Preliminary Bid Results~68.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Cereal, 7-9 Grain
Solicitation number
S-29100-00014601
Issued by
Marion County, Oregon

About this file

This is a preliminary bid results tabulation for Invitation to Bid (ITB) No. S-73000-00014602 issued by an unnamed state or local jurisdiction for 2025 Region 1 On-Call Tree and Brush Cutting services. The bid closing date was November 20, 2025, at 2:00 PM. Six bidders submitted proposals: Arborists of America, Mountain View Tree Service, O'Malley Brothers Corporation, Mangolds Tree Removal Service LLC, N.W. Trees & Land, and Platt Excavation. The bid tabulation includes 33 line items covering various services and equipment ranging from mobilization and labor (climber and ground workers, bucket truck crews) to specialized equipment operations (feller bunchers, mulchers, log grapples, excavators, and cranes). The solicitation includes separate pricing for standard labor rates and prevailing wage rate positions, as well as ancillary services such as traffic control, flagging, and debris disposal. Estimated quantities are listed as single units with varying measurement bases including lump sum, hourly, daily, and square yard rates.

The bid results show total prices ranging from $3,430.00 (Arborists of America) to $15,158.00 (N.W. Trees & Land), with intermediate bids from Mountain View Tree Service ($9,409.00), O'Malley Brothers Corporation ($11,750.00), Platt Excavation ($12,310.00), and Mangolds Tree Removal Service LLC ($13,722.00). The document explicitly states that the bid tabulation is not an indicator of award and serves only as a compilation of submitted bids for consideration. Individual line-item pricing varies significantly among bidders, with some contractors not submitting prices for certain equipment or services, indicated by zero entries. The prevailing wage rate items command substantially higher hourly rates than standard labor rates across all bidders, reflecting statutory wage requirements. This file does not contain information regarding evaluation criteria, award recommendations, contract term length, or renewal options.

View the file

Other files

File Type Posted
Cereal 7-9~1.docx DOCX document
Sample Agreement~10.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:November 20. 2025
ITB No.S-73000-00014602BIDDER
NAME:Arborists of AmericaMountain View Tree ServiceO'Malley Brothers CorporationMangolds tree removal service LLCN.W. Trees & LandPlatt Excavation
Bid Closing:November 20. 2025 2:00 pmCITY/STATE:
Description:2025 Region 1 On-Call Tree and Brush CuttingCCB#:
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1Mobilization1LUMP SUM$ 675.00$ 675.00$ 500.00$ 500.00$ 1,900.00$ 1,900.00$ 250.00$ 250.00$ 3,000.00$ 3,000.00$ 1,500.00$ 1,500.00
2Climber and Two Ground Workers1HR$ 395.00$ 395.00$ 325.00$ 325.00$ 250.00$ 250.00$ 425.00$ 425.00$ 445.00$ 445.00$ 750.00$ 750.00
3Bucket Truck and Crew1HR$ - 0$ - 0$ 325.00$ 325.00$ 295.00$ 295.00$ 425.00$ 425.00$ 500.00$ 500.00$ 350.00$ 350.00
4Feller Buncher and Operator1HR$ - 0$ - 0$ 450.00$ 450.00$ 245.00$ 245.00$ - 0$ - 0$ 450.00$ 450.00$ 330.00$ 330.00
5Mulcher Mower and Crew1HR$ - 0$ - 0$ 275.00$ 275.00$ 225.00$ 225.00$ 450.00$ 450.00$ 325.00$ 325.00$ 300.00$ 300.00
6Log Grapple and Operator1HR$ - 0$ - 0$ 250.00$ 250.00$ 225.00$ 225.00$ 600.00$ 600.00$ 310.00$ 310.00$ 260.00$ 260.00
7Brush Chipper and Crew1HR$ 425.00$ 425.00$ 325.00$ 325.00$ 295.00$ 295.00$ 425.00$ 425.00$ 405.00$ 405.00$ 325.00$ 325.00
8Log Loader and Operator1HR$ - 0$ - 0$ 250.00$ 250.00$ 225.00$ 225.00$ 500.00$ 500.00$ 250.00$ 250.00$ 260.00$ 260.00
9Prevailing Wage Rate Climber and Two Ground Workers1HR$ 425.00$ 425.00$ 450.00$ 450.00$ 325.00$ 325.00$ 500.00$ 500.00$ 623.00$ 623.00$ 1,125.00$ 1,125.00
10Prevailing Wage Rate Bucket truck and Crew1HR$ - 0$ - 0$ 450.00$ 450.00$ 335.00$ 335.00$ 425.00$ 425.00$ 700.00$ 700.00$ 495.00$ 495.00
11Prevailing Wage Rate Feller Buncher and Operator1HR$ - 0$ - 0$ 475.00$ 475.00$ 275.00$ 275.00$ - 0$ - 0$ 585.00$ 585.00$ 380.00$ 380.00
12Prevailing Wage Rate Mulcher Mower and Crew1HR$ - 0$ - 0$ 325.00$ 325.00$ 250.00$ 250.00$ 450.00$ 450.00$ 422.00$ 422.00$ 350.00$ 350.00
13Prevailing Wage Rate Log Grapple and Operator1HR$ - 0$ - 0$ 350.00$ 350.00$ 250.00$ 250.00$ 600.00$ 600.00$ 403.00$ 403.00$ 310.00$ 310.00
14Prevailing Wage Rate Brush Chipper and Crew1HR$ 545.00$ 545.00$ 450.00$ 450.00$ 325.00$ 325.00$ 425.00$ 425.00$ 567.00$ 567.00$ 425.00$ 425.00
15Prevailing Wage Rate Log Loader and Operator1HR$ - 0$ - 0$ 275.00$ 275.00$ 250.00$ 250.00$ 500.00$ 500.00$ 325.00$ 325.00$ 310.00$ 310.00
16Emergency Callout Premium - Per Work Order1EA$ 650.00$ 650.00$ - 0$ - 0$ 2,500.00$ 2,500.00$ 1,000.00$ 1,000.00$ 1,500.00$ 1,500.00$ 1,500.00$ 1,500.00
17Per Diem - per employee, per day (with exceptions: See specs)1EA$ 165.00$ 165.00$ 170.00$ 170.00$ 100.00$ 100.00$ 400.00$ 400.00$ 200.00$ 200.00$ 300.00$ 300.00
18Standard Traffic Control equipment and Materials, Complete1DAY$ 125.00$ 125.00$ 300.00$ 300.00$ 250.00$ 250.00$ 1,500.00$ 1,500.00$ 400.00$ 400.00$ 800.00$ 800.00
19Flagger1HR$ - 0$ - 0$ 65.00$ 65.00$ 75.00$ 75.00$ 75.00$ 75.00$ 100.00$ 100.00$ 120.00$ 120.00
20Prevailing Wage Rate Flagger1HR$ - 0$ - 0$ 80.00$ 80.00$ 95.00$ 95.00$ 75.00$ 75.00$ 140.00$ 140.00$ 170.00$ 170.00
2150 Ton Crane and Operator1HR$ - 0$ - 0$ 400.00$ 400.00$ 695.00$ 695.00$ 600.00$ 600.00$ 400.00$ 400.00$ 650.00$ 650.00
22Roll Off Truck for Log and Debris Disposal - Complete1HR$ - 0$ - 0$ 250.00$ 250.00$ 165.00$ 165.00$ - 0$ - 0$ 200.00$ 200.00$ 200.00$ 200.00
23Wood Chip Disposal, Complete1SQUARE YARD$ 25.00$ 25.00$ 9.00$ 9.00$ 25.00$ 25.00$ 10.00$ 10.00$ 20.00$ 20.00$ 17.00$ 17.00
24Excavator, Less than 25,000 LBS and Operator1HR$ - 0$ - 0$ 250.00$ 250.00$ 145.00$ 145.00$ 250.00$ 250.00$ 250.00$ 250.00$ 200.00$ 200.00
25Laborer/Spotter1HR$ - 0$ - 0$ 125.00$ 125.00$ 75.00$ 75.00$ 75.00$ 75.00$ 70.00$ 70.00$ 110.00$ 110.00
26Prevailing Wage Rate Laborer/Spotter1HR$ - 0$ - 0$ 150.00$ 150.00$ 95.00$ 95.00$ 75.00$ 75.00$ 78.00$ 78.00$ 130.00$ 130.00
27Flagger Truck1HR$ - 0$ - 0$ 75.00$ 75.00$ 110.00$ 110.00$ 125.00$ 125.00$ 150.00$ 150.00$ 50.00$ 50.00
28Excavator, 25,000 to 33,000 LBS and Operator1HR$ - 0$ - 0$ 260.00$ 260.00$ 175.00$ 175.00$ 300.00$ 300.00$ 300.00$ 300.00$ 220.00$ 220.00
29Excavator, greater than 33,000 LBS and Operator1HR$ - 0$ - 0$ 275.00$ 275.00$ 195.00$ 195.00$ 350.00$ 350.00$ 350.00$ 350.00$ 260.00$ 260.00
30Prevailing Wage Rate 50 ton Crane and operator1HR$ - 0$ - 0$ 450.00$ 450.00$ 795.00$ 795.00$ 600.00$ 600.00$ 520.00$ 520.00$ 750.00$ 750.00
31Prevailing Wage Rate Excavator, Less Than 25,000 LBS and Operator1HR$ - 0$ - 0$ 350.00$ 350.00$ 165.00$ 165.00$ 250.00$ 250.00$ 325.00$ 325.00$ 225.00$ 225.00
32Prevailing Wage Rate Excavator, 25,000 to 35,000 LBS and Operator1HR$ - 0$ - 0$ 350.00$ 350.00$ 195.00$ 195.00$ 300.00$ 300.00$ 390.00$ 390.00$ 260.00$ 260.00
33Prevailing Wage Rate Excavator, Greater Than 33,000 LBS and Operator1HR$ - 0$ - 0$ 375.00$ 375.00$ 225.00$ 225.00$ 350.00$ 350.00$ 455.00$ 455.00$ 290.00$ 290.00
TOTAL$ 3,430.00$ 9,409.00$ 11,750.00$ 12,310.00$ 15,158.00$ 13,722.00

File details come from the government source that posted it. Updated .