ATT B_SPECIFICATIONS.pdf
PDF 2 MB Posted
- Solicitation number
- S-73000-00010163
- Issued by
- Columbia County, Oregon
About this file
This document is a set of Special Provisions for the OR42: MP 1.06 & MP 1.43 Culvert Replacement Project in Oregon. The work consists of providing work zone traffic control, constructing temporary water management facilities, removing existing culverts and other drainage facilities, furnishing and installing new culverts, constructing sloped end sections and paved culvert end slopes, constructing inlets, removing and reinstalling existing guardrail, and furnishing and installing culvert drainage markers. The project has an in-water work period from July 1 to September 15. The estimated quantity of temporary water management facilities includes 275 feet of pipe, 250 square yards of plastic sheeting, 4 pumps, and 1,500 sandbags.
The document outlines various technical specifications and requirements, including sections on mobilization, accommodations for public traffic, work zone traffic control, temporary traffic channelizing devices, temporary pavement markings, temporary roadside barriers and impact attenuators, temporary water management, erosion and sediment control, and environmental protection measures. Turbidity monitoring is required during in-water work, and the contractor must follow an Inadvertent Discovery Plan for cultural resources. Payment items include Temporary Water Management Facility and Turbidity Monitoring.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Preliminary Results~69.xlsx | XLSX spreadsheet | |
| LandAcklnowledgArt RFQ.pdf | ||
| ATT A_PLANS~1.pdf | ||
| Attachment C_Bid Pricing Form R2.xlsx | XLSX spreadsheet | |
| Attachment C_Bid Pricing Form R.xlsx | XLSX spreadsheet | |
| Attachment D - Maintenance_Buy_America_Report_Form~1.xlsx | XLSX spreadsheet | |
| 00010163 ITB~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR42: MP 1.06 & MP 1.43 CULVERT REPLACEMENT PROJECT
ATTACHMENT A
SPECIAL PROVISIONS & SPECIFICATIONS FOR
SCOPE
The work to be done under this Contract, on the Coos Bay – Roseburg Highway (OR42) at MP
1.06 & MP 1.43, consists of supplying the materials, equipment, labor and incidentals required to perform the following tasks as described in the Contract plans and specifications:
Provide Work Zone Traffic Control.
Construct Temporary Water Management Facilities.
Remove existing culverts and other drainage facilities.
Furnish and install new culverts.
Construct sloped end sections and paved culvert end slopes.
Construct inlets.
Construct Trench Resurfacing.
Remove and reinstall existing guardrail.
Furnish and install culvert drainage markers.
Perform additional and incidental work as called for by the contract plans, specifications and as directed.
PROJECT INFORMATION
General information pertaining to this project may be obtained from the following:
Jessica Spann, Project Manager 307 Highway 42 Coquille, OR 97423 Phone (541) 396-1143 Email: Jessica.Spann@odot.oregon.gov
APPLICABLE STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS
Silence of Specifications: The apparent silence of the specifications as to any detail, or the apparent omission of a detailed description concerning any point, shall be regarded as meaning that the highest value commercial practices are to prevail and that only materials and workmanship of first quality are to be used.
2024.01.29 13:01:27-08'00'
Date: 2024.01.29 14:54:30-08'00'
Date: 2024.01.31 13:16:33-08'00'
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications modified as follows:
Construction
00210.40 Mobilization – delete the last bullet of the bullet list. Obtaining and maintaining access to Doc Express®, and using Doc Express® to submit documents will not be required on this project.
Payment
00210.90 Payment – delete the last sentence in this subsection.
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
Comply with Section 00220 of the Standard Specifications modified as follows:
00220.02(b) Temporary Pedestrian Accessible Route Plan - Add the following bullet to the end of the bullet list:
Provide transportation for pedestrians and bicyclists through the active Work Area according to Section 00223. Post a “Wait For Assistance” sign with a custom “Call XXX-XXX-XXXX For Pedestrian Transport Vehicle” sign at the beginning of the work zone on all public roads.
00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:
Traffic Lanes may be closed on the Coos Bay – Roseburg Highway (OR42) when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):
Single Lane Closures – One Traffic Lane in each direction on the Coos Bay – Roseburg Highway (OR42) may be closed at all times between MP 0.5 and MP 2.5.
SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL
Comply with Section 00221 of the Standard Specifications modified as follows:
00221.06 Traffic Control Plan - Replace this subsection with the following subsection:
00221.06 Traffic Control Plan and Tourist-Oriented Directional and Business Logo Signs –
(a) Traffic Control Plan - Submit one of the following, 5 Calendar Days before the preconstruction conference:
(1) Agency Traffic Control Plan - If the Contractor intends to use the Agency TCP without modification, a written notification indicating that the Agency TCP will be used without modification.
(2) Contractor-Modified Traffic Control Plan - The Contractor may request to use a Contractor-modified Agency TCP, or a TCP developed by the Contractor. Do not use a modified TCP, or a TCP developed by the Contractor, unless approved by the Engineer.
Use the Agency TCP unless a modified TCP, or a TCP developed by the Contractor is accepted.
The Engineer is not obligated to consider any modified Agency TCP or a TCP developed by the Contractor. The Agency will not be liable to the Contractor for failure to accept or act upon any request for a modified Agency TCP or a TCP developed by the Contractor.
To conserve time and funds, the Contractor may first submit a written request for a preliminary review by the Engineer. The request should contain a description of the proposal together with a rough estimate of anticipated dollar and time impacts. The Engineer will, within a reasonable time, respond to the Contractor in writing whether or not the request would be considered by the Agency.
If requesting a Contractor-modified Agency TCP, or a TCP developed by the Contractor, at a minimum the request shall meet all requirements of the Contract documents and comply with the Project transportation management plan (TMP). Provide the following information:
Stamped Working Drawings according to 00150.35 that include the proposed TCP showing all TCM and quantities of TCD.
A TPAR plan that includes:
o Details and features used to provide pedestrian accessibility.
o Pedestrian staging Plans at a scale no smaller than 1 inch = 50 feet.
o Temporary alternate facilities or detour routes for pedestrian traffic.
Staging sequences and details for Work affecting vehicular, pedestrian, and bicycle traffic.
Proposed order and duration of the TCM.
A detailed temporary striping plan.
If the Contractor’s request to use a Contractor-modified Agency TCP, or a TCP developed by the Contractor is approved in whole or in part, acceptance will be made by a Change Order.
The Engineer will establish prices that represent a fair measure of the value of Work to be added, changed, or deleted as a result of any accepted modifications to the Agency TCP or an accepted TCP developed by the Contractor.
Once a TCP has been accepted by the Engineer, any additional modifications must be submitted by the Contractor for Agency review following the procedure described above.
The Engineer is not obligated to consider additional modifications to a previously approved TCP.
(b) Tourist-Oriented Directional and Business Logo Signs - Submit one of the following for approval, at least 5 Calendar Days before the preconstruction conference:
(1) No Signs - If there are no tourist-oriented directional (TOD) or business logo signs on the Project, a written notification that no TOD or business logo signs exist within the Project limits or
(2) Signs - Submit one copy of a sketch map of the Project showing all existing TOD and business logo signs and a written narrative describing how these signs will be kept in service and protected throughout all the construction stages. If modifications are necessary, submit updated information to the Engineer for approval at least 21 Calendar Days before the change is needed.
SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS
Comply with Section 00222 of the Standard Specifications modified as follows:
Place a “PEDESTRIANS ON ROADWAY” (CW11-2) sign at the beginning of each end of the Work Area, facing incoming traffic as shown, or as directed.
Install a 54-inch "TRUCKS LEAVING HIGHWAY XXXX FT" sign in advance of each entrance point to the Work Area at sign spacing “A” from the “TCD Spacing Table” shown on the Standard Drawings. Install a 54-inch "TRUCKS ENTERING HIGHWAY XXXX FT" sign in advance of each exit point from the Work Area at sign spacing “A” from the “TCD Spacing Table” shown on the Standard Drawings.
Install "ROAD WORK AHEAD" (W20-1-48) signs with a 36 by 24-inch "FINES
DOUBLE" (R2-6aP) rider on the Coos Bay - Roseburg Highway, according to the "TCD Spacing Table" shown on the Standard Drawings or as modified by the Plans except do not install the "FINES DOUBLE" rider on concrete barrier mounted signs.
Install beyond each end of the Project, facing outgoing traffic, an "END ROAD WORK"
(CG20-2A-24) sign a distance of (A ÷ 2) according to the "TCD Spacing Table" shown on the Standard Drawings or as modified by the Plans.
When the horizontal clearance for the Roadway is less than 19 feet, install horizontal clearance (CW21-12-48) signs, identifying the narrowest width of the Roadway. Locate these horizontal clearance signs as shown or as directed.
Install two sign flag boards, as shown on the Standard Drawings, above the following detour and road closed advance warning signs, where applicable:
o "DETOUR AHEAD", "DETOUR XXXX FT", "DETOUR X/X MILE" (W20-2) signs.
o "ROAD CLOSED AHEAD", "ROAD CLOSED XXXX FT", "ROAD CLOSED X/X MILE" (W20-3) signs.
Install a "Bicycle ON ROADWAY” (CW11-1) symbol sign and a 24 by 18-inch "NEXT
XX MILES" (W7-3aP) plaque according to "Sign Spacing A", from the "TRAFFIC CONTROL DEVICES SPACING TABLE" shown on the Standard Drawings, after the "ROAD WORK AHEAD" sign. Install a “Bicycle ON ROADWAY” symbol sign on 1 mile spacing through the affected area. Keep the signs in place until completion of the Shoulder or bikeway final surface.
During culvert replacement operations on the Coos Bay - Roseburg Highway, install temporary signing and other required TCD as shown. Install temporary speed zone signing according to and as shown in the Temporary Speed Zone Order.
Add the following subsection:
00222.40(f) Temporary Speed Zone Reduction - Install a temporary regulatory speed zone, as directed. Use regulatory signs for all required temporary speed zone signage.
00222.80(a) Area Basis - Add the following sentence to the end of this subsection:
Temporary signing quantities include temporary regulatory speed zone signage.
Add the following to the end of this subsection:
No separate or additional payment will be made for furnishing, installing, and maintaining 72 by 24-inch "CONSTRUCTION VEHICLE DO NOT FOLLOW" (CW23-14) signs. Payment will be included in 00221.90(b).
SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES
Comply with Section 00223 of the Standard Specifications modified as follows:
00223.26 Pedestrian Transport Vehicle - Add the following bullet:
A commercially available bicycle rack capable of securely carrying a minimum of three bicycles. Do not loosely load bicycles onto the pedestrian transport vehicle.
00223.31(a) Traffic Control Supervisor - Add the following paragraph and bullets to the end of this subsection:
The TCS shall be available and on site at all times that a temporary regulatory speed zone reduction is in effect for the culvert replacement operations. In addition to the duties listed in this subsection, the TCS duties also include the following:
Inspect temporary TCD used during culvert replacement operations immediately following initial placement or installation of TCD. Inspect TCD at least one additional time during each construction work shift.
When law enforcement will be providing enforcement services for the Project, coordinate and communicate work locations and schedules with the Engineer and law enforcement agency before and during each work shift.
Replace the paragraph that begins “Item (e) includes…” with the following paragraph:
Item (e) includes fully operated pedestrian transport vehicles, two-way radios, the “CONSTRUCTION VEHICLE DO NOT FOLLOW” sign, the ADA-pedestrian loading/unloading mechanism, the bicycle rack, and the rotating amber lights or strobe lights mounted on each vehicle.
SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES
Comply with Section 00224 of the Standard Specifications.
SECTION 00225 - TEMPORARY PAVEMENT MARKINGS
Comply with Section 00225 of the Standard Specifications.
SECTION 00226 - TEMPORARY ROADSIDE BARRIERS AND IMPACT ATTENUATORS
Comply with Section 00226 of the Standard Specifications modified as follows:
00226.80(b)(2) Temporary Barrier - Add the following to the end this subsection:
The quantities will be limited to those shown in Table 00226-1. The estimated quantity of Temporary Barrier is:
TABLE 00226-1
Stage/Phase Location (STA to STA)
Temporary Barrier (foot)
Temporary Barrier, Minimum Deflection
(foot) Stage I/ Phase 1 337+50 to 339+70 113 4
SECTION 00245 - TEMPORARY WATER MANAGEMENT
Section 00245, which is not a Standard Specification, is included in this Project by Special Provision.
Description
00245.00 Scope - This Work consists of furnishing, installing, operating, maintaining, and removing temporary water management facilities in regulated Work areas.
HWYE30Y
Highlight
00245.01 Abbreviations:
TWM - Temporary Water Management TWMF - Temporary Water Management Facility TWMP - Temporary Water Management Plan
00245.02 Definitions:
Temporary Water Management Facility - A TWMF that conveys water around or through Work areas, removes water from Work areas, and treats and discharges water at locations outside Work areas.
00245.03 Temporary Water Management Plan - The Agency TWMP is a concept plan.
28 Calendar Days before beginning work in regulated Work areas, submit stamped Working Drawings of a Contractor-developed TWMP, according to 00150.35, based on either the Agency’s concept plan or an independent plan that meets water quality and environmental guideline requirements and does not negatively affect neighboring properties or water rights.
Include the following minimum information in the TWMP:
The sequence and schedule for dewatering and re-watering. This sequence and schedule must include when to contact the Engineer prior to dewatering and re-watering.
How the Work area is isolated from the active stream flow upstream, through, and downstream.
How the stream flow is routed and conveyed around or through the isolated Work area.
How fish passage is provided around the Work area, if required.
How the isolated Work area is de-watered.
How the pumped water is treated, if necessary, before it is discharged downstream.
Description of all construction stages, including appropriate contact points for each stage.
A list of on-site backup Materials and Equipment.
Provide the name of the TWM Subcontractor (if applicable) and Contractor’s superintendent, and their 24-hour contact phone number 10 Days before the pre-Work meeting. If changes in the appointment of the TWM Subcontractor or Contractor’s superintendent occur during the term of the Contract, provide written notice to the Engineer within 5 Calendar Days of the change.
Calculations of water withdraw pump’s capacity.
Details of the proposed water intake screen used to isolate in-water Work area and how it meets the requirements of 00290.34(c)(3).
Any change to the TWMP during construction requires approval prior to implementation.
Obtain the Engineer's written approval before beginning Work in in-water Work areas.
00245.04 Pre-Work Meeting - Before beginning any TWM Work, attend a pre-work meeting at the Project Site with the Engineer no more than 8 Calendar Days prior to implementation of TWM.
Required meeting attendees include:
Engineer
Contractor
TWM Subcontractor (if applicable)
Agency Environmental Coordinator or their appointed representative
The pre-Work meeting agenda typically includes the method of TWM, the TWMP, fish salvage plan and strategy, describe environmental risks, turbidity monitoring, energy dissipation, dewatering and re-watering plan and strategy, site clean-up expectations, and the circumstances under which contacting the Engineer is required.
Materials
00245.10 Materials - Furnish Materials meeting the following requirements:
Pipe ....................................................................... 00445.11 Plastic Sheeting ................................................ 00280.14(a) Sandbags ......................................................... 00280.15(a)
Furnish pumps that are:
Self-priming.
Equipped with a variable speed governor.
Equipped with a power source.
Able to pump water that contains soft and hard solid.
Construction
00245.40 Fish Removal - Qualified Agency, ODFW, or ODOT consultant biologists will remove fish and other aquatic organisms from the isolation Work areas. Coordinate fish removal with the Engineer at least 28 Calendar Days before beginning Work in regulated Work areas. Allow access into the isolation Work areas before, during and after installation of the TWMF to perform the specified tasks as follows:
Before Installation of TWMF - Before any in-water Work, including installing TWMF, qualified personnel will remove fish and other native aquatic organisms from within the proposed isolated Work area.
After Installation of TWMF - After installing TWMF and the reduction of the water level through the isolated Work area has begun, qualified personnel will remove all fish and aquatic organisms as the water level is reduced. Do not completely de-water the isolation area until all fish and aquatic organisms have been removed.
00245.41 Installation - During installation of the temporary water management facility, maintain a downstream water flow rate of at least 50 percent of the upstream water flow rate.
00245.42 Operation - Operate temporary water management as follows:
Protect fish and fish habitat according to 00290.34.
Maintain and control water flow downstream of the isolated Work area for the duration of the diversion to prevent downstream de-watering.
Clean, maintain and repair water intake screening to ensure adequate flows and protection of aquatic organisms.
In the event of containment failure immediately notify the Engineer so arrangements can be made to remove fish and aquatic organisms from the isolation Work areas prior to the continuation of Work within the ordinary high water limits.
When using a pump for bypassing water during temporary water management, physically monitor the pump in-person and maintain the pump at all times including non-work hours. Provide a back-up pump on-site and ready for use as necessary.
Provide the Engineer with a daily report documenting monitoring activities.
Maintenance
00245.60 Maintenance - Monitor water turbidity according to 00290.30(a)(8).
Finishing and Cleaning Up
00245.70 Removal - Prior to removal of the TWMF, obtain approval from the Engineer after completion of all Work within ordinary high water limits. Remove the TWMF and re-water and restore the stream flow. Maintain downstream water flow during removal of the facility. Staged or metered re-watering may be required and will be determined by the Engineer.
Measurement
00245.80 Measurement - No measurement of quantities will be made for temporary water management facilities.
The estimated quantities of Materials required for the temporary water management facility are:
Temporary Water Management Facility at MP 1.06 & MP 1.43:
Pipe ................................................................. _275__ Feet Plastic Sheeting ..................................._250__ Square Yard Pumps ............................................................ ___4__ Each Sandbags ....................................................... _1500_ Each
Turbidity monitoring will be measured according to 00290.80.
Payment
00245.90 Payment - The accepted quantities of temporary water management facilities will be paid for at the Contract lump sum amount for the item "Temporary Water Management Facility at Station MP1.06 & MP 1.43”.
The location of the facility will be inserted in the blank.
Payment will be payment in full for furnishing and placing all Materials, and for furnishing all Equipment, labor, and Incidentals necessary to complete the Work as specified.
Turbidity monitoring will be paid for according to 00290.90.
No separate or additional payment will be made for TWMP, maintaining, operating, monitoring, moving, or removing the facility.
SECTION 00280 - EROSION AND SEDIMENT CONTROL
Comply with Section 00280 of the Standard Specifications modified as follows:
The Agency's NPDES 1200-CA Permit is applicable to the Project.
00280.16(d) Inlet Protection – Replace the bullet that begins “Type 3: Prefabricated Filter Inserts …” with the following bullet:
Type 3: Prefabricated Filter Inserts - Prefabricated filter inserts manufactured specifically for collecting sediment in drainage inlets and from the QPL. Include handles and fasteners sufficient to keep the insert from falling into the inlet during maintenance and removal of the insert from the inlet.
00280.16(i) Concrete Washout - Delete the bullet that begins “Geotextile - Type 2 drainage…”.
00280.62 Inspection and Monitoring - Replace this subsection, except for the subsection number and title, with the following:
Inspect the Project Site and all ESC devices for potential erosion or sediment movement on a weekly basis and when 1/2 inch or more of rainfall occurs within a 24-hour period, including weekends and holidays.
If a significant noncompliance or serious water quality issue occurs that could endanger health or the environment, verbally report it to the Engineer within 24 hours.
00280.90 Payment - Add the following to the end of this subsection:
In the paragraph that begins "Item (a) includes...” delete the bullet that specifies "providing the Erosion and Sediment Control Manager".
Replace the paragraph that begins "When only Item (a) is..." with the following paragraph:
When only item (a) is listed in the Contract Schedule of Items, additional ESC devices required for permit compliance will be paid for as Extra Work according to Section 00196.
SECTION 00290 - ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications modified as follows:
00290.10 Staging and Disposal Sites –
Replace the paragraph that begins "Locate staging areas and disposal…" with the following paragraphs:
Locate staging areas and disposal sites in previously improved or disturbed sites, including existing Roadways, pullouts, turnouts, parking lots, and storage yards that have been compacted, and graveled or paved unless otherwise specified in Section 00236 or Section 00237 or approved, in writing, by the Engineer, Do not stage Equipment, park Equipment or store Materials in any City, County, State, or Federal park, wayside or recreational facility.
00290.20(c)(1) General - Replace the paragraph that begins “Segregate all demolition debris according to…” with the following paragraph:
Segregate all demolition and construction debris according to its intended end use (reuse, recycle, or dispose). If required, store in designated areas in a manner that prevents contamination to Soil and water and prevents fugitive dust emissions. Remove all waste materials recovered from the site unless otherwise approved, in writing. Retain disposal and recycling facility receipts for wastes generated on site for at least 1 year after completion of the Project. Provide copies of the receipts to the Engineer within 7 Calendar Days of the disposal or recycling.
00290.20(c)(3) Reuse, Recycle and Dispose of Materials - Replace the title of this subsection with “Reuse, Recycle, Compost and Dispose of Materials”.
(3) Reuse, Recycle, Compost and Dispose of Materials – Replace the three bullets with the following bullets:
Reuse demolition and construction debris.
Recycle demolition and construction debris.
Compost or mulch yard waste material from lawn and landscape maintenance.
If it is not feasible to reuse, recycle, or compost, ("feasible" is defined as a facility that is capable of handling the material, will take the material and the cost of transportation plus the cost to reuse or recycle the material is equal to or less than the costs of disposal) dispose of waste material according to the following:
00290.30(a)(7) Water Quality:
Do not discharge contaminated or sediment-laden water, including drilling fluids and waste, or water contained within a work area isolation, directly into any waters of the State or U.S. until it has been satisfactorily treated (using a best management practice such as a filter, settlement pond, bio-bag, dirt-bag, or pumping to a vegetated upland location).
Implement containment measures adequate to prevent pollutants or construction and demolition materials, such as waste spoils, fuel or petroleum products, concrete cure water, silt, welding slag and grindings, concrete saw cutting by-products and sandblasting abrasives, from entering waters of the State or U.S.
Implement containment measures adequate to prevent flowing stream water from coming into contact with concrete or grout within the first 24 hours after placement.
Do not end-dump riprap into the waters of the State or U.S. Place riprap from above the ordinary high water line.
Cease Project operations under high flow conditions that may result in inundation of the Project area, except for efforts to avoid or minimize resource damage.
The Engineer retains the authority to temporarily halt or modify the Work in case of excessive turbidity or damage to natural resources.
If Work activities violate permit conditions or any requirement of this subsection, stop all in-water work activities and notify the Engineer.
Do not cause a visible sediment plume in waters of the State or U.S.
00290.30(a)(8) Meter Turbidity Monitoring - In addition to any turbidity monitoring required by 00280.62(c) to comply with NPDES 1200 series requirements, monitor turbidity using a turbidity meter every two hours during in-water work according to the following:
Use a turbidity meter that has been maintained and calibrated according to the manufacturer’s specifications.
Measure stream turbidity before beginning each day’s in-water work to establish pre-construction turbidity levels.
Measure upcurrent and downcurrent turbidity at two-hour intervals during in-water work and perform work based on turbidity measurements according to the following:
Take upcurrent samples at a location representative of background turbidity approximately 100 feet from the in-water work area.
Take downcurrent samples at a location approximately 100 feet from the in-water work area at approximately mid-depth of the water body and within any visible turbidity plume.
If the downcurrent reading is less than 5 nephelometric turbidity units (NTU) higher than the upcurrent reading, continue to work and take readings every two hours.
If the downcurrent reading is greater than or equal to 5 and less than 30 NTU higher than the upcurrent reading, modify work procedures and repair or implement best management practices (BMP), continue work, and continue to take readings every two hours. If after four hours the downcurrent reading is still greater than or equal to 5 NTU higher than the upcurrent reading, stop all in-water work and repair or implement additional BMP. Resume in-water work activities only after the downcurrent reading is less than 5 NTU above the upcurrent reading.
If the downcurrent reading is greater than or equal to 30 and less than 50 NTU higher than the upcurrent reading, modify work procedures, repair or implement BMP and continue work. If, at the subsequent two-hour reading, the downcurrent reading is still more than 30 NTU higher than the upcurrent reading, stop all in-water work and repair or implement additional BMP. Resume in-water work activities only after the downcurrent reading is less than 5 NTU above the upcurrent NTU reading.
If the downcurrent reading is 50 NTU or more higher than the upcurrent reading, stop all in-water work, repair or implement additional BMP, and inform the Agency. Resume in-water work activities only after the downcurrent reading is less than 5 NTU above the upcurrent NTU, as determined by continued readings made at least every two hours, or the next day's initial turbidity reading.
Document all turbidity monitoring observations on form 734-2755, “Turbidity Monitoring Report”, or another form approved by the Agency. Submit reports to the Engineer weekly during in-water work and keep copies of the reports at the Project Site.
00290.30(b) Pollution Control Plan - Replace the paragraph that begins “Develop and submit a PCP…” with the following:
Develop a PCP using ODOT Form 734-2445 and submit it for approval at least 10 Calendar Days before the preconstruction conference. Maintain a copy of the PCP on-site at all times during construction activities, readily available to employees and Inspectors. Ensure that all employees comply with the provisions of the PCP.
Delete the paragraph that begins “A Pollution Control Plan…”.
00290.34 Protection of Fish and Fish Habitat - Add the following paragraph:
Meet with the Agency Biologist, Resource Representative, Project Manager, and inspector on site, before moving equipment on-site or beginning any work, to ensure that all parties understand the locations of sensitive biological sites and the measures that are required to be taken to protect them.
00290.34(a) Regulated Work Areas - Add the following to the end of this subsection:
For the M.P. 1.06 culvert, the regulated work area is the area at or below 10 feet elevation and between stations H 9+99.0 and H 11+73.0.
For the M.P. 1.43 culvert, the regulated work area is the area at or below the ordinary high water (OHW) elevation shown on the plans.
Perform work within the regulated work area only during the in-water work period. The in-water work period is from July 1 to Sept 15.
The total volume of material filled or discharged into waters of the state and waters of the U.S.
shall not exceed 1,450 cubic yards.
Submit a schedule to complete all work within the regulated work area within the in-water work period at least 10 days prior to the preconstruction conference.
00290.34(b) Prohibited Operations - Replace this subsection, except for the subsection number and title, with the following:
Except where allowed by the Contract or by permit, do not:
Blast underwater.
Use water jetting.
Release petroleum products or chemicals in the water.
Disturb spawning beds.
Obstruct stream channels.
Cause silting or sedimentation of waters of the State or waters of the U.S.
Use treated timbers within the regulated work area.
Impede adult and juvenile fish passage, including intermittent streams.
00290.34(c) Aquatic Species Protection Measures Required by Environmental Permits:
(1) General Requirements:
Do not install fish ladders (for example: pool and weirs, vertical slots, fishways) or fish trapping systems.
Do not apply surface fertilizer within 50 feet of any stream channel.
Use heavy equipment as follows:
Choice of equipment must have the least adverse effects on the environment (for example: minimally sized, low ground pressure).
Secure absorbent material around all stationary power equipment ( for example:
generators, cranes, drilling equipment) operated within 150 feet of wetlands, waters of the State, waters of the U. S., drainage ditches, or water quality facilities to prevent leaks, unless suitable containment is provided to prevent spills from entering waters of the state or waters of the U.S.
Do not cross directly through a stream for construction access, unless shown or approved. If shown or approved, cross perpendicular to the stream and do not block stream flow. When a crossing is no longer needed, completely remove the crossing and restore the soils and vegetation to the original condition.
Store fuel and maintain all equipment in staging areas that are at least 150 feet away from any waters of the State, waters of the U.S., or storm inlet or on an impervious surface that is isolated from any waters of the State, waters of the U.S., or storm inlet.
If temporary access roads are needed within 150 feet of any body of water, use existing routes unless new routes are shown or approved.
Before beginning work on temporary access routes that are not shown, submit a proposal to the Engineer for approval.
(2) Work Area Isolation - Provide work isolation according to Section 00245. Provide safe passage around or through the isolated work area for adult and juvenile migratory fish unless passage did not previously exist.
(3) Water Intake Screening - Install, operate, and maintain fish screens on each water intake used for project construction, including pumps used to isolate an in-water work area. When drawing or pumping water from any stream, protect fish by equipping intakes with screens having a minimum 27% open area and meeting the following requirements:
Perforated plate openings shall be 3/32 inch or smaller.
Mesh or woven wire screen openings shall be 3/32 inch or smaller in the narrowest direction.
Profile bar screen or wedge wire openings shall be 1/16 inch or smaller in the narrow direction.
Choose size and position of screens to meet the following criteria:
Type Approach Velocity 1 (Ft./Sec.)
Sweeping Velocity 2 (Ft./Sec.)
Wetted Area of Screen (Sq. Ft.)
Comments
Ditch Screen ≤ 0.4 Shall exceed approach velocity
Divide max. water flow rate (cfs) by
0.4 fps
If screen is longer than 4 feet, angle 45° or less to stream flow
Screen with proven self-cleaning system
≤ 0.4 – Divide max. water flow rate (cfs) by
0.4 fps
Screen with no cleaning system other than manual
≤ 0.2 – Divide max. water flow rate (cfs) by
0.2 fps
Pump rate 1 cfs or less
1 Velocity perpendicular to screen face at a distance of approximately 3 inches 2 Velocity parallel to screen
Provide ditch screens with a bypass system to transport fish safely and rapidly back to the stream.
(5) Site Restoration - Restore damaged streambanks to a natural slope, pattern, and profile suitable for establishment of permanent woody vegetation unless precluded by pre-project conditions (for example: natural rock substrate):
Stabilize all disturbed soils, including obliteration of temporary access roads, following any break in work unless construction will resume in 4 Calendar Days.
(6) Surface Water Diversions - Surface water may be diverted to meet construction needs other than work area isolation, consistent with Oregon law, only if water from sources that are already developed, such as municipal supplies, small ponds, reservoirs, or tank trucks, is unavailable or inadequate, and meeting the following conditions:
When alternative surface sources are available, divert from the stream with the greatest flow.
Install, operate, and maintain a temporary fish screen.
Do not exceed a pumping rate and volume of 10% of the available flow. For streams with less than 5 cubic feet per second, do not exceed drafting of 18,000 gallons per day. Do not use more than one pump for each site.
(9) Treated Wood - Treated wood includes any wood treated with any pesticide or wood preservatives. Do not use lumber, pilings, or other wood products that are treated or preserved with pesticidal compounds below the ordinary high water (OHW) or as part of an in-water or over-water structure, except as described below:
Store treated wood shipped to the Project out of contact with standing water and wet soil, and protected from precipitation.
Visually inspect each load and piece of treated wood. Reject for use in or above aquatic environments if visible residues, bleeding of preservative, preservative-saturated sawdust, contaminated soil, or other matter is present.
Use pre-fabrication to the extent feasible. When field fabrication is necessary, all cutting and drilling of treated wood, and field preservative treatment of wood exposed by cutting and drilling, shall occur above the OHW. Use tarps, plastic tubs, or similar devices to contain the bulk of any fabrication debris, and wipe off any excess field preservative.
All treated wood structures, including pilings, shall have design features to avoid or minimize impacts and abrasion by livestock, pedestrians, vehicles, vessels, and floats.
Treated wood may be used to construct a bridge, over-water structure or an in-water structure, with the exception of the work containment system, provided that all surfaces exposed to leaching by precipitation, overtopping waves, or submersion are coated with a water-proof seal or barrier are maintained. Apply and contain coatings and paint-on field treatment to prevent contamination. Surfaces that are not exposed to precipitation or wave attack, such as parts of a timber bridge completely covered by the bridge deck, are exempt from this requirement.
During demolition of treated wood, ensure that no treated wood debris falls into the water. If treated wood debris does fall into the water, remove it immediately.
Store removed treated wood debris in appropriate dry storage areas, at least 150 feet away from the regulated work area.
(13) Temporary Power, Communication and Water Lines - Before installing temporary power, communication, or water lines across streams or bodies of water, submit a proposed plan to the Engineer for approval. Do not begin installation before receiving approval from the
Engineer. Proposed plans for installation of temporary power, communication, and water lines and stream crossings shall utilize the following design methods in the listed order of priority:
1. Aerial lines, including lines hung from existing bridges.
2. Directional drilling, boring and jacking that spans the channel migration zone and any associated wetland.
3. Trenching, which is restricted to intermittent streams and may only be used when the stream is naturally dry. For all sections of trenches below the ordinary high water line, backfill with native material and cap with clean gravel suitable for fish use in the project area.
Align each crossing as perpendicular to the watercourse as possible. For drilled, bored, or jacked crossings, ensure that the line is below the total scour prism. Return any large wood displaced by trenching or plowing as nearly as possible to its original position, or otherwise arranged to restore habitat functions.
(14) Injured Fish Notification - If a dead or injured fish is found in the project area, immediately notify the Agency. If the injured fish is in a location where further injury or stress may take place, attempt to move the fish to a safer location, if one is available, near the capture site while keeping the fish in the water and reducing its stress as much as possible. Do not disturb the fish after it has been moved. If the fish is dead or dies while being captured or moved, save the fish and any tags. The Agency will notify appropriate regulatory agencies about the injured or dead fish and provide additional direction to the Contractor.
00290.51 Protection of Sensitive Cultural Sites - Add the following to the end of this subsection:
There are no known sensitive cultural sites on this Project. However, this is a potentially high probability area for cultural resources. Thus, an Inadvertent Discovery Plan (IDP) has been developed for this project and is included below. Please be sure to keep this IDP at the project site during construction.
Inadvertent Discovery Plan for Cultural Resources
OR42: MP 1.06 & MP 1.43 Culvert ODOT Key Number N/A
Project Description: ODOT is replacing the culvert at MP 1.06 & MP 1.43 on OR42.
The goals of this IDP are to outline appropriate communication and protocol, to minimize construction delays and costs when cultural resources are discovered inadvertently during project construction, and to ensure compliance with local, state, and federal cultural resources laws.
The Inadvertent Discovery Plan (IDP) shall be followed if cultural material, including human remains, are encountered during construction. In addition, please refer to SPECs 290.50 & 290.51.
Protocol for coordination in the event of inadvertent discovery:
In the event of an inadvertent discovery of possible archaeological materials, all work will stop immediately in the vicinity of the find.
The area will be secured and protected.
The ODOT REC, Archaeologist, and lead Inspector will be notified. ODOT Archaeologist or REC will notify the State Historic Preservation Office (SHPO). If possible human remains are encountered, the Oregon State Police, Commission on Indian Services (CIS), SHPO, and Tribes will also be notified.
Oregon State Police: Craig Heuberger 503-508-0779
CIS: Daniel Santos 503-986-1067
SHPO: Hurt Roedel 503-986-0674
No work may resume until ODOT Archaeology staff are on-site and able to assess the situation.
If human remains are encountered, do not disturb them in any way. Do not call 911. Do not speak with the media. Secure the location. Do not take Photos.
The ODOT Archaeologist will consult with SHPO and appropriate Tribal Governments and determine an appropriate course of action.
Additional archaeological excavations may be required. This is handled on a case by case basis by the agency Archaeologist in consultation with SHPO and appropriate Tribes.
When to stop work:
Construction work may uncover previously unidentified Native American or Euro-American artifacts. This may occur for a variety of reasons, but may be associated with access restrictions during project development, or if the area contains impervious surfaces throughout most of the project area which would have prevented standard archaeological site discovery methods.
Work must stop when the following types of artifacts and/or features are encountered (Appendix A):
Native American artifacts may include (but are not limited to):
Flaked stone tools (arrowheads, knives scrapers etc.)
Waste flakes that resulted from the construction of flaked stone tools.
Ground stone tools like mortars and pestles.
Layers (strata) of discolored earth resulting from fire hearths. May be black, red or mottled brown and often contain discolored cracked rocks or dark soil with broken shell
Human remains
Structural remains- wooden beams, post holes, fish weirs
Euro-American artifacts may include (but are not limited to):
Glass (from bottles, vessels, windows etc.)
Ceramic (from dinnerware, vessels etc.)
Metal (nails, drink/food cans, tobacco tins, industrial parts etc.)
Building materials (bricks, shingles etc.)
Building remains (foundations, architectural components etc.)
Old Wooden Posts, pilings, or planks (these may be encountered above or below water)
Even what looks to be old garbage could very well be an important archaeological resource
Remains of ships or sea-going vessels, marine hardware etc.
Old farm equipment may indicate historic resources in the area
When in doubt, call it in!
Contacts:
POSITION NAME WORK PHONE CELL PHONE
REC Sam Dunnavant 541-957-3519 541-430-6863
District Operations Coordinator
Jessica Spann 541-396-1143 541-315-5999
Archaeologist Jessica Bochart- Leusch
541-864-8820 541-530-0501
Arch. Program Mgr. (Alt.) Tobin Bottman 503-986-3783 503-877-8491
Proceeding with Construction
Construction can proceed only after the proper archaeological inspections have occurred and environmental clearances are obtained. This requires close coordination with SHPO, FHWA and the Tribes.
After an inadvertent discovery, some areas may be specified for close monitoring or ‘no work zones.’ Any such areas will be identified to the Lead Inspector, Project Manager, and appropriate Contractor personnel.
In coordination with the ODOT Archaeologist, the Lead Inspector will verify these identified areas by engineer’s station if available, mark them on site if appropriate.
The Contractor will follow ODOT Standard Specifications for Construction 290.51 and Special Provisions throughout the duration of the project.
Appendix A
Visual Reference Guide to Encountering Archaeology
Figure 1: Stone flakes
Figure 2: Stone tool fragments
Figure 3: Cordage
Figure 4: Shell midden
Figure 5: Historic glass artifacts
Figure 6: Historic metal artifacts
Figure 7: Historic building foundations
Figure 8: 18th Century ship
00290.90 Payment - Add the following paragraph(s) to the end of this subsection:
The accepted quantities of turbidity monitoring will be paid for at the Contract lump sum amount for the item "Turbidity Monitoring".
Payment for turbidity monitoring will be payment in full for furnishing and placing all materials and for furnishing all equipment, labor, and incidentals necessary to complete the work as specified.
No separate or additional payment will be made for work zone fencing.
SECTION 00305 - CONSTRUCTION SURVEY WORK
Comply with Section 00305 of the Standard Specifications.
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Comply with Section 00310 of the Standard Specifications modified as follows:
00310.45 Delivery of Existing Steel Plates
Contractor shall coordinate with ODOT and Laskey-Clifton Corporation for delivery of existing steel plates to the following address:
ODOT Maintenance Yard 307 Hwy 42 E.
Coquille Oregon, 97423
Laskey-Clifton Corporation (LCC) Yard
59919 US101
Coos Bay Oregon, 97420
Please call LCC at (541) 271-2213 and give a twenty-four (24) hours’ notice to be admitted to the yard.
SECTION 00330 - EARTHWORK
Comply with Section 00330 of the Standard Specifications.
SECTION 00405 - TRENCH EXCAVATION, BEDDING, AND BACKFILL
Comply with Section 00405 of the Standard Specifications.
SECTION 00415 - VIDEO PIPE INSPECTION
Comply with Section 00415 of the Standard Specifications modified as follows:
00415.22 Mainline Inspection Equipment with Laser Profiler - Replace this subsection, except for the subsection number and title, with the following:
Provide laser profiler, software and equipment according to 00415.20 and ASTM F3080.
00415.42 Post Installation Video Inspection - Replace this subsection, except for the subsection number and title, with the following:
Perform post construction video inspection according to 00415.40 and 00415.41. Video inspect the pipe interior no sooner than 30 Days after the trench backfill and compaction have been completed, and before any paving is performed. If the Contract duration does not permit a 30 Day waiting period the Engineer may adjust the duration period.
(a) Deflection Testing for Flexible Pipe - Perform post construction deflection testing for all flexible pipe including plastic, metal, and aluminum pipe using one of the approved following methods.
(1) Remote Video Inspection with Laser Profiler - Calibrate and perform deflection inspection according to ASTM F3080. Use video inspection equipment meeting the requirements of 00415.22.
(2) Manual Deflection Test - Use Equipment meeting the requirements of 00415.23.
In addition to 00415.41(b):
Measure the deflection of the pipe using either a metal or a fabric tape and read at least to the nearest 1/2 inch. Measure the smallest inside diameter three times for each pipe section in the run. Take the first measurement vertically from the crown to invert (12 o’clock to 6 o’clock positions). Take the second measurement by rotating 60 degrees from vertical (2 o’clock to 8 o’clock positions). Take the third measurement by rotating 120 degrees from vertical (4 o’clock to 10 o’clock positions). For all measurements, stretch tape to full extent across the inside of the pipe.
Calculate percent deflection using the following formula:
Percent Deflection = [(D1 - D2) ÷ D1] × 100
HWYE30Y
Highlight where:
D1 = Initial measurement according to AASHTO Nominal Diameter D2 = Most deflected measurement in each pipe run after construction
00415.70 Video Inspection Recording and Written Inspection Report - Replace the title of this subsection with “Video Inspection Recording and Inspection Report”
00415.70(a) Inspection Report - Replace this subsection, except for the subsection number and title, with the following:
Provide a written inspection report that includes each defect, deformity, and joint along with the distance from the inspection starting point. Provide still digital images in the report along with a reference and description of each defect, deformity and joint.
00415.70(b) Deflection Report - Replace this subsection, except for the subsection number and title, with the following:
For laser profiler provide an inspection report according to ASTM F3080.
If a manual deflection test was performed provide a written deflection inspection report that includes each deformity with the distance from the inspection starting point. Include in the report all measurements, calculations and still digital images and descriptions of each deformity.
00415.71 Corrections to Deficiencies in Work - Replace the paragraph that begins "Submit a repair plan to the Engineer for approval …" with the following paragraph:
Submit a repair plan to the Engineer for approval of all detrimental pipe deficiencies that are revealed in the video recording and written report. Repair all deficiencies within 48 hours after receiving notification from the Engineer. Re-perform the video inspection, submit the new video, and update the written report at no additional cost to the Agency.
SECTION 00440 - COMMERCIAL GRADE CONCRETE
Comply with Section 00440 of the Standard Specifications.
SECTION 00442 - CONTROLLED LOW STRENGTH MATERIALS
Comply with Section 00442 of the Standard Specifications.
SECTION 00445 - SANITARY, STORM, CULVERT, SIPHON, AND IRRIGATION PIPE
Comply with Section 00445 of the Standard Specifications.
SECTION 00460 - PAVED CULVERT END SLOPES
Comply with Section 00460 of the Standard Specifications modified as follows:
00460.10 Materials – Add the following Material to the end of this subsection:
Reinforcement, Grade 60………
SECTION 00470 - MANHOLES, CATCH BASINS, AND INLETS
Comply with Section 00470 of the Standard Specifications modified as follows:
00470.41(c) Grates, Frames, Covers and Fittings - Replace this subsection, except for the subsection number and title, with the following:
Set metal frames for manholes on full non-shrink grout beds to prevent infiltration of surface water or groundwater between the frame and the concrete of the manhole section. If concrete is to be poured around the frames, coat the portion of the frame that will contact the concrete with hot asphalt before placing the concrete. Set frames, covers and grates true to the locations and grades established. Clean bearing surfaces and provide uniform contact. The use of a bolt adjustment system for frames from the QPL is allowed. Secure all fastenings. Construct all mortared, sanitary sewer manhole necks and all riser ring joints made with non-shrink grout using an approved commercial concrete bonding agent applied to all cured concrete surfaces being grouted.
00470.42 Precast Concrete Catch Basins and Inlets - Add the following sentence to the end of this subsection:
Grade adjustments using a bolt system from the QPL is allowed.
SECTION 00490 - WORK ON EXISTING SEWERS AND STRUCTURES
Comply with Section 00490 of the Standard Specifications.
SECTION 00495 - TRENCH RESURFACING
Comply with Section 00495 of the Standard Specifications.
SECTION 00530 - STEEL REINFORCEMENT FOR CONCRETE
Comply with Section 00530 of the Standard Specifications.
SECTION 00640 - AGGREGATE BASE AND SHOULDERS
Comply with Section…