Prelim Letter WA NPS BP MORA 2019(1).pdf
PDF 200 KB Posted
- Solicitation number
- 69056720B000029
About this file
This notice provides preliminary information for a federal bridge preservation project. The Western Federal Lands Highway Division will solicit bids during winter 2020-2021 to paint the underside of the Nisqually Glacier Bridge located in Mount Rainier National Park. Work will include installing containment for paint removal, removing the existing paint, reapplying paint, and minor bridge rail repairs, along with traffic control. Technical questions must be submitted by email or fax to the Western Federal Lands office. Solicitation documents for project WA NPS BP MORA 2019(1) with identification number 69056720B000029 will be available on BETA SAM during the scheduled release window. Prospective bidders are advised to follow the solicitation on that site and visit the project location in fall 2020 due to limited winter access.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Western Federal Lands Highway Division 610 E. Fifth Street
Vancouver, WA 98661 Phone 360-619-7700
Fax 360-619-7846
NOTICE TO PROSPECTIVE BIDDERS
RE: WA NPS BP MORA 2019(1)
Nisqually Glacier Bridge Preservation Solicitation No. 69056720B000029
The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Bidders are encouraged to view the project during fall as conditions permit. After September 30, access will be weather dependent; contact Mt. Rainier National Park for current road conditions at (360) 569-2211. No Federal Highway Administration personnel will be available for show-me tours.
Project Location and Type of Work - All project work is located in the Mount Rainier National Park, Lewis and Pierce Counties, Washington.
• Nisqually Glacier Bridge (Located 16 miles NE of Ashford, WA, on WA Route 706) Work consists of installing containment system for paint removal, removing existing paint from underside of bridge, painting underside of bridge, minor bridge rail work, traffic control.
Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov or FAX 360-619-7932
General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.
Solicitation documents - Documents will be available during the winter of 2020/2021. Please monitor the BETA SAM site for actual date of solicitation release (https://beta.sam.gov/). To receive automatic notification through BETA SAM, you must login and select “Follow” feature and follow the steps as indicated.
Thank you for your interest in this project.
August 25, 2020 mailto:plans-spec@dot.gov mailto:plans-spec@dot.gov mailto:wfl.contracts@dot.gov
| RE: WA BP MORA 2019(1) |
| Solicitation No. 69056720B000029 |
File details come from the government source that posted it. Updated .