Form for Similar Project _ References 11_2025.pdf

PDF 98 KB Posted

Attached to
Pre-Qualification for Ductile Iron Pipe Water Main Construction Projects
Solicitation number
PE-66365-NONST-2026-000000029
Issued by
Cobb County, Georgia

About this file

This is a Form for Similar Project References submitted to the Cobb County-Marietta Water Authority (CCMWA) in Georgia for pre-qualification to perform Ductile Iron Pipe water main construction projects. The form requires contractors to document their experience with similar projects, including details about project scope, location, completion dates, contract values, and client references. Contractors must provide information on multiple completed projects to demonstrate their capability and experience in pipeline construction, specifically with ductile iron pipe materials and various project sizes. The pre-qualification process requires all contractors, including those previously qualified, to submit updated qualifications prior to bidding on any CCMWA pipeline construction project. Contractors will be evaluated and pre-qualified based on their qualifications for specific pipe sizes and ductile iron pipe materials to ensure they meet the Authority's technical and experience standards.

The form serves as a critical document in the pre-qualification evaluation process, allowing CCMWA to assess contractor capability and past performance before projects are publicly advertised. By requiring detailed similar project references, the Authority can verify that contractors possess the necessary experience, resources, and track record to successfully execute water main construction work. The submission of this form is mandatory for all interested contractors and represents a prerequisite step in the competitive bidding process for CCMWA pipeline projects.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORM FOR SIMILAR PROJECT AND REFERENCES – DUCTILE IRON PIPE WATER MAIN

CONSTRUCTION

Please use one form per project.

Name of Contractor: _____________________________________________________ Project Manager: ______________________ Project Superintendent:___________________

Project Name: _______________________________________________________________ Location: ___________________________________________________________________

Project Owner: ______________________________________________________________________

Address: ____________________________________________________________________ Contact Person: ______________________________________________________________ Contact Person’s Telephone: ____________________________________________________

Project Engineer: ____________________________________________________________________

Address: ____________________________________________________________________ Contact Person: ______________________________________________________________ Contact Person’s Telephone: ____________________________________________________

Contract Amount: Original: $________________ Final: $________________________

Year Installed: _______________ % Self Performed: _______________

Contract Completion Time: On Time: _________________ Late: _________________________

Description of water pipeline:

Pipe Size: ______________________________ Pipe Material: __________________________

Pipe Length: ____________________________ Bores (approx. length & size): _____________

Restrained Length (approx.) ________________

Did you provide performance and/or payment bonds on this project? Yes___ No ___

Was this water main constructed within the right-of-way of an active public roadway and/or at a road intersection? Yes___ No___

Did this project require traffic control, diversion, and maintenance within the right-of-way and/or at a road intersection? Yes ___ No ___

Did this project include wet taps or cut ins? Yes___ No ___ #________

Did this project include rock excavation? Yes___ No ___

Did you perform work within “wetlands”? Yes____ No_____

Did this project include the restoration of landscape? Yes ___ No ___

Did this project include pavement replacement? Yes ___ No ___

Did this project include coordination and work in conjunction with Georgia DOT? Yes ___ No ___

Did this project encounter any lawsuits or judgments? Yes___ No___

Was this project performed under your current company name? Yes ___ No ___

Comments:

File details come from the government source that posted it. Updated .