Preliminary Results~54.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Fall 2023 ODOT Region 3 Geotechnical Drilling
Solicitation number
S-73000-00008555
Issued by
Jackson County, Canyonville City, Oregon

About this file

This document contains preliminary results for a request for competitive qualifications (RFCQ) issued by the Oregon Department of Transportation (ODOT) for geotechnical drilling services at five project locations in Oregon. The RFCQ seeks a qualified contractor to provide drilling, geotechnical sampling, and instrumentation services at the following sites: Lower Grave Creek Road (Wolf Creek), Takilma Road (Althouse Creek Bridge), Highland Drive (Barnett Bridge), OR 99 Blackwell Road (Gold Hill Bridge), and Caves Camp Road (Caves Camp Bridge). The RFCQ has a response deadline of November 28, 2023, at 2:00 PM. The document provides preliminary pricing and quantities for various items such as administration, mobilization, drilling, sampling, instrumentation, and standby time.

The preliminary results show bids from three contractors: Crisman Pacific Strata, Western States Soil Conservation, Inc., and Haz-Tech Drilling, Inc. The total bid amounts for all five sites range from $84,753.00 to $132,650.00 across the three bidders. The pricing includes unit prices and estimated quantities for the requested services. The document notes that in the event of any math errors, the unit prices will prevail over the total prices.

View the file

Other files

File Type Posted
Sample Contract~32.docx DOCX document
Attachment 3 - Sample Contract~2.pdf PDF
Request for Competitive Quotes.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Preliminary Results RFCQ No. S-73000-00008555November 28, 2023 @ 2:00 PM
Preliminary Results are not an indicator of Award
ContractorCrisman Pacific Strata DrillingContractorWestern States Soil Conservation, Inc.ContractorHaz-Tech Drilling, Inc.
Site 1: Lower Grave Creek Road: Wolf Creek Bridge (Wolf Creek)City, StateDonald, ORCity, StateHubbard, ORCity, StateNampa, ID
ITEM NO.ITEM DESCRIPTIONEST. QUANTITYUNITUNIT PRICETOTAL PRICEUNIT PRICETOTAL PRICEUNIT PRICETOTAL PRICE
1Administration1Lump Sum$1,000.00$1,000.00$0.00$0.00$1,250.00$1,250.00
2Mobilization1Lump Sum$3,000.00$3,000.00$5,000.00$5,000.00$3,500.00$3,500.00
3Auger Drilling 4-inch ID HSA15Foot$60.00$900.00$65.00$975.00$115.00$1,725.00
4Mud Rotary Drilling5Foot$65.00$325.00$65.00$325.00$115.00$575.00
5Rock Coring HQ3 Wire-Line50Foot$70.00$3,500.00$75.00$3,750.00$115.00$5,750.00
6Thin-Walled Shelby Tube Sample (casing supplied by ODOT)0Each$42.00$0.00$32.00$0.00$50.00$0.00
72-inch SPTs4Each$6.00$24.00$20.00$80.00$25.00$100.00
8VWT Installation1Each$150.00$150.00$1,250.00$1,250.00$1,000.00$1,000.00
9Concrete / Asphalt Coring2Each$100.00$200.00$100.00$200.00$50.00$100.00
10Drums for Cuttings0Each$100.00$0.00$100.00$0.00$85.00$0.00
11Standby (ODOT Induced)8Hour$100.00$800.00$0.00$0.00$300.00$2,400.00
12Standby (Fire Regulations)8Hours$0.00$0.00$0.00$0.00$75.00$600.00
Total$9,899.00Total$11,580.00Total$17,000.00
Site 2: Takilma Road: Althouse Creek Bridge (Cave Junction)
ITEM NO.ITEM DESCRIPTIONEST. QUANTITYUNITUNIT PRICETOTAL PRICEUNIT PRICETOTAL PRICEUNIT PRICETOTAL PRICE
1Administration1Lump Sum$1,000.00$1,000.00$0.00$0.00$1,250.00$1,250.00
2Mobilization1Lump Sum$3,000.00$3,000.00$9,350.00$9,350.00$3,500.00$3,500.00
3Auger Drilling 4-inch ID HSA20Foot$60.00$1,200.00$65.00$1,300.00$95.00$1,900.00
4Mud Rotary Drilling180Foot$65.00$11,700.00$65.00$11,700.00$95.00$17,100.00
5Rock Coring HQ3 Wire-Line20Foot$70.00$1,400.00$75.00$1,500.00$95.00$1,900.00
6Thin-Walled Shelby Tube Sample (casing supplied by ODOT)10Each$42.00$420.00$32.00$320.00$50.00$500.00
72-inch SPTs30Each$6.00$180.00$20.00$600.00$25.00$750.00
8VWT Installation1Each$150.00$150.00$2,350.00$2,350.00$2,400.00$2,400.00
9Concrete/Asphalt Coring2Each$100.00$200.00$100.00$200.00$50.00$100.00
10Drums for Cuttings0Each$100.00$0.00$100.00$0.00$85.00$0.00
11Standby (ODOT Induced)8Hour$100.00$800.00$0.00$0.00$300.00$2,400.00
12Standby (Fire Regulations)8Hours$0.00$0.00$0.00$0.00$75.00$600.00
Total$20,050.00Total$27,320.00Total$32,400.00
Site 3: Highland Drive: Barnett Bridge (Medford)
ITEM No.ITEM DESCRIPTIONEST. QUANTITYUNITUNIT PRICETOTAL PRICEUNIT PRICETOTAL PRICEUNIT PRICETOTAL PRICE
1Administration1Lump Sum$1,000.00$1,000.00$0.00$0.00$1,250.00$1,250.00
2Mobilization1Lump Sum$3,000.00$3,000.00$7,700.00$7,700.00$3,500.00$3,500.00
3Auger Drilling 4-inch ID HSA120Foot$60.00$7,200.00$65.00$7,800.00$80.00$9,600.00
4Mud Rotary Drilling5Foot$65.00$325.00$65.00$325.00$80.00$400.00
5Rock Coring HQ3 Wire-Line30Foot$70.00$2,100.00$75.00$2,250.00$80.00$2,400.00
6Thin-Walled Shelby Tube Sample (casing supplied by ODOT)2Each$42.00$84.00$32.00$64.00$50.00$100.00
72-inch SPTs20Each$6.00$120.00$20.00$400.00$25.00$500.00
8VWT Installation2Each$150.00$300.00$1,250.00$2,500.00$1,000.00$2,000.00
9Concrete / Asphalt Coring2Each$100.00$200.00$100.00$200.00$50.00$100.00
10Drums for Cuttings0Each$100.00$0.00$100.00$0.00$85.00$0.00
11Standby (ODOT Induced)8Hour$100.00$800.00$0.00$0.00$300.00$2,400.00
12Standby (Fire Regulations)8Hours$0.00$0.00$0.00$0.00$75.00$600.00
Total$15,129.00Total$21,239.00Total$22,850.00
Site 4: OR 99 2nd Ave/Blackwell Road: Gold Hill Bridge (Gold Hill)
ITEM NO.ITEM DESCRIPTIONQUANTITYUNITUNIT PRICETOTAL PRICEUNIT PRICETOTAL PRICEUNIT PRICETOTAL PRICE
1Administration1Lump Sum$1,000.00$1,000.00$0.00$0.00$1,250.00$1,250.00
2Mobilization1Lump Sum$3,000.00$3,000.00$12,000.00$12,000.00$10,500.00$10,500.00
3Auger Drilling 4-inch ID HSA85Foot$60.00$5,100.00$65.00$5,525.00$70.00$5,950.00
4Mud Rotary Drilling5Foot$65.00$325.00$65.00$325.00$70.00$350.00
5Rock Coring HQ3 Wire-Line180Foot$70.00$12,600.00$75.00$13,500.00$70.00$12,600.00
6Thin-Walled Shelby Tube Sample (casing supplied by ODOT)4Each$42.00$168.00$32.00$128.00$50.00$200.00
72-inch SPTs16Each$6.00$96.00$20.00$320.00$25.00$400.00
8VWT Installation2Each$150.00$300.00$1,350.00$2,700.00$1,200.00$2,400.00
9Concrete / Asphalt Coring4Each$100.00$400.00$100.00$400.00$50.00$200.00
10Drums for Cuttings0Each$100.00$0.00$100.00$0.00$85.00$0.00
11Standby (ODOT Induced)8Hour$100.00$800.00$0.00$0.00$300.00$2,400.00
12Standby (Fire Regulations)8Hours$0.00$0.00$0.00$0.00$75.00$600.00
Total$23,789.00Total$34,898.00Total$36,850.00
Site 5: Caves Camp Road: Caves Camp Bridge (Williams
ITEM NO.ITEM DESCRIPTIONEST. QUANTITYUNITUNIT PRICETOTAL PRICEUNIT PRICETOTAL PRICEUNIT PRICETOTAL PRICE
1Administration1Lump Sum$1,000.00$1,000.00$0.00$0.00$1,250.00$1,250.00
2Mobilization1Lump Sum$3,000.00$3,000.00$8,000.00$8,000.00$3,500.00$3,500.00
3Auger Drilling 4-inch ID HSA20Foot$60.00$1,200.00$65.00$1,300.00$80.00$1,600.00
4Mud Rotary Drilling120Foot$65.00$7,800.00$65.00$7,800.00$80.00$9,600.00
5Rock Coring HQ3 Wire-Line20Foot$70.00$1,400.00$75.00$1,500.00$80.00$1,600.00
6Thin-Walled Shelby Tube Sample (casing supplied by ODOT)4Each$42.00$168.00$32.00$128.00$50.00$200.00
72-inch SPTs28Each$6.00$168.00$20.00$560.00$25.00$700.00
8VWT Installation1Each$150.00$150.00$2,000.00$2,000.00$2,000.00$2,000.00
9Concrete / Asphalt Coring2Each$100.00$200.00$100.00$200.00$50.00$100.00
10Drums for Cuttings0Each$100.00$0.00$100.00$0.00$85.00$0.00
11Standby (ODOT Induced)8Hour$100.00$800.00$0.00$0.00$300.00$2,400.00
12Standby (Fire Regulations)8Hours$0.00$0.00$0.00$0.00$75.00$600.00
Total$15,886.00Total$21,488.00Total$23,550.00
Total 5 Sites$84,753.00Total 5 Sites$116,525.00Total 5 Sites$132,650.00
Note: In the event of math errors Unit Prices prevail over Total Price.