Preliminary Bid Results~42.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- ODOT Region 1 On-Call Electrical Services PA
- Solicitation number
- S-73000-00012661
- Issued by
- Oregon
About this file
This is a preliminary bid results tabulation for a pavement repair project on Oregon Route 213 between Interstate 205 and Redland Road issued by the Oregon Department of Transportation (ODOT) on March 13, 2025. The project encompasses pavement repair work including mobilization, temporary work zone traffic control, bridge removal, elastomeric concrete nosing material and construction, poured joint seals, cold plane pavement removal, dense asphalt concrete placement, and pavement markings with loop detector installation. Seven contractors submitted bids for the project, with bid closing occurring on March 13, 2025. The bid items encompass quantities ranging from 1 lump sum for mobilization and traffic control to 29,400 linear feet of thermoplastic surface profiling and 27,500 square yards of pavement removal. The tabulation shows individual line item pricing and total costs for each bidder without indicating a recommended award.
The bid tabulation reveals significant pricing variation among the seven bidders, with total project bids ranging from $729,729.00 to $959,797.50. Notably, Kerr Contractors submitted the lowest total bid at $729,729.00, while Northwest S-2 Contractors submitted the highest at $959,797.50. Individual line items show considerable variance in unit pricing, particularly for elastomeric concrete nosing material where one bidder quoted $1,000.00 per cubic foot compared to competitors' quotes of $111.00 to $240.00 per cubic foot. The document explicitly states that the bid tabulation is not an indicator of award and represents only the bids submitted for consideration, with further evaluation required before contract award determination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Equipment Pricing Form.xlsx | XLSX spreadsheet | |
| Bid Coversheet~25.docx | DOCX document | |
| Sample Agreement~8.docx | DOCX document | |
| Exhibit A_Specifications_On Call Electrical.docx | DOCX document | |
| 00012661_Invitation to Bid.docx | DOCX document | |
| Preliminary Bid Results~43.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 3/13/25 | ||||||||
| ITB No. | S-73000-00012662 | BIDDER | |||||||
| NAME: | Knife River Corporation - Northwest | Granite Construction Company | KNL Industries | North Santiam Paving | Brix Paving Northwest | S-2 Contractors | Kerr Contractors Oregon | ||
| Bid Closing: | March 13, 2025 | CITY/STATE: | |||||||
| Description: | OR 213: I205 to Redland Rd Pavement Repair | CCB#: | |||||||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $ 64,000.00 | $ 64,000.00 | $70,000.00 | $ 70,000.00 | $40,000.00 | $ 40,000.00 | $ 64,000.00 | $ 64,000.00 | $ 70,039.00 | $ 70,039.00 | $55,000.00 | $ 55,000.00 | $ 95,000.00 | $ 95,000.00 |
| 2 | Temproary Work Zone Traffic Control, Complete | 1 | LS | $ 59,793.50 | $ 59,793.50 | $66,200.25 | $ 66,200.25 | $100,000.00 | $ 100,000.00 | $ 141,000.00 | $ 141,000.00 | $ 105,000.00 | $ 105,000.00 | $150,000.00 | $ 150,000.00 | $ 127,075.00 | $ 127,075.00 |
| 3 | BRIDGE REMOVAL WORK | 1 | LS | $ 1.00 | $ 1.00 | $10,000.00 | $ 10,000.00 | $7,250.00 | $ 7,250.00 | $ 8,000.00 | $ 8,000.00 | $ 7,500.00 | $ 7,500.00 | $5,000.00 | $ 5,000.00 | $ 10,000.00 | $ 10,000.00 |
| 4 | ELASTOMERIC CONCRETE NOSING MATERIAL | 64 | CUFT | $ 111.00 | $ 7,104.00 | $112.00 | $ 7,168.00 | $115.00 | $ 7,360.00 | $ 111.00 | $ 7,104.00 | $ 230.00 | $ 14,720.00 | $1,000.00 | $ 64,000.00 | $ 240.00 | $ 15,360.00 |
| 5 | CONSTRUCTING ELASTOMERIC CONCRETE NOSING | 380 | SQFT | $ 147.00 | $ 55,860.00 | $148.00 | $ 56,240.00 | $147.00 | $ 55,860.00 | $ 147.00 | $ 55,860.00 | $ 130.00 | $ 49,400.00 | $120.00 | $ 45,600.00 | $ 133.00 | $ 50,540.00 |
| 6 | POURED JOINT SEALS | 1 | LS | $ 29,120.00 | $ 29,120.00 | $19,500.00 | $ 19,500.00 | $30,000.00 | $ 30,000.00 | $ 29,250.00 | $ 29,250.00 | $ 44,000.00 | $ 44,000.00 | $15,000.00 | $ 15,000.00 | $ 34,630.00 | $ 34,630.00 |
| 7 | COLD PLANE PAVEMENT REMOVAL, 2 INCHES DEEP | 27,500 | SQYD | $ 4.15 | $ 114,125.00 | $2.20 | $ 60,500.00 | $3.00 | $ 82,500.00 | $ 3.05 | $ 83,875.00 | $ 3.50 | $ 96,250.00 | $3.00 | $ 82,500.00 | $ 3.00 | $ 82,500.00 |
| 8 | LEVEL 3, 1/2 INCH DENSE ACP | 3,100 | TON | $ 100.00 | $ 310,000.00 | $118.00 | $ 365,800.00 | $120.50 | $ 373,550.00 | $ 104.00 | $ 322,400.00 | $ 135.00 | $ 418,500.00 | $126.00 | $ 390,600.00 | $ 148.00 | $ 458,800.00 |
| 9 | MONO-DIRECTIONAL WHITE TYPE 1AR MARKERS | 345 | EACH | $ 8.50 | $ 2,932.50 | $8.55 | $ 2,949.75 | $8.50 | $ 2,932.50 | $ 9.00 | $ 3,105.00 | $ 8.60 | $ 2,967.00 | $11.00 | $ 3,795.00 | $ 8.50 | $ 2,932.50 |
| 10 | BI-DIRECTIONAL YELLOW TYPE 1AR MARKERS | 360 | EACH | $ 8.50 | $ 3,060.00 | $8.55 | $ 3,078.00 | $8.50 | $ 3,060.00 | $ 8.50 | $ 3,060.00 | $ 8.60 | $ 3,096.00 | $11.00 | $ 3,960.00 | $ 8.50 | $ 3,060.00 |
| 11 | THERMOPLASTIC, EXTRUDED, SURFACE, PROFILED | 29,400 | FOOT | $ 1.72 | $ 50,568.00 | $1.75 | $ 51,450.00 | $1.72 | $ 50,568.00 | $ 1.80 | $ 52,920.00 | $ 1.75 | $ 51,450.00 | $2.20 | $ 64,680.00 | $ 1.75 | $ 51,450.00 |
| 12 | PAVEMENT LEGEND, TYPE B-HS: ARROWS | 11 | EACH | $ 400.00 | $ 4,400.00 | $404.00 | $ 4,444.00 | $400.00 | $ 4,400.00 | $ 400.00 | $ 4,400.00 | $ 425.00 | $ 4,675.00 | $500.00 | $ 5,500.00 | $ 400.00 | $ 4,400.00 |
| 13 | PAVEMENT BAR, TYPE B-HS | 100 | SQFT | $ 22.00 | $ 2,200.00 | $22.25 | $ 2,225.00 | $22.00 | $ 2,200.00 | $ 22.00 | $ 2,200.00 | $ 23.00 | $ 2,300.00 | $30.00 | $ 3,000.00 | $ 22.00 | $ 2,200.00 |
| 14 | LOOP DETECTOR INSTALLATION, QTY 23 | 1 | LS | $ 26,565.00 | $ 26,565.00 | $13,000.00 | $ 13,000.00 | $30,000.00 | $ 30,000.00 | $ 21,850.00 | $ 21,850.00 | $ 28,000.00 | $ 28,000.00 | $35,000.00 | $ 35,000.00 | $ 21,850.00 | $ 21,850.00 |
| TOTAL | $ 729,729.00 | $ 732,555.00 | $ 789,680.50 | $ 799,024.00 | $ 897,897.00 | $ 923,635.00 | $ 959,797.50 |