This document is a bid tabulation for the OR42: MP1.06 & MP1.43 Culvert Replacement Rebid state and local contract opportunity. The project requires providing work zone traffic control, constructing temporary water management facilities, removing existing culverts and drainage facilities, furnishing and installing new culverts, constructing sloped end sections and paved culvert end slopes, constructing inlets, removing and reinstalling existing guardrail, furnishing and installing culvert drainage markers, and performing additional incidental work. The bid items, estimated quantities, and unit prices from three bidders (Mid Valley Excavation, LLC, Suulutaaaq, Inc., and K&B Quality Excavating, LLC) are provided, with the bid opening date listed as May 8, 2024 at 2:00 PM.
The bid prices range from $645,580.00 to $1,072,154.68 across the three bidders. The project is located in the state of Oregon. No additional information is provided regarding funding requirements, sources, or set-asides.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LandAcklnowledgArt RFQ.pdf | ||
| ATT A_PLANS~1.pdf | ||
| Attachment C_Bid Pricing Form R2.xlsx | XLSX spreadsheet | |
| Attachment C_Bid Pricing Form R.xlsx | XLSX spreadsheet | |
| ATT B_SPECIFICATIONS.pdf | ||
| Attachment D - Maintenance_Buy_America_Report_Form~1.xlsx | XLSX spreadsheet | |
| 00010163 ITB~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| S-73000-00010163 | May 8, 2024 2:00 PM | |||||
| PRELIMINARY RESULTS* | Mid Valley Excavation, LLC | Suulutaaaq, Inc. | K&B Quality Excavating, LLC | |||
| Bid Item # | Description | Est | ||||
| QTY | UNIT | UNIT | ||||
| PRICE | TOTAL | |||||
| PRICE | UNIT | |||||
| PRICE | TOTAL | |||||
| PRICE | UNIT | |||||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1.0 | LS | $ 90,517.50 | $90,517.50 | $ 65,000.00 | $65,000.00 | $ 56,300.00 | $56,300.00 |
| 2 | Temporary Work Zone Traffic Control Complete | 1.0 | LS | $ 91,000.00 | $91,000.00 | $ 45,000.00 | $45,000.00 | $ 148,698.00 | $148,698.00 |
| 3 | Portable Changeable Message Signs | 3.0 | EACH | $ 3,150.00 | $9,450.00 | $ 5,500.00 | $16,500.00 | $ 5,500.00 | $16,500.00 |
| 4 | Flaggers | 200.0 | HOUR | $ 96.00 | $19,200.00 | $ 91.00 | $18,200.00 | $ 83.00 | $16,600.00 |
| 5 | Flagger Station Lighting | 2.0 | EACH | $ 350.00 | $700.00 | $ 7,400.00 | $14,800.00 | $ 1,500.00 | $3,000.00 |
| 6 | Traffic Control Supervisor | 32.0 | WORK SHIFT | $ 285.00 | $9,120.00 | $ 1,200.00 | $38,400.00 | $ 1,850.00 | $59,200.00 |
| 7 | Pedestrian Transport Vehicle | 100.0 | HOUR | $ 100.00 | $10,000.00 | $ 150.00 | $15,000.00 | $ 95.00 | $9,500.00 |
| 8 | Temporary Water Management Facility at Station MP1.06 & MP1.43 | 1.0 | LS | $ 39,800.00 | $39,800.00 | $ 65,000.00 | $65,000.00 | $ 140,888.00 | $140,888.00 |
| 9 | Erosion Control | 1.0 | LS | $ 1,000.00 | $1,000.00 | $ 27,000.00 | $27,000.00 | $ 122,238.00 | $12,238.00 |
| 10 | Pollution Control Plan | 1.0 | LS | $ 1,500.00 | $1,500.00 | $ 11,000.00 | $11,000.00 | $ 8,500.00 | $8,500.00 |
| 11 | Construction Survey Work | 1.0 | LS | $ 6,000.00 | $6,000.00 | $ 11,000.00 | $11,000.00 | $ 7,800.00 | $7,800.00 |
| 12 | Removal of Inlets | 2.0 | EACH | $ 900.00 | $1,800.00 | $ 8,700.00 | $17,400.00 | $ 2,500.00 | $5,000.00 |
| 13 | Removal of Guardrail | 90.0 | FT | $ 70.00 | $6,300.00 | $ 24.00 | $2,160.00 | $ 27.75 | $2,497.50 |
| 14 | Removal and Delivery of Existing Steel Plates | 1 | LS | $ 1,275.00 | $1,275.00 | $ 5,000.00 | $5,000.00 | $ 6,050.00 | $6,050.00 |
| 15 | 18 Inch Culvert Pipe, 20 ft Depth | 55 | FT | $ 475.00 | $26,125.00 | $ 490.00 | $26,950.00 | $ 3,060.38 | $168,320.90 |
| 16 | 72 Inch Culvert Pipe, 20 ft Depth (Pipe Provided by ODOT) | 91 | FT | $ 825.00 | $75,075.00 | $ 910.00 | $82,810.00 | $ 3,296.98 | $300,025.18 |
| 17 | Coupling Band, 72 Inch CMP | 1 | EACH | $ 1,150.00 | $1,150.00 | $ 10,500.00 | $10,500.00 | $ 925.00 | $925.00 |
| 18 | Sloped end sections, 18 inch | 1 | EACH | $ 685.00 | $685.00 | $ 5,500.00 | $5,500.00 | $ 2,500.00 | $2,500.00 |
| 19 | Sloped end sections, 72 inch | 1 | EACH | $ 1,000.00 | $1,000.00 | $ 14,000.00 | $14,000.00 | $ 4,200.00 | $4,200.00 |
| 20 | Paved Culvert End Slopes | 223 | SQFT | $ 200.00 | $44,600.00 | $ 300.00 | $66,900.00 | $ 110.00 | $24,530.00 |
| 21 | Concrete inlets, Type G-2MA | 1 | EACH | $ 3,550.00 | $3,550.00 | $ 6,000.00 | $6,000.00 | $ 6,000.00 | $6,000.00 |
| 22 | Concrete inlets top, Type G-2MA | 1 | EACH | $ 3,400.00 | $3,400.00 | $ 12,000.00 | $12,000.00 | $ 4,500.00 | $4,500.00 |
| 23 | Concrete inlets top, Type D | 1 | EACH | $ 3,200.00 | $3,200.00 | $ 12,500.00 | $12,500.00 | $ 3,130.00 | $3,130.00 |
| 24 | Trench Resurfacing | 282 | SQYD | $ 525.00 | $148,207.50 | $ 215.00 | $60,694.50 | $ 127.00 | $35,852.10 |
| 25 | Guardrail, Type 2A | 90.0 | FT | $ 150.00 | $13,500.00 | $ 88.00 | $7,920.00 | $ 85.00 | $7,650.00 |
| 26 | Extra for 8 foot posts | 4.0 | EACH | $ 250.00 | $1,000.00 | $ 250.00 | $1,000.00 | $ 250.00 | $1,000.00 |
| 27 | Culvert Drainage Markers, Type 1 | 4 | EACH | $ 60.00 | $240.00 | $ 87.00 | $348.00 | $ 250.00 | $1,000.00 |
| 28 | Culvert Drainage markers, Type 2 | 3 | EACH | $ 225.00 | $675.00 | $ 145.00 | $435.00 | $ 250.00 | $750.00 |
| 29 | Thermoplastic, Sprayed, Surface, Non-Profiled | 400 | FT | $ 40.00 | $16,000.00 | $ 35.00 | $14,000.00 | $ 22.00 | $8,800.00 |
| 30 | Pavement Legend, Type B-HS: Arrows | 8 | EACH | $ 2,275.00 | $18,200.00 | $ 700.00 | $5,600.00 | $ 1,100.00 | $8,800.00 |
| 31 | Permanent Seeding | 0.2 | ACRES | $ 6,550.00 | $1,310.00 | $ 3,500.00 | $700.00 | $ 7,000.00 | $1,400.00 |
| TOTAL | $ 645,580.00 | $ 679,317.50 | $ 1,072,154.68 | ||||||
| *Preliminary Results are not an indicator of Award |