARY OF MATERIALS AND SUPPLIES
**
RFPHHS-BARDA--08-20
CLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006
UnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnit
ITEMPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalTOTAL
1$0.000$0.00$0.000$0.00$0.000$0.00$0.000$0.00$0.000$0.00$0.000$0.00$0.00
20.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
30.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
40.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
50.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
60.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
70.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
80.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
90.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
100.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
110.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
120.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
130.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
140.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
150.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
160.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
170.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
180.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
190.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
200.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
210.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
220.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
230.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
240.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
250.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
260.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
270.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
280.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
290.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
300.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
TOTAL =$0.00$0.00$0.00$0.00$0.00$0.00$0.00

&L&24&USUMMARY OF MATERIALS AND SUPPLIES

Page &P Please use current catalog or vendor quotes. Supporting documentation may be requested at a later date.

Travel

SUMMARY OF TRAVEL COSTS
**
RFPHHS-BARDA--08-20
Contract Line Item Number000100020003000400050006TOTAL
Trip #1111111
Site
Reason
Airfare$0$0$0$0$0$0
Lodging000000
Meals000000
Incidentals000000
Ground Transport000000
# of Days000000
Total Per Trip$0$0$0$0$0$0
No. of persons000000
SUBTOTAL =$0$0$0$0$0$0$0
Trip #2222222
Site
Reason
Airfare$0$0$0$0$0$0
Lodging000000
Meals000000
Incidentals000000
Ground Transport000000
# of Days000000
Total Per Trip$0$0$0$0$0$0
No. of persons000000
SUBTOTAL =$0$0$0$0$0$0$0
Trip #3333333
Site
Reason
Airfare$0$0$0$0$0$0
Lodging000000
Meals000000
Incidentals000000
Ground Transport000000
# of Days000000
Total Per Trip$0$0$0$0$0$0
No. of persons000000
SUBTOTAL =$0$0$0$0$0$0$0
TOTAL COST BY CLIN =$0$0$0$0$0$0$0

Page &P Please review the RFP for the recommended number of trips and destinations if applicable. Please use the company or institutional travel policy unless current Government Per Diem rates are utilized. Please use current vendor quotes for airfare and other travel costs. Supporting documentation may be requested at a later date.

Equipment

SUMMARY OF EQUIPMENT COSTS
**
RFPHHS-BARDA--08-20
CLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006
UnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnit
ITEMPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalTOTAL
1$0.000$0.00$0.000$0.00$0.000$0.00$0.000$0.00$0.000$0.00$0.000$0.00$0.00
20.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
30.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
40.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
50.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
60.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
70.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
80.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
90.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
100.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
110.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
120.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
130.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
140.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
150.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
160.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
170.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
180.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
190.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
200.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
210.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
220.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
230.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
240.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
250.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
260.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
270.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
280.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
290.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
300.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
TOTAL =$0.00$0.00$0.00$0.00$0.00$0.00$0.00

&L&24&USUMMARY OF EQUIPMENT COSTS

Page &P All proposed equipment costs should include a justification and be based on current vendor quotes. Supporting documentation may be requested at a later date.

Consultants

SUMMARY OF CONSULTANT COSTS
**
RFPHHS-BARDA--08-20
CLIN 0001CLIN 0002CLIN 0003
CONSULTANTRate# Hours# DaysTravelSubtotalRate# Hours# DaysTravelSubtotalRate# Hours# DaysTravelSubtotal
(1)$0$0$0$0$0$0$0$0$0
(2)000000000
(3)000000000
(4)000000000
(5)000000000
(6)000000000
(7)000000000
(8)000000000
(9)000000000
(10)000000000
TOTAL =$0$0$0
CLIN 0004CLIN 0005
CONSULTANTRate# Hours# DaysTravelSubtotalRate# Hours# DaysTravelSubtotal
(1)$0$0$0$0$0$0
(2)000000
(3)000000
(4)000000
(5)000000
(6)000000
(7)000000
(8)000000
(9)000000
(10)000000
TOTAL =$0$0
CLIN 0006
CONSULTANTRate# Hours# DaysTravelSubtotalTOTAL
(1)$0$0$0$0
(2)000$0
(3)000$0
(4)000$0
(5)000$0
(6)000$0
(7)000$0
(8)000$0
(9)000$0
(10)000$0
TOTAL =$0$0

Page &P Please provide a complete breakdown for each consultant with rates for the number hours or days plus any proposed travel costs (including travel rates). Please obtain a letter of commitment which shows the base rate for each consultant. Supporting documentation may be requested at a later date.

Other Direct

SUMMARY OF OTHER DIRECT COSTS
**
RFPHHS-BARDA--08-20
CLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006
UnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnit
ITEMPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalTOTAL
1$0.000$0.00$0.000$0.00$0.000$0.00$0.000$0.00$0.000$0.00$0.000$0.00$0.00
20.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
30.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
40.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
50.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
60.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
70.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
80.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
90.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
100.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
110.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
120.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
130.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
140.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
150.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
160.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
170.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
180.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
190.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
200.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
210.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
220.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
230.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
240.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
250.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
260.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
270.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
280.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
290.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
300.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
TOTAL =$0.00$0.00$0.00$0.00$0.00$0.00$0.00

&L&24&USUMMARY OF OTHER DIRECT COSTS

Page &P Please use current catalog prices or vendor quotes. Supporting documentation may be requested at a later date.

Patient Care

SUMMARY OF PATIENT CARE COSTS
**
RFPHHS-BARDA--08-20
CLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006
UnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnit
ITEMPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalPriceQuantitySubtotalTOTAL
1$0.000$0.00$0.000$0.00$0.000$0.00$0.000$0.00$0.000$0.00$0.000$0.00$0.00
20.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
30.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
40.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
50.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
60.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
70.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
80.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
90.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
100.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
110.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
120.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
130.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
140.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
150.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
160.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
170.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
180.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
190.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
200.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
210.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
220.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
230.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
240.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
250.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
260.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
270.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
280.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
290.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
300.0000.000.0000.000.0000.000.0000.000.0000.000.0000.00$0.00
TOTAL =$0.00$0.00$0.00$0.00$0.00$0.00$0.00

&L&24&USUMMARY OF PATIENT CARE COSTS

Page &P Please use current institutional costs or vendor quotes. Supporting documentation may be requested at a later date.

Subcontracts

SUMMARY OF SUBCONTRACTOR COSTS
**
RFPHHS-BARDA--08-20
SUBCONTRACT #, SUBCONTRACTOR NAME, DESCRIPTIONCLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006TOTAL
(1)$0$0$0$0$0$0$0
(2)000000$0
(3)000000$0
(4)000000$0
(5)000000$0
(6)000000$0
(7)000000$0
(8)000000$0
(9)000000$0
(10)000000$0
TOTAL =$0$0$0$0$0$0$0

Page &P A complete breakdown and summary sheet for each proposed subcontract must be included with the prime proposal. The same format should be used for both the prime and subcontract proposals.

Indirect Costs

INDIRECT COSTS
**
RFPHHS-BARDA--08-20

&A Page &P

Profit

PROFIT
**
RFPHHS-BARDA--08-20

&A Page &P

File details come from the government source that posted it. Updated .