Prequalification Cover Letter 11_21_25.pdf
PDF 132 KB Posted
- Solicitation number
- PE-66365-NONST-2026-000000029
- Issued by
- Cobb County, Georgia
About this file
This is a prequalification cover letter from the Cobb County-Marietta Water Authority (CCMWA) requesting qualification packages from contractors for upcoming ductile iron pipe water main construction projects in Georgia. All contractors, including those previously qualified, must submit updated qualifications to be pre-qualified prior to public advertisement of pipeline construction projects. Contractors will be pre-qualified based on pipe size and ductile iron pipe materials capabilities. Submission requirements include five hard copies of the contractor's qualification statement and application, one PDF copy on a USB drive, and one separately sealed copy of financial records. The deadline for submission is 2:00 p.m. on Monday, January 5, 2026, at the CCMWA office located at 1170 Atlanta Industrial Drive, Marietta, Georgia 30066.
Pre-qualification evaluation will be conducted by CCMWA's Engineering, Transmission, and Finance staff and will assess demonstrated experience with ductile iron pipe installation, personnel qualifications, and financial capability. Contractors meeting all requirements will be recommended to the CCMWA Board for pre-qualification status for a two-year cycle. Contractors may apply at any time during the cycle, though Board approval is required for final pre-qualification status. Administrative or technical questions regarding the pre-qualification process should be directed to Austin Woodall at 770-514-5206 or awooodall@ccmwa.org.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Form for Similar Project _ References 11_2025.pdf | ||
| CCMWA DIP Pipeline Contractor Application 11_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1170 Atlanta Industrial Drive, Marietta, GA 30066 770-514-5300, 770-514-5225 Fax
M E M O R A N D U M
TO: Ductile Iron Pipeline Contractors
FROM: Austin Woodall
DATE: November 21, 2025
RE: Pre-Qualification for Ductile Iron Pipe Water Main Construction Projects For Cobb County – Marietta Water Authority
The Cobb County–Marietta Water Authority (CCMWA) is requesting pre-qualification packages from contractors for upcoming Ductile Iron Pipe water main construction projects. All contractors, including previously qualified firms, must submit updated qualifications. Contractors must be pre-qualified prior to the first public advertisement of any CCMWA pipeline construction project. Pipeline Contractors will be pre-qualified for size and Ductile Iron Pipe materials.
Enclosed are the updated CCMWA Ductile Iron Pipe Contractor Pre-Qualification Requirements for your review. Applications will be accepted at the CCMWA office, 1170 Atlanta Industrial Drive, Marietta, GA 30066, until 2:00 p.m. on Monday, January 5, 2026.
Please submit the following in a sealed manila envelope clearly marked with the firm’s name and titled “Pre-Qualification for Ductile Iron Pipe Water Main Construction Projects for the Cobb County– Marietta Water Authority”:
• Five (5) hard copies of the Contractor’s Qualification Statement and Application
• One (1) PDF copy on a USB drive
• One (1) separately sealed copy of financial records
Pre-qualification requirements are based on demonstrated experience with ductile iron pipe installation, as well as personnel qualifications and financial capability. Submittals will be reviewed by CCMWA’s Engineering, Transmission, and Finance staff. Contractors meeting all requirements will be recommended to the CCMWA Board for prequalification status for a 2-year cycle. Contractors may apply at any time during the cycle, but approval by the CCMWA Board is still required.
If you have administrative questions about the pre-qualification process or technical questions regarding the requirements, please contact me at 770-514-5206 or awooodall@ccmwa.org.
Sincerely, Austin B. Woodall Enclosure
James C. Scott, Jr., Chair T. Daniel Buyers, Vice Chair Charlie N. Crowder, Secretary James A. Balli, Member
Griffin “Grif” L. Chalfant, Jr., Member Lisa N. Cupid, Member Charles “Corkey” A. Welch, Member Cole E. Blackwell, CPA, General Manager mailto:awooodall@ccmwa.org
File details come from the government source that posted it. Updated .