About this file

This is a Preliminary Bid Results document for Oregon Department of Transportation contract S-73000-00000123, documenting crack sealing services in Woodburn, Oregon. The project involves crack sealing of 200,000 linear feet of pavement, along with associated mobilization, temporary work zone traffic control, and a pollution control plan. Four contractors submitted bids for the project: BCV, Inc.; Commsurf Pro; C.R. Contracting; and Pavement Protectors. The solicitation requested lump sum pricing for mobilization and traffic control, as well as unit pricing for crack sealing services.

Pricing for the crack sealing work varied significantly among bidders, ranging from $0.33 to $0.67 per linear foot, resulting in total project costs between $83,750 and $159,700. BCV, Inc. submitted the lowest bid at $83,750, while Pavement Protectors submitted the highest at $159,700. Traffic control costs ranged from $3,600 to $24,500, and mobilization costs from $1,000 to $5,000. Preliminary bid results indicate that BCV, Inc. is the apparent low bidder, though final contract award was contingent upon bid evaluation and approval processes.

View the file

Other files

File Type Posted
20-121-G Water Meter Boxes and Lids Final.pdf PDF
DFWBP4-AF4CT 63D-LID.pdf PDF
21-121-G Addenda 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

S-73000-00000123 OR219 Crack Seals - Woodburn
PRELIMINARY BID RESULTSBCV, IncCommsurf ProC.R. ContractingPavement Protectors
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1Mobilzation1LS$ 2,500.00$ 2,500.00$ 1,000.00$ 1,000.00$ 5,000.00$ 5,000.00$ 1,500.000$ 1,500.00
2Temporary Work Zone Traffic Control, complete1LS$ 15,000.00$ 15,000.00$ 3,600.00$ 3,600.00$ 19,500.00$ 19,500.00$ 24,500.000$ 24,500.00
3Pollution Control Plan1LS$ 250.00$ 250.00$ 400.00$ 400.00$ 500.00$ 500.00$ 500.000$ 500.00
4Crack Sealing200,000Foot/Feet$ 0.33$ 66,000.00$ 0.47$ 94,000.00$ 0.67$ 134,000.00$ 0.666$ 133,200.00
TOTAL$ 83,750.00$ 99,000.00$ 159,000.00$ 159,700.00