This package includes preliminary plans and drawings for a bridge preservation project. The project involves repairing and painting steel railings on the Nisqually Glacier Bridge near Mount Rainier National Park in Washington state. Work includes cleaning, repairing, and painting damaged horizontal rails and posts as identified in photos, as well as any other damaged areas. Temporary traffic control will be implemented during the single lane closure according to drawing 635-6. Other items addressed are contractor quality control, testing, scheduling, erosion control, containment systems, signage, and flagging procedures. The related federal contract opportunity is for preservation work on the Nisqually Glacier Bridge under solicitation number 69056720B000029 for the Department of Transportation Federal Highway Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prelim Letter WA NPS BP MORA 2019(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet and Description
SECTION D
TEMPORARY TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0060 15401-0000 CONTRACTOR TESTING LPSM ALL
A0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0100 15701-0000 SOIL EROSION CONTROL LPSM ALL Quantity for information only: Soil Erosion Control, Fiber Roll: LNFT
A0120 56301-2000 PAINTING, STEEL STRUCTURE LPSM ALL
A0140 56320-0000 CONTAINMENT SYSTEM AND WORKER PROTECTION PLAN LPSM ALL
A0160 57501-0000 MINOR BRIDGE WORK (Repair Steel Railing) LPSM ALL
A0180 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR LPSM ALL
A0200 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 27 27
A0220 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM EACH 1 1 Quantity Each, system includes 2 signal heads
A0240 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 119 119
A0260 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 40 40
MileStone: Final
Date Completed: 08/19/20
Report Date: 08/19/20
A
M
E
N
D
Line
Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES
-A u g -2
:5 A
M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated
Quantities
C
M
IS
C G
IS
C
A D
\N is q u a ll y B ri d g e \E
E B A C S \F in a l\
[s u m m a ry
.x ls m
]S h e e t
STATE PROJECT
B.1NPS BP MORA 2019(1)WA
SHEET
NUMBER
NPS PMIS No.: 310801 øø ø ø øø q PROJECT SITE PLAN
NPS PMIS NO.: 310801
0 200 400 Feet
8/1 9/2
0 9
:49 :15
AM
C:
\M
IS
C
GI
S
CA
D\ Nis qu all y B rid ge \Pr oje ct
Sit e P lan _1 mx d
STATE
WA NPS BP MORA 2019(1)
PROJECT SHEET
NUMBER
C.1
NISQUALLY RIVER
LEGEND:
CONSTRUCTION LIMITS
STAGING AREA
NOTE:
1) Construction activities to remain out of riparian area and off of slopes.
2) Project Location: 46°46'54.76"N, 121°45'44.13"W
BEGIN PROJECT
(MP 11.76)
END PROJECT
(MP 11.84)
(WA ROUTE 706) Nisqually Entrance Road ø FIBER ROLL
W A
N P S
B P
M O
R A
D .d g n
P a r k S e r v ic e
D.1
STATE PROJECT
NUMBER
SHEET
WA
NPS PMIS No. 310801
NPS BP MORA 2019(1)
C h e c k e d b y
D e s ig n e d b y
NO SCALE
Traffic flow
Traffic flow
W20-1
See Note 4
W20-7W20-4
G20-2
See Note 4
(See Length and
Spacing Table)
(optional)
WORK SPACE (optional)(optional)
W13-1P
(optional)
W16-2P
(optional)
1.
2.
3.
4.
5.
6.
7.
Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at a conspicuous location on the rear of vehicle. Prominently display the name of the contractor on the pilot car.
If closure is completely within the project limits, eliminate the "ROAD
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
For night time flagging operation, provide floodlighting at flagger stations.
For project specific minimum width, refer to the Special Contract
Requirements, Section 156.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
LENGTH AND SPACING TABLE
APPROACH
SPEED* TAPER
AREA
BUFFER
SPACE
WORK
SPACE
CHANNELIZING DEVICE
* Approach speed based on the regulatory posted speed, not the advisory speed.
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
BUFFER SPACE
LENGTH
NOTE:
Expressway / Freeway
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
Channelizing devices
Flagger location
Flagger location
635-6
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
SPACING IN FEET
50' - 100' 50' - 100' (optional)
STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
P
M
A u g u s t
U
S C c m y fi le s p w p r o d u c ti o n d m s S td
.d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
See Note 6
10' min.
NO SCALE
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
STOP
HERE ON
RED
ROAD WORK
END
ROAD WORK
END STOP
HERE ON
RED
LENGTH
BUFFER SPACE
Expressway / Freeway xx
MPH
ONE LANE
ROAD
AHEAD
WORK
ROAD
AHEAD
635-9
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2016
REVISED:
MPH FEET
SPACING IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH SIGNALS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
B o r d e r .U
S c m y fi le s p w p r o d u c ti o n d F L
H C e ll s .d g n li b
F e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
(optional) light warning
Type B
See Note 5
STOP LINE
Channelizing devices
See Note 5
STOP LINE
See Note 2
Temporary traffic signal to provide access to work space downstream taper if necessary
Reduce or eliminate drums in
See Note 2
Temporary traffic signal it has two signal faces that are at least 8 feet apart and meets the other
50' - 100' 50' - 100' (optional)
See Note 7
10' min.
40' - 180'
40' - 180'
(optional)
W1-4
(optional) (optional)
WORK SPACE
Traffic flow
Traffic flow
W3-3
R10-6
See Note 6
G20-2
See Note 6
G20-2
Spacing Table)
(See Length and
8.
7.
6.
5.
4.
3.
2.
1.
See Note 6
W20-1 W20-4
(optional)
W13-1P
R10-6
NOTE:
A single signal installation is acceptable, on the right-hand side of the road, if depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to those
ADVANCE WARNING AREA (See Sign Spacing Table)
ABC
(See Length and Spacing Table) VARIABLE TERMINATION AREA
BUFFER SPACETAPER AREA BUFFER SPACE TAPER AREA A
Device spacingSee Note 5 the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Section 156.
For project specific minimum width, refer to Special Contract Requirements, AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD WORK pavement markings.
Removeable pavement markings may be used for stop lines and no-passing advance of the stop line that comply with MUTCD Section 3B.02.
markers between the work space and the stop line. Add no-passing lines in
Section 3B.16. Remove existing conflicting pavement markings and raised
For paved roadway surfaces, install stop lines complying with MUTCD must be determined by a qualified engineer.
conditions as approved by the CO. If signals are moved, revised signal timing
Final location and spacing of signs and devices may be changed to fit field automatically, ensure red signal indications are flashed to both approaches.
engineer. When the signal is changed to the flashing mode either manually or provisions of the MUTCD, Part 4. Signal timing shall be established by a qualified
Install and operate temporary traffic control signals in accordance with the requirements of Part 4 of the MUTCD.
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
NO SCALE
Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 10/2017
REVISED:
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
200' m in m in
6' - 12'
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
STATE PROJECT
B o r d e r .U
S c m y fi le s p w p r o d u c ti o n d F L
H C e ll s .d g n li b
F e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.5
1.5
1.5
1.5
1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
E.3
Sheet 3 of 3
DETAILS
BRIDGE PRESERVATION
N is q u a ll y G la c ie r B r id g e
E .3 .d g n
S tr u c tu r e A s B u il ts E .1
STATE PROJECT
WA
NPS PMIS No. 310801
NPS BP MORA 2019(1)
C h e c k e d b y
D e s ig n e d b y
NOTE:
TOP HORIZONTAL RAIL TO BE PAINTED
PHOTO #2: NORTH RAILING AT MID SPAN OF SPAN 1.
TOP HORIZONTAL RAIL TO BE PAINTED
PHOTO #4: SOUTH RAILING AT WEST APPROACH.
EAST OF PIER 1, RAILING POST TO BE REPAIRED AND PAINTED
PHOTO #5: SOUTH RAILING APPROXIMATELY 70 FEET
RAILING POST TO BE REPAIRED AND PAINTED
HORIZONTAL RAILS TO BE REPAIRED OR REPLACED AND PAINTED
PHOTO #3: NORTH RAIL AT MID SPAN OF SPAN 2,TOP TWO
shown in the photos.
and paint these areas similar to the railings will identify these areas. Repair (if needed) other than those shown in the photos. The CO
2. Additional damaged railing sections may exist horizontal rails and posts of the bridge railing.
replacing, cleaning and painting identified
1. Minor Bridge Work includes repairing or
| FLH Standard Drawings |
| 635-6: Temporary Traffic Control, Single Lane Closure Layout (with Flaggers) |
| Metric |
| US Customary |
| NPS: NPS PMIS No. 310801 |
| State: WA |
| Project: NPS BP MORA 2019(1) |
| 635-6: D.2 |
| NPS#1: NPS PMIS No. 310801 |
| State#1: WA |
| Project#1: NPS BP MORA 2019(1) |
| 635-9: D.3 |
| NPS#2: NPS PMIS No. 310801 |
| State#2: WA |
| Project#2: NPS BP MORA 2019(1) |
| 635-14: D.4 |
File details come from the government source that posted it. Updated .