Preliminary Results~54.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Fall 2023 ODOT Region 3 Geotechnical Drilling
- Solicitation number
- S-73000-00008555
- Issued by
- Jackson County, Canyonville City, Oregon
About this file
This document contains preliminary results for a request for competitive qualifications (RFCQ) issued by the Oregon Department of Transportation (ODOT) for geotechnical drilling services at five project locations in Oregon. The RFCQ seeks a qualified contractor to provide drilling, geotechnical sampling, and instrumentation services at the following sites: Lower Grave Creek Road (Wolf Creek), Takilma Road (Althouse Creek Bridge), Highland Drive (Barnett Bridge), OR 99 Blackwell Road (Gold Hill Bridge), and Caves Camp Road (Caves Camp Bridge). The RFCQ has a response deadline of November 28, 2023, at 2:00 PM. The document provides preliminary pricing and quantities for various items such as administration, mobilization, drilling, sampling, instrumentation, and standby time.
The preliminary results show bids from three contractors: Crisman Pacific Strata, Western States Soil Conservation, Inc., and Haz-Tech Drilling, Inc. The total bid amounts for all five sites range from $84,753.00 to $132,650.00 across the three bidders. The pricing includes unit prices and estimated quantities for the requested services. The document notes that in the event of any math errors, the unit prices will prevail over the total prices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sample Contract~32.docx | DOCX document | |
| Attachment 3 - Sample Contract~2.pdf | ||
| Request for Competitive Quotes.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Preliminary Results RFCQ No. S-73000-00008555 | November 28, 2023 @ 2:00 PM | ||||||||
| Preliminary Results are not an indicator of Award | |||||||||
| Contractor | Crisman Pacific Strata Drilling | Contractor | Western States Soil Conservation, Inc. | Contractor | Haz-Tech Drilling, Inc. | ||||
| Site 1: Lower Grave Creek Road: Wolf Creek Bridge (Wolf Creek) | City, State | Donald, OR | City, State | Hubbard, OR | City, State | Nampa, ID | |||
| ITEM NO. | ITEM DESCRIPTION | EST. QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE | UNIT PRICE | TOTAL PRICE | UNIT PRICE | TOTAL PRICE |
| 1 | Administration | 1 | Lump Sum | $1,000.00 | $1,000.00 | $0.00 | $0.00 | $1,250.00 | $1,250.00 |
| 2 | Mobilization | 1 | Lump Sum | $3,000.00 | $3,000.00 | $5,000.00 | $5,000.00 | $3,500.00 | $3,500.00 |
| 3 | Auger Drilling 4-inch ID HSA | 15 | Foot | $60.00 | $900.00 | $65.00 | $975.00 | $115.00 | $1,725.00 |
| 4 | Mud Rotary Drilling | 5 | Foot | $65.00 | $325.00 | $65.00 | $325.00 | $115.00 | $575.00 |
| 5 | Rock Coring HQ3 Wire-Line | 50 | Foot | $70.00 | $3,500.00 | $75.00 | $3,750.00 | $115.00 | $5,750.00 |
| 6 | Thin-Walled Shelby Tube Sample (casing supplied by ODOT) | 0 | Each | $42.00 | $0.00 | $32.00 | $0.00 | $50.00 | $0.00 |
| 7 | 2-inch SPTs | 4 | Each | $6.00 | $24.00 | $20.00 | $80.00 | $25.00 | $100.00 |
| 8 | VWT Installation | 1 | Each | $150.00 | $150.00 | $1,250.00 | $1,250.00 | $1,000.00 | $1,000.00 |
| 9 | Concrete / Asphalt Coring | 2 | Each | $100.00 | $200.00 | $100.00 | $200.00 | $50.00 | $100.00 |
| 10 | Drums for Cuttings | 0 | Each | $100.00 | $0.00 | $100.00 | $0.00 | $85.00 | $0.00 |
| 11 | Standby (ODOT Induced) | 8 | Hour | $100.00 | $800.00 | $0.00 | $0.00 | $300.00 | $2,400.00 |
| 12 | Standby (Fire Regulations) | 8 | Hours | $0.00 | $0.00 | $0.00 | $0.00 | $75.00 | $600.00 |
| Total | $9,899.00 | Total | $11,580.00 | Total | $17,000.00 |
| Site 2: Takilma Road: Althouse Creek Bridge (Cave Junction) | |||||||||
| ITEM NO. | ITEM DESCRIPTION | EST. QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE | UNIT PRICE | TOTAL PRICE | UNIT PRICE | TOTAL PRICE |
| 1 | Administration | 1 | Lump Sum | $1,000.00 | $1,000.00 | $0.00 | $0.00 | $1,250.00 | $1,250.00 |
| 2 | Mobilization | 1 | Lump Sum | $3,000.00 | $3,000.00 | $9,350.00 | $9,350.00 | $3,500.00 | $3,500.00 |
| 3 | Auger Drilling 4-inch ID HSA | 20 | Foot | $60.00 | $1,200.00 | $65.00 | $1,300.00 | $95.00 | $1,900.00 |
| 4 | Mud Rotary Drilling | 180 | Foot | $65.00 | $11,700.00 | $65.00 | $11,700.00 | $95.00 | $17,100.00 |
| 5 | Rock Coring HQ3 Wire-Line | 20 | Foot | $70.00 | $1,400.00 | $75.00 | $1,500.00 | $95.00 | $1,900.00 |
| 6 | Thin-Walled Shelby Tube Sample (casing supplied by ODOT) | 10 | Each | $42.00 | $420.00 | $32.00 | $320.00 | $50.00 | $500.00 |
| 7 | 2-inch SPTs | 30 | Each | $6.00 | $180.00 | $20.00 | $600.00 | $25.00 | $750.00 |
| 8 | VWT Installation | 1 | Each | $150.00 | $150.00 | $2,350.00 | $2,350.00 | $2,400.00 | $2,400.00 |
| 9 | Concrete/Asphalt Coring | 2 | Each | $100.00 | $200.00 | $100.00 | $200.00 | $50.00 | $100.00 |
| 10 | Drums for Cuttings | 0 | Each | $100.00 | $0.00 | $100.00 | $0.00 | $85.00 | $0.00 |
| 11 | Standby (ODOT Induced) | 8 | Hour | $100.00 | $800.00 | $0.00 | $0.00 | $300.00 | $2,400.00 |
| 12 | Standby (Fire Regulations) | 8 | Hours | $0.00 | $0.00 | $0.00 | $0.00 | $75.00 | $600.00 |
| Total | $20,050.00 | Total | $27,320.00 | Total | $32,400.00 |
| Site 3: Highland Drive: Barnett Bridge (Medford) | |||||||||
| ITEM No. | ITEM DESCRIPTION | EST. QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE | UNIT PRICE | TOTAL PRICE | UNIT PRICE | TOTAL PRICE |
| 1 | Administration | 1 | Lump Sum | $1,000.00 | $1,000.00 | $0.00 | $0.00 | $1,250.00 | $1,250.00 |
| 2 | Mobilization | 1 | Lump Sum | $3,000.00 | $3,000.00 | $7,700.00 | $7,700.00 | $3,500.00 | $3,500.00 |
| 3 | Auger Drilling 4-inch ID HSA | 120 | Foot | $60.00 | $7,200.00 | $65.00 | $7,800.00 | $80.00 | $9,600.00 |
| 4 | Mud Rotary Drilling | 5 | Foot | $65.00 | $325.00 | $65.00 | $325.00 | $80.00 | $400.00 |
| 5 | Rock Coring HQ3 Wire-Line | 30 | Foot | $70.00 | $2,100.00 | $75.00 | $2,250.00 | $80.00 | $2,400.00 |
| 6 | Thin-Walled Shelby Tube Sample (casing supplied by ODOT) | 2 | Each | $42.00 | $84.00 | $32.00 | $64.00 | $50.00 | $100.00 |
| 7 | 2-inch SPTs | 20 | Each | $6.00 | $120.00 | $20.00 | $400.00 | $25.00 | $500.00 |
| 8 | VWT Installation | 2 | Each | $150.00 | $300.00 | $1,250.00 | $2,500.00 | $1,000.00 | $2,000.00 |
| 9 | Concrete / Asphalt Coring | 2 | Each | $100.00 | $200.00 | $100.00 | $200.00 | $50.00 | $100.00 |
| 10 | Drums for Cuttings | 0 | Each | $100.00 | $0.00 | $100.00 | $0.00 | $85.00 | $0.00 |
| 11 | Standby (ODOT Induced) | 8 | Hour | $100.00 | $800.00 | $0.00 | $0.00 | $300.00 | $2,400.00 |
| 12 | Standby (Fire Regulations) | 8 | Hours | $0.00 | $0.00 | $0.00 | $0.00 | $75.00 | $600.00 |
| Total | $15,129.00 | Total | $21,239.00 | Total | $22,850.00 |
| Site 4: OR 99 2nd Ave/Blackwell Road: Gold Hill Bridge (Gold Hill) | |||||||||
| ITEM NO. | ITEM DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE | UNIT PRICE | TOTAL PRICE | UNIT PRICE | TOTAL PRICE |
| 1 | Administration | 1 | Lump Sum | $1,000.00 | $1,000.00 | $0.00 | $0.00 | $1,250.00 | $1,250.00 |
| 2 | Mobilization | 1 | Lump Sum | $3,000.00 | $3,000.00 | $12,000.00 | $12,000.00 | $10,500.00 | $10,500.00 |
| 3 | Auger Drilling 4-inch ID HSA | 85 | Foot | $60.00 | $5,100.00 | $65.00 | $5,525.00 | $70.00 | $5,950.00 |
| 4 | Mud Rotary Drilling | 5 | Foot | $65.00 | $325.00 | $65.00 | $325.00 | $70.00 | $350.00 |
| 5 | Rock Coring HQ3 Wire-Line | 180 | Foot | $70.00 | $12,600.00 | $75.00 | $13,500.00 | $70.00 | $12,600.00 |
| 6 | Thin-Walled Shelby Tube Sample (casing supplied by ODOT) | 4 | Each | $42.00 | $168.00 | $32.00 | $128.00 | $50.00 | $200.00 |
| 7 | 2-inch SPTs | 16 | Each | $6.00 | $96.00 | $20.00 | $320.00 | $25.00 | $400.00 |
| 8 | VWT Installation | 2 | Each | $150.00 | $300.00 | $1,350.00 | $2,700.00 | $1,200.00 | $2,400.00 |
| 9 | Concrete / Asphalt Coring | 4 | Each | $100.00 | $400.00 | $100.00 | $400.00 | $50.00 | $200.00 |
| 10 | Drums for Cuttings | 0 | Each | $100.00 | $0.00 | $100.00 | $0.00 | $85.00 | $0.00 |
| 11 | Standby (ODOT Induced) | 8 | Hour | $100.00 | $800.00 | $0.00 | $0.00 | $300.00 | $2,400.00 |
| 12 | Standby (Fire Regulations) | 8 | Hours | $0.00 | $0.00 | $0.00 | $0.00 | $75.00 | $600.00 |
| Total | $23,789.00 | Total | $34,898.00 | Total | $36,850.00 |
| Site 5: Caves Camp Road: Caves Camp Bridge (Williams | |||||||||
| ITEM NO. | ITEM DESCRIPTION | EST. QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE | UNIT PRICE | TOTAL PRICE | UNIT PRICE | TOTAL PRICE |
| 1 | Administration | 1 | Lump Sum | $1,000.00 | $1,000.00 | $0.00 | $0.00 | $1,250.00 | $1,250.00 |
| 2 | Mobilization | 1 | Lump Sum | $3,000.00 | $3,000.00 | $8,000.00 | $8,000.00 | $3,500.00 | $3,500.00 |
| 3 | Auger Drilling 4-inch ID HSA | 20 | Foot | $60.00 | $1,200.00 | $65.00 | $1,300.00 | $80.00 | $1,600.00 |
| 4 | Mud Rotary Drilling | 120 | Foot | $65.00 | $7,800.00 | $65.00 | $7,800.00 | $80.00 | $9,600.00 |
| 5 | Rock Coring HQ3 Wire-Line | 20 | Foot | $70.00 | $1,400.00 | $75.00 | $1,500.00 | $80.00 | $1,600.00 |
| 6 | Thin-Walled Shelby Tube Sample (casing supplied by ODOT) | 4 | Each | $42.00 | $168.00 | $32.00 | $128.00 | $50.00 | $200.00 |
| 7 | 2-inch SPTs | 28 | Each | $6.00 | $168.00 | $20.00 | $560.00 | $25.00 | $700.00 |
| 8 | VWT Installation | 1 | Each | $150.00 | $150.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 9 | Concrete / Asphalt Coring | 2 | Each | $100.00 | $200.00 | $100.00 | $200.00 | $50.00 | $100.00 |
| 10 | Drums for Cuttings | 0 | Each | $100.00 | $0.00 | $100.00 | $0.00 | $85.00 | $0.00 |
| 11 | Standby (ODOT Induced) | 8 | Hour | $100.00 | $800.00 | $0.00 | $0.00 | $300.00 | $2,400.00 |
| 12 | Standby (Fire Regulations) | 8 | Hours | $0.00 | $0.00 | $0.00 | $0.00 | $75.00 | $600.00 |
| Total | $15,886.00 | Total | $21,488.00 | Total | $23,550.00 | ||||
| Total 5 Sites | $84,753.00 | Total 5 Sites | $116,525.00 | Total 5 Sites | $132,650.00 | ||||
| Note: In the event of math errors Unit Prices prevail over Total Price. |