Preliminary Results~69.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
OR42: MP1. 06 & MP1. 43 Culvert Replacement Rebid
Solicitation number
S-73000-00010163
Issued by
Columbia County, Oregon

About this file

This document is a bid tabulation for the OR42: MP1.06 & MP1.43 Culvert Replacement Rebid state and local contract opportunity. The project requires providing work zone traffic control, constructing temporary water management facilities, removing existing culverts and drainage facilities, furnishing and installing new culverts, constructing sloped end sections and paved culvert end slopes, constructing inlets, removing and reinstalling existing guardrail, furnishing and installing culvert drainage markers, and performing additional incidental work. The bid items, estimated quantities, and unit prices from three bidders (Mid Valley Excavation, LLC, Suulutaaaq, Inc., and K&B Quality Excavating, LLC) are provided, with the bid opening date listed as May 8, 2024 at 2:00 PM.

The bid prices range from $645,580.00 to $1,072,154.68 across the three bidders. The project is located in the state of Oregon. No additional information is provided regarding funding requirements, sources, or set-asides.

View the file

Other files

File Type Posted
LandAcklnowledgArt RFQ.pdf PDF
ATT A_PLANS~1.pdf PDF
Attachment C_Bid Pricing Form R2.xlsx XLSX spreadsheet
Attachment C_Bid Pricing Form R.xlsx XLSX spreadsheet
ATT B_SPECIFICATIONS.pdf PDF
Attachment D - Maintenance_Buy_America_Report_Form~1.xlsx XLSX spreadsheet
00010163 ITB~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

S-73000-00010163May 8, 2024 2:00 PM
PRELIMINARY RESULTS*Mid Valley Excavation, LLCSuulutaaaq, Inc.K&B Quality Excavating, LLC
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1Mobilization1.0LS$ 90,517.50$90,517.50$ 65,000.00$65,000.00$ 56,300.00$56,300.00
2Temporary Work Zone Traffic Control Complete1.0LS$ 91,000.00$91,000.00$ 45,000.00$45,000.00$ 148,698.00$148,698.00
3Portable Changeable Message Signs3.0EACH$ 3,150.00$9,450.00$ 5,500.00$16,500.00$ 5,500.00$16,500.00
4Flaggers200.0HOUR$ 96.00$19,200.00$ 91.00$18,200.00$ 83.00$16,600.00
5Flagger Station Lighting2.0EACH$ 350.00$700.00$ 7,400.00$14,800.00$ 1,500.00$3,000.00
6Traffic Control Supervisor32.0WORK SHIFT$ 285.00$9,120.00$ 1,200.00$38,400.00$ 1,850.00$59,200.00
7Pedestrian Transport Vehicle100.0HOUR$ 100.00$10,000.00$ 150.00$15,000.00$ 95.00$9,500.00
8Temporary Water Management Facility at Station MP1.06 & MP1.431.0LS$ 39,800.00$39,800.00$ 65,000.00$65,000.00$ 140,888.00$140,888.00
9Erosion Control1.0LS$ 1,000.00$1,000.00$ 27,000.00$27,000.00$ 122,238.00$12,238.00
10Pollution Control Plan1.0LS$ 1,500.00$1,500.00$ 11,000.00$11,000.00$ 8,500.00$8,500.00
11Construction Survey Work1.0LS$ 6,000.00$6,000.00$ 11,000.00$11,000.00$ 7,800.00$7,800.00
12Removal of Inlets2.0EACH$ 900.00$1,800.00$ 8,700.00$17,400.00$ 2,500.00$5,000.00
13Removal of Guardrail90.0FT$ 70.00$6,300.00$ 24.00$2,160.00$ 27.75$2,497.50
14Removal and Delivery of Existing Steel Plates1LS$ 1,275.00$1,275.00$ 5,000.00$5,000.00$ 6,050.00$6,050.00
1518 Inch Culvert Pipe, 20 ft Depth55FT$ 475.00$26,125.00$ 490.00$26,950.00$ 3,060.38$168,320.90
1672 Inch Culvert Pipe, 20 ft Depth (Pipe Provided by ODOT)91FT$ 825.00$75,075.00$ 910.00$82,810.00$ 3,296.98$300,025.18
17Coupling Band, 72 Inch CMP1EACH$ 1,150.00$1,150.00$ 10,500.00$10,500.00$ 925.00$925.00
18Sloped end sections, 18 inch1EACH$ 685.00$685.00$ 5,500.00$5,500.00$ 2,500.00$2,500.00
19Sloped end sections, 72 inch1EACH$ 1,000.00$1,000.00$ 14,000.00$14,000.00$ 4,200.00$4,200.00
20Paved Culvert End Slopes223SQFT$ 200.00$44,600.00$ 300.00$66,900.00$ 110.00$24,530.00
21Concrete inlets, Type G-2MA1EACH$ 3,550.00$3,550.00$ 6,000.00$6,000.00$ 6,000.00$6,000.00
22Concrete inlets top, Type G-2MA1EACH$ 3,400.00$3,400.00$ 12,000.00$12,000.00$ 4,500.00$4,500.00
23Concrete inlets top, Type D1EACH$ 3,200.00$3,200.00$ 12,500.00$12,500.00$ 3,130.00$3,130.00
24Trench Resurfacing282SQYD$ 525.00$148,207.50$ 215.00$60,694.50$ 127.00$35,852.10
25Guardrail, Type 2A90.0FT$ 150.00$13,500.00$ 88.00$7,920.00$ 85.00$7,650.00
26Extra for 8 foot posts4.0EACH$ 250.00$1,000.00$ 250.00$1,000.00$ 250.00$1,000.00
27Culvert Drainage Markers, Type 14EACH$ 60.00$240.00$ 87.00$348.00$ 250.00$1,000.00
28Culvert Drainage markers, Type 23EACH$ 225.00$675.00$ 145.00$435.00$ 250.00$750.00
29Thermoplastic, Sprayed, Surface, Non-Profiled400FT$ 40.00$16,000.00$ 35.00$14,000.00$ 22.00$8,800.00
30Pavement Legend, Type B-HS: Arrows8EACH$ 2,275.00$18,200.00$ 700.00$5,600.00$ 1,100.00$8,800.00
31Permanent Seeding0.2ACRES$ 6,550.00$1,310.00$ 3,500.00$700.00$ 7,000.00$1,400.00
TOTAL$ 645,580.00$ 679,317.50$ 1,072,154.68
*Preliminary Results are not an indicator of Award

Sheet2