This is a pre-submittal meeting presentation for the City of Napa's Downtown Parking Structure Feasibility Study RFP, delivered by a cross-departmental project team including the Community Development and Public Works departments. The City is seeking professional services to conduct a comprehensive feasibility study evaluating two potential downtown parking structure sites: the Cinedome Site Area and Lot A. The project is structured in two phases—Phase 1 involves site and context analysis, parking demand assessment, conceptual layouts, cost estimates, stakeholder engagement, and recommendations to City Council (10% design level); Phase 2 includes schematic design development, engineering schematics, cost modeling, and funding strategy (30% design level). Key tasks encompass field assessments, demand analysis, conceptual layout options, targeted community outreach, and presentations to City Council. The RFP was issued November 3, 2025, with a pre-submittal meeting held on November 20, 2025, a request for information deadline of November 21, 2025, and a proposal deadline of November 28, 2025. Interviews are tentatively scheduled for December 1-5, 2025, with notice of selection by December 8, 2025, contract approval and award by December 19, 2025, and services commencing January 5, 2026.
Proposals must not exceed 20 double-sided pages (40 single-sided pages), excluding cover, table of contents, and appendices. The total not-to-exceed budget for both Phase 1 and Phase 2 combined is $200,000, with budget broken out separately for each phase and Phase 1 identified as the highest priority. Respondents must provide general qualifications, staffing plans, proposed scope of services with timeline, and pricing on either an hourly or lump-sum basis. Evaluation criteria include general qualifications (15 points), relevant experience (15 points), proposed staffing (15 points), pricing and schedule reasonableness (15 points), proposed approach (10 points), responsiveness (10 points), references (10 points), and interview performance if requested (10 points). The City seeks teams with holistic expertise in parking structure engineering, site planning, cost modeling, urban design, and community engagement, including consideration of existing features such as the farmers market and surrounding developments.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
v
Napa Downtown Parking Structure Feasibility Study
RFP Pre-Submittal Meeting 11/20/2025
Meet the Project Team
Cross-departmental project between Community Development & Public Works. Core team includes:
Neal Harrison, Economic Development Manager Brendan Hurley, Economic Development Program Coordinator Tony Valadez, Compliance and Parking Manager Farid Javandel, Senior Traffic Engineer
Project Background
The City has been working to improve downtown parking management & infrastructure.
Parking exempt fund in the core downtown exists for additional supply Mix of off-street and on-street public supply with a total of ~2,000 spaces City owns and operates 3 garages; County owns the 4th Shift in parking demand and supply with growth in residential and hotel development that lease spaces and redevelop surface lots Reduction in supply and growth in demand requires improved management strategies but also more supply
Project Background
Redevelopment assumptions highlight need for new public parking facilities to support future growth City assessed publicly owned sites suitable for new parking structure City Staff recommended and City Council approved feasibility study on two sites #1 = Cinedome Site Area (including NapaSans-owned property/Skate Park) #3 = Lot A
Legend
Downtown Boundary Parking Exempt District Public Owned Sites Existing Garages Private Owned Sites
Sites
2018 Cinedome Masterplan had two garage options of ~350 spaces; have since reimagined for housing and commercial Study Area 1: Private property in blue, City property in orange, Farmer’s market twice per week.
Study Area 2: Napa Sanitation Site
Redevelopment potential nearby Existing 2nd Street Garage next to site Given core, thoughts on ground floor commercial to activate frontage
Conduct a Feasibility Study for the development of a new parking structure in Downtown Napa.
Level of work meant to support City Council in decisions around funding, project scope, and future delivery method. Looking for early schematic drawings, preliminary engineering sufficient for estimating – not full engineering or procurement materials
The project is broken down into two phases:
Phase 1: Feasibility & Site Recommendation. The project will assess the CineDome and Parking Lot A sites to prepare comparative recommendations for City Council consideration (10% design).
Phase 2: Preliminary Design Documents (replaces prior reference to “bridging documents”). Produce preliminary design documents for one (1) site based on Phase 1 results and Council direction (30% design).
Project Purpose
Want teams that can think holistically, not just about parking structure engineering but about site planning, cost modeling, urban design and community elements like the farmers market
Task 1: Site and Context Analysis Field assessments, policies, and constraints Task 2: Parking Demand and Functional Assessment Demand, new development, and operational & community considerations Task 3: Conceptual Layouts and Preliminary Cost Estimates Concept options, cost estimates, and opportunities Task 4: Targeted Stakeholder Engagement Partner and community outreach Task 5: Analysis and Site Recommendation Present findings to City Council
Phase 1: Feasibility & Site Recommendation Deliverables:
Site Analysis Report Demand and Functional Assessment Conceptual layouts and Cost Estimates Summary of Outreach Presentation Materials for City Council
Task 6: Schematic Design Development Schematic-level design drawings Task 7: Engineering and Structural Schematics Structural and Engineering schematics Task 8: Cost Modeling and Funding Strategy Detailed cost estimates and financing mechanisms Task 9: Final Report and Presentation Deliverables and recommendations to Staff and City Council
Phase 2: Preliminary Design Deliverables:
Schematic Design Cost and Funding Strategy Final Report ***Pending Council direction***
Schematic design, floor plans, massing, structural bays, circulation etc. Preliminary civil/structural schematics sufficient for cost estimating. Urban design considerations, activation opportunities, integration with surrounding use and community elements. Support on how to advance the project.
RFP Requirements
The RFP is seeking professional services team for the downtown parking structure feasibility study (Phase 1) with preliminary design (Phase 2).
Proposals should not exceed 20 doubled-sided pages (40 single-sided pages). Cover and TOC excluded, and appendix allowed.
Provide general qualifications, experience, and staffing/team Propose scope of services based on Draft Scope of Services in RFP and timeline Provide total not-to-exceed price and hourly or lump-sum Break out Phase 1 and Phase 2 budget. Phase 1 the most important recognizing Phase 2 will be informed by Phase 1 work Budget for Phase 1 and Phase 2 are not to exceed $200,000. Outline any additional funding for Phase 2 if needed.
View of the Napa River Trail along the Westin Verasa and River Terrace Inn
Planned RFP Schedule
View of kayakers on the River.
| Schedule | |
| Activity | Planned Dates |
| RFP Issued | November 3, 2025 |
| Pre-Submittal Meeting | November 20, 2025 |
| Request for Information Deadline | November 21, 2025 |
| Proposal Deadline | November 28, 2025 December 5, 2025 |
| Interviews (if requested by City) | December 1-5, 2025 Week of December 15 |
| Notice of Selection | December 8, 2025 Week of January 8 |
| Approval and Award | December 19, 2025 Week of January 8 |
| Commence Services | January 5, 2026 End of January/beginning February |
Evaluation Criteria
View of kayakers on the River.
| Evaluation Criteria | ||
| Item | Description | Scoring |
| General qualifications | Demonstrated organizational capacity, technical ability, and team configuration to perform required services | 1-15 points |
| Relevant experience | Experience with similar feasibility or design-related projects | 1-15 points |
| Proposed staffing | Key personnel possess the expertise, availability, and complementary skills necessary to complete the project successfully | 1-15 points |
| Pricing and schedule | Proposed costs and timeline are reasonable, well-justified, and achievable within City budget expectations | 1-15 points |
| Proposed approach | Proposal demonstrates a clear and actionable methodology tailored to City objectives | 1-10 points |
| Responsiveness | Proposal is complete, well-organized, and directly addresses all RFP requirements and deliverables | 1-10 points |
| References | Quality of past client relationships and project outcomes as verified by references | 1-10 points |
| Interview (if requested) | Team effectively communicates understanding of the project and City priorities | 1-10 points |
Q & A image1.jpeg image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.jpeg
File details come from the government source that posted it. Updated .