Prelim Plans_AK PRA DENA 10(36).pdf
PDF 16 MB Posted
- Attached to
- AK PRA DENA 10(36), Replace Ghiglione Bridge Federal contract opportunity
- Solicitation number
- 69056725B000009
About this file
This is a comprehensive set of design and construction documents for the Ghiglione Creek Bridge replacement project in Denali National Park, Alaska, sponsored by the National Park Service and Federal Highway Administration. The project involves replacing an existing bridge on the Denali Park Road with a new 180-foot-long curved steel girder bridge located between mile posts 807+60 and 809+40. Key technical details include:
The project scope encompasses bridge demolition, new bridge construction, roadway work, and associated infrastructure improvements. The new bridge will use W33x118 steel girders, concrete-filled steel pipe piles, structural concrete, and a steel tube-backed timber bridge railing. The design accommodates a curved alignment with a 150-foot radius and includes detailed specifications for foundation work, deck construction, drainage, erosion control, and permanent traffic control signage. The estimated construction will involve approximately 230 cubic yards of structural concrete, 137,000 pounds of structural steel, and significant earthwork and aggregate placement. The project is funded through the National Park Service and will be constructed using Federal Highway Administration standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PROJECT DESCRIPTION_AK PRA DENA 10(36).pdf | ||
| Prelim Letter_AK PRA DENA 10(36).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Location
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
INDEX TO SHEETS
PROJECT MANAGER
PLANS FOR PROPOSED PROJECT
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
NATIONAL
PARK
SERVICE
Department of the Interior
CEAN
OCITCRA
i r e B n g ea S
PACIFIC OCEAN
Gulf of A la k a s
Dillingham
Bethel ANCHORAGE
Homer
King Salmon
Kodiak
Valdez
Tok YUKON
WHITEHORSE
JUNEAU
Unalaska
Kotzebue
Nome
FAIRBANKS
Barrow
S
IB
E R
IA
C A
N A
D A
U N I T
E D S
T A
T E S
BC
PARK
NATIONAL
DENALI
NAT'L PARK
ST. ELIAS
WRANGELL-
NAT'L PARK
LAKE CLARK
N.P.
FJORDS
KENAI
NAT'L PARK
THE ARCTIC
GATES OF
N.P.
VALLEY
KOBUK
PRESERVE
KATMAI N.P.
NAT'L PARK
GLACIER BAY
ALASKA KEY MAP
k u
Y o n
R
UNI
TE
D
STATE
S
RUSS
IA
ALASKA
DENALI BOROUGH
on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
N
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
B. STOKES
NPS PMIS. NO. 335520
AK PRA DENA 10(36)
REPLACE GHIGLIONE BRIDGE
DENALI NATIONAL PARK AND PRESERVE
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
e (max)
V
ADT (2038)
ADT (2018)
APPROVED:
DATE
DATE
DATE
National Park Service
Regional Director, Alaska Region, Western Federal Lands Highway Division
Chief of Engineering, OPTION X - 1 Site
BASE LENGTH 0.201 MILES
SCALE IN MILES
25 50 7525 100
HIGHWAY
DENALI
HIGHWAY
RICHARDSON
HIG
HWAYGLENN
HIGHWAY
ALASKA
Anchorage
Fairbanks
Richardson
Big Delta
Hot Springs
Manley
Kokrines
Ruby
Telida
Nikolai
Farewell
Lime Village
Tyonek
Susitna
Skwentna
Montana
Palmer
Chickaloon
Glennallen Gulkana
Chistochina
Paxson
Healy
PRESERVE
AND
DENALI N.P.
McGrath
Poorman Minchumina
Lake
Lake
Tazlina
PROJECT LOCATION
AK PRA DENA 10(36)
Denali Park Road and roadway aggregate excavation, bridge demolition, Bridge construction drainage, A.1
STATE PROJECT
NUMBER
SHEET
D e f a u lt c p w w o r k
\d
\d e n a a a .d g n
AK PRA DENA 10(36)
:2
P
M a y
K
H a rr is o n R
M e a d o w s /2
/2
C h e c k e d b y
D e s ig n e d b y
6%
20 MPH
< 100
< 100
Denali National Park and Preserve
Superintendent, I. PERMANENT TRAFFIC CONTROL
H. TEMPORARY TRAFFIC CONTROL
G. BRIDGE PLANS
F. DRAINAGE
E. EROSION CONTROL
D. PLAN-PROFILE
C. TYPICAL SECTION
B. SUMMARIES
A. GENERAL INFORMATION
I.2-I.6
I.1
H.2-5
H.1
G.1-29
F.6
F.2-5
F.1
E.4-6
E.2-3
E.1
D.5
D.4
D.3
D.2
D.1
C.2
C.1
B.1-4
A.4
A.3
A.2
A.1
PERMANENT TRAFFIC CONTROL STANDARD DETAILS
AND PLAN
PERMANENT TRAFFIC CONTROL QUANTITIES
STANDARD DRAWINGS
TEMPORARY TRAFFIC CONTROL
QUANTITIES
TABULATION OF TEMPORARY TRAFFIC CONTROL
BRIDGE PLANS
RIPRAP ENERGY DISSIPATOR DETAILS
STANDARD DRAWINGS
TABULATION OF DRAINAGE QUANTITIES
EROSION CONTROL STANDARD DRAWINGS
EROSION CONTROL PLAN
TABULATION OF EROSION CONTROL QUANTITIES
SURVEY CONTROL
GRADING PLAN
RIPRAP DETAILS
PLAN-PROFILE
TABULATION OF PLAN AND PROFILE QUANTITIES
TOKLAT PIT OPERATION PLAN
TYPICAL SECTION
SUMMARY OF QUANTITIES
TOKLAT RIVER MATERIAL SOURCE
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
NPS Drwg. No. 184/196968
NPS PMIS No. 335520
PRELIM
IN
ARY N
OT
FOR C
ONSTRUCTIO
N tyler.yeoman Sticky Note Completed set by tyler.yeoman tyler.yeoman Sticky Note Completed set by tyler.yeoman tyler.yeoman Sticky Note Completed set by tyler.yeoman
Ll total central angle M.L. main line Llc curve central angle M.P. mile post diameter mat/. material es spiral central angle max. maximum abut. abutment MGAL thousand gallon
ADT average daily traffic min. minimum
AH ahead mon. monument appr. approach N north
BK back NC normal crown
BM bench mark O. C. on center BP balance point o. to o. out to out
br. bridge OD outside diameter brg. bearing OG original ground cc or c. to c. center to center PC point of curve centerline PCC point of compound curve cir. clear PCS point of curve to spiral CMP corrugated metal pipe PI point of intersection col. column pl. plate cone. concrete POC point on curve conn. connection POS point on spiral constr. jt. construction joint POT point on tangent cont. continuous PS point of tangent to spiral point of curve to spiral PSC point of spiral to curve ctrs. centers PST point of spiral to tangent CUFT cubic foot (feet) PT point of tangent cu/v. culvert pvmt. pavement CUYD cubic yard(s)
R radius D diameter R. range DHV design hourly volume R/W right-of-way dia. diameter rdwy. roadway diag. diagonal reinf. reinforcement diaph. diaphragm reqd. required dist. distance rt. or RT right drwg(s). drawing(s) rte. route
E east s south e superelevation rate SADT seasonal average daily traffic El. 94.16 ft elevation with number SC point of spiral to curve elev. elevation sec. section emb. embankment shldr. shoulder edge of pavement SLRY slurry unit EQ or eq. equation spa. spacing, spaces or spaced edge of road SQFT square foot EW edge of water SQYD square yard exc. excavation SRS point of spiral to reverse spiral exp.jt. expansion joint 55 point of spiral to spiral (no curve) fin. finish ST point of spiral to tangent fig. flange STA, Sta. station std. standard ft2 square foot stgr. stringer ft3 cubic foot (feet) stiff. stiffener ftg. footing :i struc. structural
ga. gage (gauge) STS point of spiral to tangent spiral e.
C:
galv. galvanized sym. symmetrical
T tangent distance "C hdwl. headwall "'1 hex. hexagon T. township
HW high water TBM temporary bench mark 0 thd. thread 0 ID inside diameter TS point of tangent to spiral"' C:
jt. joint Ts tangent distance (spiraled curve):5!-typ. typical st L length of curve � V design speed st lam. lamination 0 vph vehicles per hour :5!- lat. latitude � LNFT linear foot (feet) VPI vertical point of intersection long. longitudinal � w west LPSM lump sum Ls length of spiral yd2 square yard It. or LT left yd3 cubic yard(s) LW low water
NOTE:
"" 1. Other symbols used in the plans will be shown in a legend 0 on the appropriate plan sheet. N N st
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
¼ Section Line
¼ Section Corner (Found, Projected)
½6 Section Line
½6 Section Corner (Found, Projected)
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Fiber Roll or Wattle
Silt Fence
Intermittent Drainage or Small Creek
1 6
1 6
15 15
22 22
1\, SEC. SEC.
--P/L P/L
( 400 )
/ / / / / NP / / / / / / '/ / /////NI
/ / / / NWR / / / NWR // NWR /
--------■-----■-----■1----
Large Creek or River
Lake, Pond or Reservoir; Marshland
C) -i-4- 4-
Spring or Seep
Treeline; Individual Trees
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Control Point (Terrestrial and GPS); Jump Hub
X X
CP GPS
G W f f
JH
STATE
AK
North Arrow
EXISTING
PROJECT
PRA DENA 10(36)
NPS PMIS No. 335520
NPS Drwg. No. 184/196968
PROPOSED
SHEET
NUMBER
A.2
Slope Stake Limits Top of Cut Toe ofFi/1 ---- Transition
Fence
Gate with Fence
Cattleguard
Guardrail
Concrete Barrier
Retaining Wall
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
Overhead/ Above Ground Utilities
Underground Utilities
)E-- -X---)( )()( x-----------¾: ::: -::: �
0-- ---u-- ---u-- ■ ■ wall face -�v�-�v�-�v-- --,.----• • u u-u f-----�
J--------i
1UDf
---P-
- - -----, w I--
---.- .-. IT
---------! U D f-----
P----
-----1W----
FM = force main, FO = fiber optic, G = gas, IRR = irrigation, 0 = oil, P = power, SA = sanitary sewer, SD = storm drain, 55 = storm sewer, STEAM= steam, T = telephone, TV= CATV, W = water
Poles (Power, Telephone, Joint Use, ----c::::J---- ---0--- ----CTD----
Light, Support w/Anchor) --¢- ---o--1 �
Miscellaneous Utility Features T
EM = electric meter, T = telephone pedestal, TV= CATV pedestal, UP = transformer or junction box, WF = water fountain
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
NO SCALE
L 1 I
---0- - r/w
- - - - P/E
- no symbol -
--•---RIW--
--PIE-----
--TCE-----
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
U.S. CUSTOMARY DETAIL
PLAN SYMBOLS
AND ABBREVIATIONS
DETAIL APPROVED FOR USE 11/2001 DETAIL
REVISED: 9/2005 1/2007 10/2009 10/2014
Wl0l-1
.ci
Q)
"' a, N t.
cs
EP
ER
<XXX>O<X>O<>O<X>O<YXXXXX>O<XXXXXXXXXX;
VVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVV'
~ ----u
-------1:$±!------,pz-- z
I I
~1----I ---------<( u
I
I
PRELIM
IN
ARY N
OT
FOR C
ONSTRUCTIO
N
L ittle
S to n y
Mt. Galen
T o k la t
R iv e r
S to n y
C re e k kro F e s o oM k e er C
SCALE IN MILES
1 21
Thorofare
To Healy 52 miles
Mtn. Bar
Copper
Den ali
Par k
Ro ad
De na li
Park Ro ad
East
F o rk
T o k la t
R iv e r
C k
Eielson Visitors Center
Overlook
Mountain
Polychrome
Pass
Thorofare
Overlook
Stony Hill
Pass
Highway
Hill
Stony
MP 53.88
Toklat Road Camp
Staging/Water Source
Toklat Pit Material/ MP 41.9
LOCATION
PROJECT
River
C re e k
Gorge
Moose
C re ek
D E N A L I N A T I O N A L P A R K
N
VICINITY MAP
A.3
STATE PROJECT
NUMBER
SHEET
D e f a lt p w w o r k
\d
\d e n a a c .d g n
AK PRA DENA 10(36)
:5
J u n e
/2
/2
C h e c k e d b y
B V in c e n t
P E
D e s ig n e d b y
R J M e a d o w s P
E
NPS Drw. No. 184/196968
NPS PMIS No. 335520
See A Sheets
Option X, Toklat River material source
PRELIM
IN
ARY N
OT
FOR C
NO SCALE
Storage pit
Approximate mining area
Approximate mining progression
A.4
STATE PROJECT
NUMBER
SHEET
AK PRA DENA 10(36)
/2
/2
C h e c k e d b y
B V in c e n t
P E
D e s ig n e d b y
R J M e a d o w s P
E signs, streams, and other park resources; and to prevent erosion and material loss.
damaging road surfaces, ditch lines, culverts, adjacent vegetation adn features along the roadway, Snow removal west of MP 43.4 is the Contractor's responsibility. Perform snow removal without east of MP 43.4 during the month of November.East Fork Bridge at MP 43.4 between April 8 and October 30. The contractor may perform snow removal
Denali National Park will perform snow removal for public access up to theSection 156.05(c):6.
normal wildlife etiquette procedures. can continue without stopping. If wildlife are still on the roadway at 1:10pm, drivers will follow 1:10pm (a three-minute wait). If a vehicle arrives at a wildlife crossing at 1:10pm, the vehicle crossing at 1:07pm, the vehicle will stop and reamin queued at a wildlife crossing sign until wildlife crossing sign until 1:10pm (a ten-minute wait). If a vehicle arrives at the wildlife Creek. For example, if a vehicle arrives at 1:00pm, the vehicle will stop and remain queued at theevery hour at the wildlife crossing signs located at MP 21.6 (Hogan Creek) and MP 37.6 Tattler
East bound and west bound traffic must stop for the first ten minutes ofSection 108.01(d):5.
along the Denali Park Road. The area available for the contractor's use is outlined in the Plans.Mile 5 Pit located at MP 5.6 along the Denali Park Road and Teklanika Pit located at MP 27
A construction camp/housing facility may be established at Section 107.12 Contractor Housing:4.
a. Limit blasting to occur between 8:00 a.m. and 8:00 p.m.
Section 107.10 Environmental Protection (blasting):3.
c) MP 5 Pit, estimated 3,000 cuyd.b) Teklanika Pit Mp 27 of Denali Park Road, 300 cuyd.a) Mp 42 of Denali Park Road (adjacent to the Ghiglione Bridge), 200 cuyd.of accessing the slide.assist with accessing the slide. The material volume may not be sufficient to be the only means 2) Unprocessed aggregate material is available at the following locations and may be used to meets the material requirements outlined in Subsection 703.05.
a. Government-provided material stockpile. Add the following:
Section 105.02 Material Sources (aggregate material):2.
Vehicles greater than 22 feet long, 8 feet wide, and 12Section 101/104/108 Oversized Vehicles:1.
DESIGNATED MINING AREA
TOKLAT RIVER FLOODPLAIN
OPTION X
MATERIAL SOURCE
TOKLAT RIVER
NPS PMIS No. 335520 NPS Drwg No. 184/196968
M a te r ia l S o u r c e s p w w o r k \d
\D
E N
A A g g S c r a p e .d g n
PRELIM
IN
ARY N
OT
FOR C
NPS PMIS NO. 335520 NPS Drwg No. 184/196968
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I
TYPICAL
SECTION
PLAN-
PROFILE
EROSION
CONTROL DRAINAGE BRIDGE
PLANS
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BID
SCHEDULE
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0030 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0040 15401-0000 CONTRACTOR TESTING LPSM ALL
A0050 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0060 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 519 31 550
A0070 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 2382 118 2500
A0080 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 2 2 4
A0090 20101-0000 CLEARING AND GRUBBING ACRE 1.3 0.1 1.4
A0100 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0110 20304-2000 REMOVAL OF BRIDGE LPSM ALL
A0120 20401-0000 ROADWAY EXCAVATION CUYD 1276 124 1400
A0130 20403-0000 UNCLASSIFIED BORROW,(GOVERNMENT FURNISHED) CUYD 1120 80 1200
A0140 20702-0300 GEOTEXTILE FILTER, CLASS 1, TYPE C,(NON-WOVEN) SQYD 473 572 55 1100
A0150 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 410 410
A0160 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3,(GOVERNMENT FURNISHED) CUYD 70 507 52 629
A0170 25120-0200 RIPRAP DITCH, METHOD A, CLASS 2,(GOVERNMENT FURNISHED) LNFT 433 37 470
A0180 30201-2000 ROADWAY AGGREGATE, METHOD 2,(GOVERNMENT FURNISHED) CUYD 830 80 910
A0190 55101-0200 CONCRETE FILLED STEEL PIPE PILE, IN PLACE,(18-INCH X
0.5-INCH)(GOVERNMENT FURNISHED PILE) LNFT 1258 1258
A0200 55104-1000 DYNAMIC PILE LOAD TEST EACH 5 5
A0210 55116-0000 SPLICE,(18-INCH DIAMETER) EACH 20 20
A0220 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 230 230
A0230 55401-1000 REINFORCING STEEL LB 20200 20200
A0240 55401-2000 REINFORCING STEEL, EPOXY COATED LB 44500 44500
A0250 55502-0000 STRUCTURAL STEEL, FURNISHED, FABRICATED, AND ERECTED LB 137000 137000
A0260 55601-1400 BRIDGE RAILING, TIMBER, STEEL-BACKED LNFT 388 388
A0270 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 40 40
A0280 60201-0800 24-INCH PIPE CULVERT LNFT 173 12 185
A0290 61103-1600 24-INCH ENCASEMENT PIPE, POLYVINYL CHLORIDE (PVC),(PILE SLEEVE) LNFT 180 180
A0300 61707-2000 STRUCTURE TRANSITION RAILING, SBT SYSTEM LNFT 40 40
A0310 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY HOUR 40
A0320 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY HOUR 40
A0330 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER HOUR 40
A0340 62201-2050 ROLLER HOUR 40
A0350 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 40
A0360 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 40
A0370 62301-0000 GENERAL LABOR HOUR 40
A0380 62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH ACRE 0.6 0.1 0.7
PAY ITEM
NUMBER
LINE
ITEM
NO.
ht tp s:
us do t-m y.
sh ar ep oi nt
.c om
/p er so na l/ ty le r_ ye om an _a d_ do t_ go v/ D oc um en ts
/T yl er 's
D oc um en ts /P
R O
JE
C
TS
/A
LA
SK
A/
AK
P
R A
D
EN
A
(3 6)
R ep la ce G hi gl io ne
B ri dg e/
[m w
-s um m ar y-qu an tit ie s.
xl sm
]S he et
-J ul
-2
4:
P
M
A M E N D
SUMMARY OF QUANTITIES
FINAL
Remarks and/or Determination of
Estimated Quantity
Estimated Quantities
ALLOW-
ANCEUNITPAY ITEM DESCRIPTION
PROJECT
B.1AK PRA DENA 10(36)
SHEET
NUMBER
PRELIM
IN
ARY N
OT
FOR C
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I
TYPICAL
SECTION
PLAN-
PROFILE
EROSION
CONTROL DRAINAGE BRIDGE
PLANS
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BID
SCHEDULE
A0390 62515-1000 MULCHING, DRY METHOD,(Placing conserved mulch) ACRE 1.3 1.3
A0400 63302-0000 SIGN SYSTEM SQFT 17 17
A0410 63308-2000 OBJECT MARKER, TYPE 2 EACH 4 4
A0420 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
A0430 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 45 15 60
A0440 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 4 4
A0450 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 127 13 140
A0460 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 800 50 850
A0470 63704-0000 VEHICLE EACH 2
A0480 63708-0000 CELLULAR PHONE SERVICE MO 18
A0490 63713-0000 FIELD OFFICE SERVICES,(INTERNET) MO 18
ALLOW-
ANCE
Estimated Quantities Remarks and/or
Determination of Estimated Quantity ht tp s:
us do t-m y.
sh ar ep oi nt
.c om
/p er so na l/ ty le r_ ye om an _a d_ do t_ go v/ D oc um en ts
/T yl er 's
D oc um en ts /P
R O
JE
C
TS
/A
LA
SK
A/
AK
P
R A
D
EN
A
(3 6)
R ep la ce G hi gl io ne
B ri dg e/
[m w
-s um m ar y-qu an tit ie s.
xl sm
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
LINE
ITEM
NO.
-J ul -2
4:
P M
FINAL
PAY ITEM
NUMBER PAY ITEM DESCRIPTION UNIT
PROJECT
B.2AK PRA DENA 10(36)
SHEET
NUMBER
PRELIM
IN
ARY N
OT
FOR C
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I
TYPICAL
SECTION
PLAN-
PROFILE
EROSION
CONTROL DRAINAGE BRIDGE
PLANS
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BID
SCHEDULE
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0060 15401-0000 CONTRACTOR TESTING LPSM ALL
X0080 31402-0000 STOCKPILED AGGREGATE,(SELECT BORROW) CUYD 10100 10100
X0100 31402-0000 STOCKPILED AGGREGATE,(SURFACE COURSE WITH BENTONITE, TOKLAT SCRAPE) CUYD 22200 22200
ALLOW-
ANCE
Estimated Quantities Remarks and/or
Determination of Estimated Quantity ht tp s:
us do t-m y.
sh ar ep oi nt
.c om
/p er so na l/ ty le r_ ye om an _a d_ do t_ go v/ D oc um en ts
/T yl er 's
D oc um en ts /P
R O
JE
C
TS
/A
LA
SK
A/
AK
P
R A
D
EN
A
(3 6)
R ep la ce G hi gl io ne
B ri dg e/
[m w
-s um m ar y-qu an tit ie s.
xl sm
]S he et
3) SUMMARY OF QUANTITIES - Option X
A M E N D
LINE
ITEM
NO.
-J ul -2
4:
P M
FINAL
PAY ITEM
NUMBER PAY ITEM DESCRIPTION UNIT
PROJECT
B.3AK PRA DENA 10(36)
SHEET
NUMBER
PRELIM
IN
ARY N
OT
FOR C
C le a r in g l im it
0.25 D
Existing ground
Va ria ble
D
NO SCALE
[1]3% [1]3%
Profile grade point
Va rie s
1V:2H
Existing ground
Existing ground
CONNECTION DETAIL
DENALI PARK ROAD
Existing surface
803+00 and 813+60
809+40 to 813+60
803+00 to 807+60
LC
s ta k e
S lo p e s ta k e
S lo p detail rounding
See fill slope
5'-0'5' li m it o n s tr u c ti o n
[4]Embankment p r o f il e
M a tc h method 2 (government Furnished) Roadway aggregate, [3]8" compacted depth
(government furnished)
Roadway aggregate, method 2
V ar ie s
FOOTNOTE:
C o n s tr u c ti o n l im
[2]Varies le a r in g l l le a r in g topsoil, 2" depth
Placing conserved
ROUNDING DETAIL
FILL SLOPE
(placing conserved mulch)
Mulching, dry method[2]Varies
Slope stake
5'
Traveled way
12'
Traveled way
12'
See Sheet C.2.
Use stockpile pile number 4 or other material identified by the CO.[4]
Use surface aggregate stockpile pile number 5. See Sheet C.2.[3]
Construction limit varies, see Sheets D.2 and D.4.[2] sections.
Superelevate roadway at the rate 'e' as indicated on the cross[1]
:1 a y
T
Y P
IC
A
L S
E C
T
IO
p w w o r k \d
\d e n a c a .d g n
TYPICAL SECTION4
:1 a y
T
Y P
IC
A
L S
E C
T p w w o r k \d
\d e n a c a .d g n
TYPICAL SECTION
STATE PROJECT
NUMBER
SHEET
AK PRA DENA 10(36) C.1
STATE PROJECT
NUMBER
SHEET
C.1
NPS PMIS No. 335520 NPS Drwg No. 184/196968
PRELIM
IN
ARY N
OT
FOR C
LEGEND:
NOTE:
SCALE IN FEET
50 100 150 200050
3.
2.
1.
proposed and existing stockpiles.
Stack processed material to limit the footprint of the processed select borrow stockpile.
The CO will verify the location for the proposed and equipment staging will be determined by the CO.
The final location of all stockpiles, contractor housing, parking material processing area
Proposed contractor or structures
Existing materials for processing
10,100 CUYDS pit run material
2 4
1 8 material processing area
Proposed contractor staging area
Contractor staging area
Contractor
Contractor Housing Area stockpile location
Proposed Select Borrow
:3
J u ly
T O
K L
A T
P
IT
O P
E R
A T
IO
N
P L
A p w w o r k \d
\d e n a c b .d g n
TOKLAT PIT OPERATION PLAN
STATE PROJECT
NUMBER
SHEET
AK PRA DENA 10(36) C.2
NPS PMIS No. 335520 NPS Drwg No. 184/196968
PRELIM
IN
ARY N
OT
FOR C
:3
O c to b e r
T A
B U
L A
T p w w o r k
\d
\d e n a d a .d g n
PLAN AND PROFILE QUANTITIES
TABULATION OF
STATE PROJECT
NUMBER
SHEET
AK PRA DENA 10(36) D.1
NPS PMIS No. 335520 NPS Drwg No. 184/196968
PRELIM
IN
ARY N
OT
FOR C
�rnes �0/ In � �ary
Placed riprap, method A, cl
Placed riprap, method A, class 3 (Government fur ·sme
END PRO _ _ - : • 'it�t:rt �P.
AK PRA DENA t
--a' 1 \ m.en
Construct
8l ·· ···· N=349 - __, E=l '
24" Pipe Culvert e
Construction Limi s rap, method A, overnment furnished)
NPS PMIS No. 335520
STATE
NPS Drw No. 184/196968
PROJECT SHEET
NUMBER
AK PRA DENA 10(36) D.2
idge 807+00 to 810+00 Stake Wilderness Boundary
UI
ap, method A, class 3 ent furnished)
,, CRTJ
Riprap ditch, method A, class 2
(Government furnished)
PI 803+15.27
t:,. = 02°05'46" (LT) R = 2,000.00' T = 36.59' L=73.17'
OJ 0
ul U'I U'I
BEGIN PROJECT
AK PRA DENA
10(36) 803+00
E= El=3397.13
N=3492184.6631 1680051.5577
3 380 ----·-······· ............ . i i i �EGIN Bridge -i -· · · · · · · · · ·
S -07+60- ·
· · · · · 3 380 3 400
3,400
END PROJECT
AK PRA DENA 10(36)
81:3+60
3 370
N=3492�89.4880 E= 1680042.6722
El;:3360.51
HLSD = 437.32'
K = 50
130' VC :\,olo 'p�
813+00
ON 0 00
N O'I .-I ID
00 �
SSD = 291. 73'
K = $3.64
180'.
vc
812+00
END BRIDGE •
809+40
811+00 810+00 809+00 808+00
HLSD :;:: 121.25'
K � 17
100' vc
807:f-O0 t'.QJ 0 2:0 ::J +u ID = Ost 00 N
3 350 3 370 806+00
"-- Existing: ground
805+00 804+00
3 390
3 380
3 370 803+00
:,: :Exe CUYD N:
� �MB CUYD 1120
N •
" _ci i' I---"~ =¥ 0 .
C .
K g
3 350
14+00 t:
(lJ
0 .2:
LI') ::J
+u M= .... st
J D 3+6
2189.48 680'0'42.67
El=336 '
Wilderness bound~r,'
.. ·:- ...................... . . ·- · -- :·..:.;· ._,.,... ---.,-0~~-0~-~5£.00~D~Vo~:-:"."'.'.":'":":~ ~-:-:-:-~7~~~~~3~~~~~~_:~~~~~~~~1!~~--=-i~I r--~rr - ~ ... - . - . - . - . . . . . - .. - . - - . - . - . - . - . . . . . . . - - . - . - . -: . - . . . . ... - - - - - . - . - . - . . . . :- .. - . - - - - -1
Profile grade
3 370 3 390 LO in .......... _.,;;_...;;;....+-..::..r..:.=.::~
:t:
' Q)
0 :.2:
o · ::i + :u .... ·-.... :~
CD ·N
CJ) {'I')
\ ~ j g Pcoposed b,;dge
\_ : See G sheets
Proposed embankment
-0 n (tJ N -.J (tJ ·o, (tJ
PRELIM
IN
ARY N
OT
FOR C
Aggregate shoulder Existing ground
\ Riprap ditch, method A, class 1 (Government furnished) _,, Geotextile filter, class 1, 4, _ 8, Varies type C (non-woven)
[1]
RIPRAP DITCH DETAIL
803+00 to 807+40
Profile grade
I
RIPRAP BLANKET DETAIL
805+90 to 806+10
806+50 to 806+90
810+90 to 811 +10
813+40 to 813+60
NPS PMIS No. 335520 NPS Drw No. 184/196968
STATE PROJECT
AK PRA DENA 10(36)
Slope stake limit r Ex;st;ng ground
Geotextile filter, class 1, type C, nonwoven
Placed riprap, method A, class 3 (government furnished)
Bottom of ditchline
NOTE:
1. Mirror details as appropriate.
FOOTNOTE:
r11 Place conserved topsoil above riprap ditch.
RIPRAP DETAILS
SHEET
NUMBER
D.3
;_;L_--------~--, PRELIM
IN
ARY N
OT
FOR C
PRELIM
IN
ARY N
OT
FOR C
POINT
NUMBER NORTH EAST ELEVATION DESCRIPTION
2997 93102.962 81171.338 3435.333 5/8" IR w/RPC
2998 93234.737 80664.009 3421.876 5/8" IR w/RPC
GHIG1 92975.896 80709.948 3373.364 5/8" IR w/FHWA Alum Cap
PROJECT : Ghiglione Bridge Replacement PROJECT UNITS : US SURVEY FOOT COORDINATE SYSTEM : scaled to project datum
VERTICAL DATUM : NAVD88 GEOID06
Bridge Ground Coordinates NOTE:1 to convert from bridge ground coordinates to project State plane coordinates (grid) add 3,400,000.000 to the northing and 1,600,000.000to the easting then multiply by the average combined scale factor of .999739223607
Grid Bridge Stationing =807+60-809+39.95 Ground Bridge Stationing=1+00-2+80
NOTE:2
C
M yF ile s\
Pr oj ec ts
_2
0\ Al as ka
\D en al i\
G hi gl io ne \b ri dg e_ co nt ro ls he et
G hi gl io ne _g ro un d_ C on tr ol
Sh ee t_ v2
.x ls x] Sh e
-O ct
-2
3:
P
M W
FL
H
D S ur ve y
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.5
SHEET
NUMBER
PRA DENA 10(36)AK
SURVEY CONTROL
Grid North Grid East Ground North Ground East Grid/Ground station at C/L
Begin Bridge 3492198.761 1680560.907 93109.681 80999.2717 807+60/1+00 End Bridge 3492255.076 1680401.190 93166.0108 80839.5136 809+39.95/2+80
Pier Grid North Grid East Ground North Ground East Grid/Ground station at C/L
Pier 1 3492230.563 1680529.325 93141.4913 80967.6814 808+04.99/1+45 pier1 Pier 2 3492251.614 1680489.757 93162.5484 80928.1031 808+49.98/1+90 pier2 Pier 3 3492260.036 1680445.736 93170.9724 80884.0704 808+94.96/2+35 pier3
Pier Grid North Grid East Ground North Ground East Offset from C/L to Layout Line
Pier 1 3492212.180 1680522.847 93123.1043 80961.2016 ‐19.49 Pier 2 3492226.921 1680481.041 93137.8487 80919.3847 ‐26.19 Pier 3 3492241.654 1680439.257 93152.5852 80877.5902 ‐19.49 r ------i---==---+ +1 ==31= I -r
GPS
+ 2998
N
GPS
-4-
I
GPS
--- II
+ GHIG1
PRELIM
IN
ARY N
OT
FOR C
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
2997 3492192.043 1680732.928 3435.333 63°33'23.579940"N 149°45'09.904860"W 3482.2516 0.99973585 5/8" IR w/RPC 1.
2998 3492323.784 1680225.731 3421.876 63°33'24.896049"N 149°45'21.091444"W 3468.7874 0.99973644 5/8" IR w/RPC
GHIG1 3492065.010 1680271.658 3373.364 63°33'22.346796"N 149°45'20.099296"W 3420.2823 0.99973876 5/8" IR w/FHWA Alum Cap
PROJECT :Ghiglione Bridge Replacement DATE OF FIELD WORK : June 2009 DATE OF FINAL ADJUSTMENT : June 2009
PROJECT UNITS : US Survey Foot COORDINATE SYSTEM : Alaska zone 4 SPCS NAD83 (CORS96)
EPOCH DATE : 2008.000
VERTICAL DATUM : Orthometric Elevations based on the NAVD88 GEOID06a
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
_2
0\ Al as ka
\D en al i\
G hi gl io ne \b ri dg e_ co nt ro ls he et \G ri d_
C on tr ol sh ee t\ [G hi gl io ne
_C on tr ol
S he et
-O ct -2
3:
P M
W
FL
H D
_S ur ve y
W
FL
H D
S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.6
SHEET
NUMBER
PRA DENA 10(36)AK
SURVEY CONTROL
I I
29998
Lr, I I
::; r<S
-4- GH!Gl
I
+ 29997
IJ")
Q)
PRELIM
IN
ARY N
OT
FOR C
.0 i -g C C, 'lii ..
ITcM
15705-0100
15705-1400
15706-0200
TABULATION OF EROSION CONTROL QUANTITIES
DESCRIPTION
SOIL EROSION CONTROL
SILT FENCE
SOIL EROSION CONTROL, ABcR ROLL
SOIL EROSION CONTROL, CHECK DAM
Black Foreground White Background
UNIT
LNFT
LNFT
EACH
QUANTI7-V REMARKS
2,382
(adjust text as needed for specific project Information)
I")
I 3'-6''
I
SWPPP
Permit: 123456789
Contact: Firstfirst Lastlast
BORDER
R = 11/s"
TH; 0%''
fN = O¾,"
Phone: 123-456-7890
I
.- 3"
4"C
3½'1
2½ 11B 1,-- 3"
--- 2''C
-2"
2"C
,-14"
STATE
AK
PROJECT
PAA DENA 10(36)
NPS PMIS No. 335520
NPS Drwg. No. 184/196968
TABULATION OF
EROSION CONTROL
QUANTITIES
SHEET
NUMBER
E.1 .3
D ec em b er
.0
9~ c:
\p w
-w o rl t\ d l4 ,2
\d o n a
3&
.d a, dg o
(U S
.,5 ur l1:
2.
D l
R . M ea do w s rB he ck ed
I(
H ar ris on
3/
2C 1l
PRELIM
IN
ARY N
OT
FOR C
CV)
CV)
I
Wetland Boundary I
I
�-:,-1 I r
I �������,.__ '\
1 Constru t· c ion Limits
Remove ex;,,;,g b,;dge ' I •
LEGEND:
TTTTT
Proposed bridge piling
Check dam
Culvert
Riprap
Water flow arrow
Silt Fence
Fiber Roll
Limits f o construction
\!) C't"\ 0 Oo t<"\
-c
... {\ J_;,o, :s-, 3385' --------
NOTE
1. Place fiber rolls at th d. e ,rection of the CO.
NPS PMIS No. 335520
STATE
NPS Drw No. 184/196968
PROJECT
SHEET
NUMBER
AK PRA DENA 10(36) E.2
BEGIN PROJECT
803+00
EROSION CONTROL PLAN
J u ly
:0 p w
-w o rk \d
\d e n a b .d
;;i n
E R
O S
IO
N
C O
N T
R O
L P
LA
. l
I i
33~ j
I
I I c;
iil <
!l1.
(D a . :E llJ v>u
Y
,i"
'c.
I
~C c, ~½ o o
/2
1.
I
1.
,0
I
,5
A3 fu
~l( J ~ ~
PRELIM
IN
ARY N
OT
FOR C
z z ffi
N u
<Xl s
N
LEGEND:
TTTTT
N
END OF PROJECT
813+60
Line to be constructed
Proposed bridge piling
Check dam
Culvert
Riprap
Water flow arrow
Silt Fence
Fiber Roll
Limits of construction
Wetland boundary
Edge of shoulder
NOTE
1. Place fiber rolls at the direction of the CO.
NPS Drw No. 184/196968 NPS PMIS No. 335520
STATE PROJECT
AK PRA DENA 10(36)
SHEET
NUMBER
E.3
Remove existing bridge
Construction Limits
EROSION CONTROL PLAN
...__ ______________________________________ ___1... ____________ __J
.. .. ·:o
• i .. ,-
PRELIM
IN
ARY N
OT
FOR C
Steel or wood post
~ Silt fence reinforcement
1 Geo textile I I I I I I
Backfilled and compacted soil
I I
POST AND GEOTEXTILE INSTALLATION DETAIL
<lll g.l vi I 'cs I <lll ~I
I I i~•• Nore~-
PLAN
End posts, see End Posts Detail
ELEVATION
END DETAIL
End posts, see End Posts Detail
Limits of clearing
Existing ground (undisturbed)
'<:I-
2:l (lJ (lJ
Ol ro 5} I
Varies
Flow (lJ I ------- !1 ~I ~I I
PLAN
Varies
ELEVATION
SILT FENCE INSTALLATION AT TOE OF FILL
Steel or wood posts driven tightly together.
Tie top of posts together
Geotextile fabric, Section A
PLAN
Staple or tie
Fold geotextile fabric around each post one full turn.
Fasten fabric to posts
POSTS AT .JOINTS
NPS PMIS No. 335520 NPS Drw No. 184/196968
PROJECT
AK PRA DENA 10(36)
NOTE:
1. Alternate preassembled silt fence options will be allowed as long as specified dimensions are satisfied. Follow manufacturer's recommendations for installation procedures.
All types must ensure silt fence remains attached to, and does not slide down, supporting posts.
2. Install silt fence to follow the ground contours as closely as possible.
3. Curve ends of silt fence upgrade to prevent water from running around the ends.
4. 10-foot (max.) spacing with silt fence reinforcement.
6-foot (max.) spacing without silt fence reinforcement.
Steel or wood post
Geotextile fabric
Staple or tie
PLAN
END POSTS DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
WFLHD DETAIL
SILT FENCE
DETAIL APPROVED FOR USE 10/2016
SHEET
NUMBER
E.4
DETAIL
NO SCALE REVISED: W157-1 "'.._ _____________________________________________________________________________________ .._ ______________ .._ ____ _.
PRELIM
IN
ARY N
OT
FOR C
Trench 2" (min.)
Place excavated trench material on uphill side of fiber roll
CROSS SECTION
See Note 5
Fiber roll 9" 0 (min.)
Flow line
Trench 2" (min.)
FIBER ROLL
STAKING DETAIL
PLAN
V-ditch design shown.
Check dam installation details are similar for flat-bottom ditches
FIBER ROLL
CHECK DAM SPACING*
(See Note 7)
DITCH CHECK DAM
GRADE SPACING (max.)
(FT)
2% 150 3% 100 4% 80 5% 60
* Spacing calculated based on 9" 0 minimum fiber roll.
Do not use fiber roll check dams on ditch grades steeper than 5%.
Curve ends upstream to prevent flow around the ends. See Note 6
FIBER ROLL CHECK DAM
Filter rock
Filter rock
V-DITCH
CROSS SECTION
FLAT-BOTTOM DTICH
CROSS SECTION
.s E:
NPS PMIS No. 335520 NPS Drw No. 184/196968
PROJECT
AK PRA DENA 10(36)
NOTE:
1. Construct check dams from fiber rolls, filter rock, or gravel bags as approved by the CO, to meet the functional requirements of the check dam device.
2. Repair all rills or gullies and properly compact prior to installation.
3. Install check dams in ditches perpendicular to the flowline.
4. Stake fiber rolls in place with 1 ¾-inch x 1 ¾-inch wood stakes. Drive stakes at each end of the fiber roll and at 2-foot (max.) spacing.
5. Drive stakes into undisturbed soil of trench bottom.
Expose stakes 2-inches (min.) above top of fiber roll.
6. Provide sufficient length to prevent water from flowing around the ends of the fiber roll.
7. Adjust check dam spacing based on site-specific conditions.
FILTER ROCK
CHECK DAM SPACING
(See Note 7)
DITCH CHECK DAM
GRADE SPACING (max.)
(FT)
2% 150 3% 100 4% 80 5% 60
6% 50 GRAVEL BAG
CHECK DAM SPACING*
SHEET
NUMBER
E.5
FILTER ROCK CHECK DAM (See Note 7)
CROSS SECTION
GRAVEL BAG CHECK DAM
NO SCALE
DITCH CHECK DAM
GRADE SPACING (max.)
(FT)
2% 150 3% 100 4% 80 5% 60 6% 50
* Do not use gravel bag check dams on ditch grades steeper than 6%.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
WFLHD DETAIL
CHECK DAM
MODERATE GRADES
DETAIL APPROVED FOR USE 7 /2016 DETAIL
REVISED: W157-15
PRELIM
IN
ARY N
OT
FOR C
Rolled erosion control product
Filter rock
CROSS SECTION
V-DITCH
Check Dam spacing (S)
Ponded water
Ditch Grade (G) -
PROFILE VIEW
Filter rock
Rolled erosion control product
Rolled erosion control product
Filter rock
FILTER ROCK
CHECK DAM SPACING
(See Note 3)
DITCH MAX. CHECK DAM
GRADE SPACING (S)
(G) (FT)
7% 40 8% and 9% 30
?.10% 20
FILTER ROCK CHECK DAM WITH
ROLLED EROSION CONTROL PRODUCT
CROSS SECTION
FLAT-BOTTOM DITCH
NPS PMIS No. 335520 NPS Drw No. 184/196968
PROJECT
AK PRA DENA 10(36)
NOTE:
1. Repair all rills or gullies and properly compact prior to installation.
2. Install check dams in ditches perpendicular to the f/owline.
3. Adjust check dam spacing based on site-specific conditions.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
WFLHD DETAIL
SHEET
NUMBER
E.6
CHECK DAM WITH ROLLED
EROSION CONTROL PRODUCT
NO SCALE
DETAIL APPROVED FOR USE 7 /2016
REVISED:
DETAIL
W157-16
PRELIM
IN
ARY N
OT
FOR C
10.4 x 16 20301 -1900
20702 -0300
25101 -0300
60201 -0800
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
G
EO
TE
X
TI
LE
F
IL
TE
R
C
LA
S S
TY
PE
C
N
O N
-W O
V
EN
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
(G O
V
ER
N M
EN
T
FU
R N
IS
H
ED
-I
N C H
P
IP
E C U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH SQYD CUYD LNFT Lt Rt 805+27 1
806+00 7 163 22 7 55 GS 2 2 1
807+32 LT 44 44
807+43 RT 59 87
809+00 LT 66 38
809+00 RT 79 52
811+00 7 285 22 7 74 GS 2 2 1
813+50 3 78 22 7 44 GS 2 2 1
PROJECT TOTAL 526 1 314 242 173
Allowable Pipe Material
NOTE: GS Galvanized Steel
1. Steel pipe culvert minimum wall thickness is the larger of _0.064" or the thickness required by the Std. 602-1 fill height table.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\p w
-w or k\ d0
D ra in ag e.
xl sx ]S he et
-M ar -2
3:
P M
R
M ea do w s 5/
B
V in ce nt
5/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.1
SHEET
NUMBER
PRA DENA 10(36)AK
NPS PMIS No. 335520 DRAWING No. 184/196968
Note: The quantities shown hereon are approximate and are subject to field adjustments.
I I I
I I I
---1---
---1---
PRELIM
IN
ARY N
OT
FOR C
NPS PMIS NO 335520 NPS Drwa No 184/196968
PROJECT
SHEET
NUMBER
METAL ROUND PIPE CULVERT AK PRA DENA 10(36) F.2
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT NOTE:
STEEL ALUMINUM 1. When directed, camber pipe culverts upward
PIPE 2½" x ½" CORRUGATIONS 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS PIPE 2½" x ½" CORRUGATIONS 3" x 1" CORRUGATIONS from a chord through the inlet and outlet SIZE MINIMUM METAL THICKNESS (INCH/GAGE) SIZE MINIMUM METAL THICKNESS (INCH/GAGE) inverts an ordinate amount equal to 1 % of the COVER 0.064/16 0.079/14 0.109/12 0.138/10 0.168/8 0.064/16 0.079/14 0.109/12 0.138/10 0.168/8 0.064/16 0.079/14 0.109/12 0.138/10 0.168/8 COVER 0.060/16 0.075/14 0.105/12 0.135/10 0.164/8 0.060/16 0.075/14 0.105/12 0.135/10 0.164/8 DIAMETER DIAMETER pipe length. Develop camber on a parabolic
INCHES INCHES MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) INCHES INCHES MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
12 12 100 100 100 100 100 12 12 100 100 100 100 100 curve. If the midpoint elevation on the
15 12 100 100 100 100 100 15 12 100 100 100 100 100 parabolic curve as designed exceeds the
18 12 100 100 100 100 100 18 12 100 100 100 100 100 elevation of the inlet invert, reduce the amount
21 12 100 100 100 100 100 21 12 88 100 100 100 100 of camber or increase the pipe culvert gradient.
24 12 100 100 100 100 100 24 12 77 97 100 100 100 2. Fill heights exceeding 100 feet require 30 12 85 100 100 100 100 30 12 62 77 100 100 100 71 89 100 100 100 special analysis by the CO.
36 12 71 89 100 100 100 81 100 100 100 100 36 12 52 64 90 100 100 59 74 100 100 100 42 12 61 76 100 100 100 70 87 100 100 100 42 12 44 55 77 99 100 51 64 89 100 100 3. The fill heights in the table are for helical 48 12 53 66 93 100 100 61 76 100 100 100 54 68 95 100 100 48 12 67 87 100 44 56 78 100 100 lockseam and welded seam pipe only.
54 12 59 83 100 100 54 68 95 100 100 48 60 85 100 100 54 18 54 71 88 39 50 69 93 100 Fill heights for culvert pipe with annular 60 12 74 97 100 49 61 86 100 100 43 54 76 98 100 60 18 57 72 35 45 62 83 98 corrugations are more restrictive than those 66 12 87 100 44 55 78 100 100 39 49 69 89 100 66 18 58 32 40 56 76 89 of helical lockseam and welded seam pipe.
72 12 80 97 40 51 71 92 100 36 45 63 82 100 72 18 45 30 37 55 70 82 Obtain approval before furnishing annular 78 12 87 37 47 66 85 100 33 42 58 75 92 78 24 34 48 64 75 corrugation pipe.
84 12 75 35 43 61 78 96 31 39 54 70 86 84 24 44 59 70 90 12 32 40 57 73 90 29 36 51 65 80 90 24 41 62 65 4. For flexible pavement and aggregate surface
96 12 38 53 69 84 34 48 61 75 96 24 38 51 61 roadways, measure minimum cover from the
102 18 36 50 65 79 32 45 57 71 102 24 46 55 top of the pipe culvert to the bottom of the
108 18 47 61 75 42 54 67 108 24 42 50 roadway subgrade. For rigid pavements, 114 18 45 58 71 40 52 63 114 24 45 measure minimum cover from the top of the
120 18 43 55 67 38 49 60 120 24 40 pipe culvert to the top of the pavement.
126 18 52 64 47 57 For all roadway surface types, measure
132 18 50 61 44 54 maximum fill height from the top of the pipe
138 18 48 58 42 52 culvert to the top of the pavement.
144 18 56 50
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
PIPE ARCH 2½" x ½" CORRUGATIONS 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS PIPE ARCH 2½" x ½" CORRUGATIONS 3" x 1" CORRUGATIONS
SIZE
EQUI- MINIMUM
MINIMUM METAL THICKNESS (INCH/GAGE) SIZE
EQUI- MINIMUM
MINIMUM METAL THICKNESS (INCH/GAGE)
VALENT CORNER VALENT CORNER
SPAN x RISE DIAMETER RADIUS COVER 0.064/16 0.079/14 0.109/12 0.138/10 0.168/8 0.079/14 0.109/12 0.138/10 0.168/8 0.079/14 0.109/12 0.138/10 0.168/8 SPANxRISE DIAMETER RADIUS
COVER 0.060/16 0.075/14 0.105/12 0.135/10 0.060/16 0.075/14 0.105/12 0.135/10
INCHES INCHES INCHES INCHES MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) INCHES INCHES INCHES INCHES MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
17 X 13 15 3 12 13 17 X 13 15 3 12 13 21 X 15 18 3 12 12 21 X 15 18 3 12 12 24 X 18 21 3 12 13 24x 18 21 3 12 13 28x 20 24 3 12 13 28x20 24 3 12 13 35x24 30 3 12 12 35x24 30 3 12 12 42 X 29 36 3.5 12 12 42 x29 36 3.5 15 12 49x33 42 4 12 12 49x33 42 4 15 12 57x38 48 5 12 12 57x38 48 5 15 12 60 x46 54 8 15 21 21 60x46 54 8 15 21 64x43 54 6 12 12 64x43 54 6 18 12 66 X 51 60 9 15 21 21 66 X 51 60 9 18 21 71 x47 60 7 12 12 73x55 66 12 18 20 73x55 66 12 18 20 20 81 X 59 72 14 21 17 77x52 66 8 12 12 87x63 78 14 21 17 81 X 59 72 14 18 17 17 95x67 84 16 24 17 83x57 72 9 12 12 103 X 71 90 16 24 17 87 x63 78 14 18 17 17 95x67 84 16 18 17 17 103 X 71 90 16 18 17 17 112 X 75 96 18 21 16 16
117 X 79 102 18 21 16 16 U.S. DEPARTMENT OF TRANSPORTATION, FHWA FLH STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY 602-1 128 X 83 108 18 24 16 16
137 X 87 114 18 24 16 16 SPECIFICATION
142 X 91 120 18 24 16 16 METAL PIPE CULVERT
FP-24, FP-14
APPROVED FOR USE
NO SCALE 8/2024
PRELIM
IN
ARY N
OT
FOR C
COUPLING BANDS FOR METAL PIPE CULVERT r11
MINIMUM BAND WIDTH (INCHES)
CORRUGATION ROUND PIPE PIPE ARCH ANNULAR HELICALLY SEMI-
SIZEf2I DIAMETER SPAN x RISE CORRUGATED CORRUGATED CORRUGATED INCHES INCHES INCHES BANDS f3l BANDS f4l BANDS fSJ
1½ X ¼ underline f5l - 10.5 7 12 to 36 17 X 13 to 42 X 29 7 12
2½ X ½ 42 to 72 49 X 33 to 83 X 57 10.5 12 78 to 84 - 10.5 12
3x1 36 to 72 60 X 46 to 81 X 59 12 14 78 to 144 87 X 64 to 142 X 91 12 14
5x1 36 to 72 60 X 46 to 81 X 59 20 22 78 to 144 87 X 64 to 142 X 91 20 22 r11 Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses thinner than the thickness of the pipe to be connected, and no thinner than 0. 052 inch for steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
¾" for 18" round culvert (21" x 15" pipe arch) or less ½" for 21" round culvert (24" x 18" pipe arch) or more f21 For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
f3J Use annular corrugated bands with pipes having annular corrugations or with helical pipe having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on pipe ends rerolled with 2½" x ½" corrugations. A 12 inch band is acceptable on pipe ends rerolled with 3" x 1 "pipe corrugations.
f4J Use helical corrugated bands with pipes having helically corrugated ends.
10.5
10.5 10.5 10.5 rs1 The minimum band widths shown for 3" x 1" and 5" x 1" corrugated sizes apply to 2½" x ½" corrugations on rerolled pipe ends.
f6J Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Band Angle Rivet, spot weld, or fillet weld at crest Bolts
Band
Oval Lug of corrugation at ~ heel and toe of angle '\
Bar& Strap Angle
NPS PMIS No. 335520 NP Drw No. 184/196968
Band
SLEEVE JOINT
Smoother sleeve with center stop.
Stab type joint
SMOOTH SLEEVE BAND
Bolts
SIDE VIEW
Band
Band w
FLAT BAND
Bolts
SIDE VIEW
PROJECT
AK PRA DENA 10(36)
NOTE:
1. Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for Highway Bridges, Division II Section 26 may be used.
Band w
Continuous corrugation around band meshes with second annular corrugation in pipe end
SIDE VIEW
Rivet, spot weld, or fillet weld at crest of corrugation at heel and toe of angle Bolt, bar and strap connector
Angle
Band
END VIEW
Band
END VIEW
Band
END VIEW
SEMI-CORRUGATED BAND
SHEET
NUMBER
F.3
Wedge and Strap
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Integral Flange
ANNULAR BAND HELICAL BAND
STANDARD BAND CONNECTIONS
NO SCALE
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
OFFICE OF FEDERAL LANDS HIGHWAY
METAL PIPE CULVERT
COUPLING BAND
FLH STANDARD
602-2
SPECIFICATION
FP-24, FP-14
APPROVED FOR USE
1/2024
"'---------------------------------------------------------------------------...J. ___________________ ..J.... _____ ...J
PRELIM
IN
ARY N
OT
FOR C
ABOVE NATURAL GROUND
Finished subgrade ~
-- -- -- ---- l_ -- -- Roadway embankment
" 2H or 12' (max.) C'-J 2H or 12' (max.)
Bedding Natural ground
ON NATURAL GROUND
Finished subgrade ~
Roadway embankment
2H or 12' (max.) ~ 2H or 12' (max.)
ABOVE AND BELOW
NATURAL GROUND
LEGEND:
Bedding material (uncompacted)
Embankment material placed in layers not exceeding 6" compacted depth.
Compacted backfill material placed in layers not exceeding 6" compacted depth; or lean concrete backfill according to Section 614.
Impermeable backfill material.
_ Roadway embankment
2H or 12' (max.) ~i 2H or 12' (max.)
............. ~ ........... ···1#;
1//; ·········~
H
½'1/foot of cover, 12" (min.), 24" (max.)
Remove unyielding material and replace with selected fine compressible material. Lightly compact in layers not over 6" in uncompacted depth.
ON UNYIELDING MATERIAL
BEDDING DEPTH
PIPE SIZE (HJ DEPTH
12" to 54" 4"
> 54" 6"
NPS PMIS No. 335520 NPS Drw . No. 184/196968
PROJECT
SHEET
NUMBER
AK PRA DENA 10(36)
NOTE:
1. When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1 % of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
2. H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
3. See Section 704 for bedding and backfill requirements.
MINIMUM SPACING
DIAMETER
SPACING
F.4
Finished subgrade ~ __ __
~ I Roadway embankment
* Reduce to 18" for trench excavations
See bedding depth table or SPAN
UP to 48" 24"
18" (min.)
in trench excavation
__:j___ 2H or 12' (max.)
Natural ground
Remove unstable material to firm bearing soil and replace
PIPE BEDDING
Metal end section
Half diameter or 48" and UP span or 36", whichever is less
Minimum spacing (see table) with approved granular foundation fill material properly compacted
ON UNSTABLE MATERIAL
Original natural ground surface \
=====77rli== Roadway excavation
L Finished subgrade or embankment height
__ __ before trench excavation
Bedding
Culvert end treatment
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ELEVATION
MULTIPLE PIPE INSTALLATION
Embankment slope
High water elevation
Piping plug
Pipe culvert
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
PIPING PLUG
NO SCALE
SECTION A-A
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
OFFICE OF FEDERAL LANDS HIGHWAY
METAL AND PLASTIC
PIPE CULVERT BEDDING
Metal end section
FLH STANDARD
602-3
SPECIFICATION
FP-14
APPROVED FOR USE
1/2024 ~ ~ ;:!;..__ __________________________________________________________________________ ....., ___________________ ..._ _____
PRELIM
IN
ARY N
OT
FOR C
I I
1:1.5 maximum slope
Cut Slope -{ , raj, L1 ,a~:.J /nle-t __.1--2D_o_r_,..._ ditch at cu 4' f/at bottom
~ i (min.)
Normal ditch line I I
Subgrade shoulder Normal ditch line
Slope at pipe as staked
I I I I ' I
PLAN
Maximum 2D or 1---\-=======:::::::::::::::;=:_"St-;:.~~~=:_:_~=:_~-=----~ subgrade elevation~----7T-:~::-""7"'------'---P..:.__ip_e_c_u_1v_e_rt_~~~J)3
Berm
SECTION A-A
TYPE I
Taper at 10: 1 in rolling or flat terrain. Taper at 5: 1 in mountainous terrain.
Pavement surface
NPS PMIS No. 335520 NPS Drw . No. 184/196968
PROJECT
AK PRA DENA 10(36)
NOTE:
1. D equals the diameter of all round pipe or the rise dimension of all pipe arch culverts.
SHEET
NUMBER
F.5
I I I I f:~UmLl \_I_ Cut Slope I\
Taper at 10: 1 in rolling or flat terrain. Taper at 5: 1 in mountainous terrain
Normal ditch line I
Subgrade shoulder
Normal Original ground ~ cut slope
1/-i\\!/,1, -_77m}A-.:;,: --¼\\Y,- 1//~\"
Slope at pipe as staked
End section
Berm
Flow line of ditch at end section
Ditch widening (See table)
DITCH WIDENING
PIPE SIZE (D) WIDENING
18" 5' 24" 6' 30" 7'
Normal ditch line Standard 45° pipe elbow.
At skewed pipe locations, 22.5° or 30° pipe elbows may be required in lieu of 45° pipe elbow
PLAN
QJ I...
§ QJ
..c: ::i J::l Q
'ti ..c:
"' iii QJ <J
Q 0) < .Q
::i l/)
SECTION 8-8
TYPE II
NO SCALE
Pavement surface
_ __!--------~ Subgrade
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
OFFICE OF FEDERAL LANDS HIGHWAY
PIPE CULVERT INLET
TREATMENT IN CUT SLOPES
FLH STANDARD
602-6
SPECIFICATION
FP-24, FP-14
APPROVED FOR USE
1/2024 "',.._ ______________________________________________________________________________ .._ ___________________________ ...
PRELIM
IN
ARY N
OT
FOR C
,!Ji
Culvert
Placed riprap, method A, class 3 (Government furnished)
Culvert
Placed riprap, method A, class 3 (Government furnished)
10'
- - - l_ --::atextile, filter class 1, type C (non-woven)
PLAN
10'
Placing conserved topsoil, 1" depth
� Geotextile, filter class 1, type C (non-woven)
ELEVATION
RIPRAP ENERGY DISSIPATOR
NO SCALE
NPS PMIS No. 335520 NPS Drw No. 184/196968
STATE PROJECT
AK PRA DENA 10(36)
RIPRAP ENERGY
DISSIPATOR DETAILS
SHEET
NUMBER
F.6 r
PRELIM
IN
ARY N
OT
FOR C
Curve Data:
Ll= 116° 00' 51" (LT) R= 150.00' T= 240.12' L= 303.72' e= 0.054
End Bridge @ Ci. Rdwy.
El. 3371.12
Structure Transition Railing (typ. a/14 corners)
3,390
3,380
3,370
3,360 -----------------------------
3,350 Low Chord El. 3367.1
3,340
3,330 Min. tip El. 3329.0
3,320
3,310
3,300 Est. tip El. 3295.0
Proposed finished ground.
3,290 Abut. 2
Length of Bridge = 180'-0"
45•-0" -------+--------- 45'-0"
6 spa. @ 25'-0"= 150'-0"
·---~ Ii_ Rdwy.
Gutterline (
Layout Line
N70°35'12"W
7 spa. @ 24'-6"= 171 '-6"
El. 3371.45
WINGWALL B
Superelevation Table
Sta. 806+01.49
Sta. 807+50.00
Sta. 809+75.00 f Rdwy.
~ i -5.40%
I f Rdwy.
5 40
- r; 4u0%·10 i +.::.:--
I f Rdwy.
5 40% ,+~
I
Note: Super rotated about Ii_ Rdwy.
Begin Bridge @ Ii_ Rdwy.
Sta. 807+60 El. 3372.02
R, ')
PLAN
Note: Build bridge to dimensions shown in the plans using Begin Bridge as the reference line/point.
Min. tip
Steel tube-backed timber bridge railing
FIX
Q50WS EL 3344.1
18" (Z! x ½" concrete filled steel pipe piles (typ.).
El. 3307.0 Est. tip Min. tip El. 3307.0
El. 3303.0
Est. tip
FIX
-0.5% Grade
FIX
···r Approx. ,x;;aog ground @ CI. Rdwy
Est. & Min. tip El. 3307.0
Pier3 Pier 1 El. 3289.0
Pier 2
1,<:i 1,X -~ ,{,, Steel rolled beam (typ.)
Min. tip El. 3330.0 Est. tip El. 3323.0
24" (Z! PVC pile sleeve.
(typ. @ piers). See RG3147-C for details.
Abut. 1
HYDRAULIC DATA
Q V ws ff3/sec ff/sec. Elev.
16 5.5 3343.5
68 8.3 3344.1
82 8.8 3344.2
117 9.7 3344.4
Note: Water surface elevations are at upstream face of bridge.
Q, 00 scour= 0 (abut.)
= El. 3328.2 (pier)
Qsoo scour = 0 (abut.)
= El. 3327.8 (pier)
Profile Grade
STATE PROJECT
AK PRA DENA 10(36)
DRAWING NO. 'i84/80298
BRIDGE DRAWING INDEX
Drawing No. Description
RG3147-A PLAN AND ELEVATION
RG3147-B GENERAL NOTES AND ESTIMATE
RG3147-C FOUNDATION PLAN
RG3147-D ABUTMENT CAP
RG3147-E ABUTMENT ENDWALL
RG3147-F WINGWALLS
RG3147-G ABUTMENT BEARINGS
RG3147-H PIER 1 & 3 CAP
RG3147-I PIER 2 CAP
RG3147-J PIER 1 & 3 DIAPHRAGM
RG3147-K PIER 2 DIAPHRAGM
RG3147-L PIER BEARINGS
RG3147-M GIRDER FRAMING PLAN
RG3147-N GIRDER SPANS 1 & 4
RG3147-0 GIRDER SPANS 2 & 3
RG3147-P GIRDER DIAPHRAGMS
RG3147-Q GIRDER DETAILS
RG3147-R TYPICAL SECTION
RG3147-S DECK PLAN - TOP
RG3147-T DECK PLAN - BOTTOM
RG3147-U BRIDGE RAILING 1 OF 3
RG3147-V BRIDGE RAILING (2 OF 3)
RG3147-W BRIDGE RAILING (3 OF 3)
SHEET
NO.
G.1
RG3147-X STRUCTURE TRANSITION RAILING
RG3147-Y STRUCT. TRANSITION RAILING DETAILS
RG3147-Z
RG3147-AA
RG3147-BB
RG3147-CC
K = 34 180' vc
REBAR LIST (1 OF 4)
REBAR LIST (2 OF 4)
REBAR LIST (3 OF 4)
REBAR LIST ( 4 OF 4)
1/'1 ,,, ~ N + " <D ,,, 0
,,,- CX)
PROFILE GRADE DIAGRAM
No Scale
Elevations are at profile grade @ € Rdwy.
STRUCTURE #9830-0llP
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
DENALI NATIONAL PARK
DENALI PARK ROAD
DENALIBOROUGH,ALASKA
PLAN AND ELEVATION
~ ELEVATION
~ -N-0-. ..--D-AT_E_..,.._B_Y_,.. ______ R_E_V-IS_I_O_N_S _________ N_O __ ,___D_A_T_E_.,...B_Y....,. ______ R_E_V-IS_I_O_N_S ______ ,...._D_E_S_I_G_N_E_D_B_Y ___ D_RA_W_N_B_Y ___ C_H_E_C_K_E_D_BY ____ SC_A_L_E ____ P_R_O_J_E_C_T_T_E_A_M_L_E_A_D_E_R ____ B_R_ID_G_E_D_RA_W_I_N_G_...., ____ D_A_T_E ______ D_RA_W_IN_G_N_0 ___ -1
&J 1---+----+--+--------------------+-----+---+-----------------1 N. MARSHALL B. ROBINSON R. OWEN l"= 30'-0" KARL EIKERMANN 1 of 29 APRIL 2025 RG3147-A ~ _______________________________________________________ _._K_. _E_IK_E_R_M_A_N_N _______________ u_N_L_Es_s_N_o_T_E_D ___________ ,._ _________ .... _______________ _
PRELIM
IN
ARY N
OT
FOR C
GENERAL NOTES: STATE PROJECT SHEET
NO.
SPECIFICATIONS:
DESIGN: AASHTO LRFD Bridge Design Specifications for Highway Bridges, Seventh Edition, 2014 with 2015 & 2016 interim revisions. AK PRA DENA 10(36) G.2
CONSTRUCTION: Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. NI'::, l'Ml::, NU.: 335520
DRAWING NO. 184/80298
DEAD LOAD:
CONCRETE: 150 lbs. per cubic foot. ESTIMATE SOIL: 120 lbs. per cubic foot.
TIMBER: 50 lbs. per cubic foot. Item No. Item Quantity: Unit: Notes:
STRUCTURAL STEEL: 490 lbs. per cubic foot.
FUTURE PAVING ALLOWANCE: 25 lbs. per square foot, applied to clear roadway width.
20304-2000 Removal of Bridge All Req'd LPSM 55101-0200…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .