About this file
This is a preliminary bid tabulation for an Invitation to Bid (ITB) issued by an Oregon state agency for highway maintenance paving services on US Route 26 (Mt Hood Highway) between Palmquist Road and Haley Road, covering mile posts 14.8 to 18.3. The project involves asphalt grinding to a 2-inch depth across 24,415 square yards and placement of Level 3, 1/2-inch asphalt concrete pavement on 2,750 tons of material. The bid closing date was April 4, 2025, with four contractors submitting bids: Knife River Corporation - Northwest, Brix Paving Northwest, KNL Industries, and Granite Construction Company. The tabulation includes line items for mobilization and flagging/traffic control services required for project execution.
The bid results show significant price variation among the four responsive bidders. Knife River Corporation - Northwest submitted the lowest total bid at $296,460.25, while Granite Construction Company's bid was the highest at $329,958.00. Notable pricing differences appear in asphalt grinding costs, ranging from $0.50 to $1.50 per square yard, and in Level 3 asphalt placement costs, ranging from $82.00 to $107.00 per ton. This bid tabulation is identified as preliminary and does not constitute an award determination, indicating that the agency retains discretion in evaluating contractor qualifications and responsiveness before making a final award decision.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Mayo Margerine.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 4/4/25 | |||||
| ITB No. | S-73000-00013076 | BIDDER | ||||
| NAME: | Knife River Corporation - Northwest | Brix Paving Northwest | KNL Industries | Granite Construction Company | ||
| Bid Closing: | April 4, 2025 | CITY/STATE: | ||||
| Description: | US26 (Mt Hood Hwy): Palmquist Rd - Haley Rd Maintenance Pave MP 14.8 to MP 18.3 | CCB#: | ||||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $ 13,000.00 | $ 13,000.00 | $ 8,000.00 | $ 8,000.00 | $10,000.00 | $ 10,000.00 | $13,500.50 | $ 13,500.50 |
| 2 | Flagging / Traffic Control | 1 | LS | $ 25,000.00 | $ 25,000.00 | $ 13,000.00 | $ 13,000.00 | $15,000.00 | $ 15,000.00 | $10,000.00 | $ 10,000.00 |
| 3 | Asphalt Grinding, 2" Depth | 24,415 | SY | $ 1.35 | $ 32,960.25 | $ 1.15 | $ 28,077.25 | $1.50 | $ 36,622.50 | $0.50 | $ 12,207.50 |
| 4 | Level 3, 1/2 Inch ACP | 2,750 | TON | $ 82.00 | $ 225,500.00 | $ 98.00 | $ 269,500.00 | $97.50 | $ 268,125.00 | $107.00 | $ 294,250.00 |
| TOTAL | $ 296,460.25 | $ 318,577.25 | $ 329,747.50 | $ 329,958.00 |
File details come from the government source that posted it. Updated .