Pre-Demolition Asbestos Inspection Last Dollar Cabin Site.pdf
PDF 1 MB Posted
- Attached to
- Forestwide Asbestos Abatement Federal contract opportunity
- Solicitation number
- 1240LQ22Q0018
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 001.pdf | ||
| 1240LQ22Q0018 - Forestwide Asbestos Abatement.docx | DOCX document | |
| Previous Mitigation Work Burke Martin Site.pdf | ||
| 1240LQ22Q0018 Forestwide Asbestos Abatement.pdf | ||
| Wage Determination Pitkin County.txt | TXT text file | |
| Pre-Demolition Asbestos Inspection Dixie Lode Site.pdf | ||
| Wage Determination Summit County.txt | TXT text file | |
| Pre-Demolition Asbestos Inspection Burke Martin Site.pdf | ||
| Pre-Demolition Asbestos Inspection Cash Lode Cabin Site.pdf | ||
| Experience Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos Consulting Services
Sunrise Environmental, Inc.
PO Box 429 - 371 Crest View Drive
Black Hawk, Colorado 80422 720-209-5282 | www.sunrise-enviro.com
PRE-DEMOLITION
ASBESTOS INSPECTION
LAST DOLLAR CABIN
WHITE RIVER NATIONAL FOREST
SUMMIT COUNTY, COLORADO
TOWNSHIP 7 SOUTH,
RANGE 78 WEST, SECTION 35 6th PM
GPS: 39° 24’ 07.13” NORTH –106° 04’ 58.68” WEST
PREPARED FOR:
White River National Forest
900 Grand Avenue Glenwood Springs, Colorado
81601
PROJECT: SEI21-P103
PREPARED: August 16, 2021
SEI21-P103
Last Dollar Cabin, Summit County, Colorado
TABLE OF CONTENTS
SECTION DESCRIPTION PAGE
CERTIFICATION OF RESULTS 3
1.0 EXECUTIVE SUMMARY 4
2.0 SCOPE AND FACILITY INFORMATION 5
2.1 Inspection Objectives and Scope 5
2.2 Building Description 5
2.3 Review of Existing Information 5
3.0 METHODS AND TECHNIQUES 6
3.1 Inspection 6
3.2 Bulk Sampling 6
3.3 Sample Analysis 7
4.0 ASBESTOS-CONTAINING MATERIAL DESCRIPTIONS
AND RECOMMENDATIONS 8
5.0 PRESUMED ASBESTOS CONTAINING MATERIAL
DESCRIPTIONS AND RECOMMENDATIONS 12
6.0 NON-ASBESTOS CONTAINING MATERIAL DESCRIPTIONS 12
7.0 INSPECTOR COMMENTS 13
8.0 CONCLUSIONS AND RECOMMENDATIONS 13
9.0 LIMITATIONS 14
Appendices
Appendix A – Analytical Data Appendix B – Site Location Diagram Appendix C – Bulk Sample Location Diagram Appendix D – Asbestos Containing Material Location Diagram Appendix E – Certifications
CERTIFICATION OF RESULTS
This Pre-Demolition Asbestos Inspection was performed on behalf of the White River National Forest, (hereafter referred to as “Client”), subsidiaries, partners, directors and officers, and all successors and assigns, solely for use in evaluation of the presence of asbestos-containing building materials sampled at the Last Dollar Cabin, located in the White River National Forest (Summit County) Township 7 South, Range 78 West Section 35, 6th PM GPS: 39° 24 07.13” North –106° 04’ 58.68” West, (hereafter referred to as the “Site”). The information herein is only for the specific use of White River National Forest and Sunrise Environmental, Inc. Use by any other parties is unauthorized. Sunrise Environmental, Inc accepts no responsibility for the use, interpretation, or reliance by other parties on the information contained herein, unless written authorization is obtained by Sunrise Environmental, Inc.
Sunrise Environmental, Inc.
Scott D. Sanders President CDPHE Building Inspector Certificate #633
1.0 EXECUTIVE SUMMARY
Sunrise Environmental, Inc. has completed a Pre-Demolition Asbestos Inspection at the Last Dollar Cabin. The asbestos inspection was performed by Mr. Scott D. Sanders of Sunrise Environmental, Inc. July 9th, 2021. After identifying homogeneous areas of suspect Asbestos Containing Materials (ACM), the inspector collected samples from each homogeneous area. The samples were submitted to an independent laboratory where they were analyzed by polarized light microscopy.
Sunrise Environmental, Inc. collected and analyzed a total of thirteen (13) samples from six (6) homogeneous areas for asbestos content, two (2) of which were found to contain greater than 1% asbestos. Sunrise Environmental, Inc. did not presume any additional Homogeneous Areas as asbestos containing.
The materials found to contain greater than 1% asbestos at the site are listed below:
· Black roofing tar (H.A. #4) (cabin roof)
· Black roofing tar (H.A. #6) (mine entrance roof)
The materials listed in above should be removed prior to manual deconstruction of the cabin or mine entrance roof. Removal of these materials should be performed by a Colorado Department of Public Health and Environment Air Quality Control Commission (CDPHE-AQCC) licensed General Abatement Contractor (GAC) using personnel trained in asbestos removal techniques and personal protective equipment.
2.0 SCOPE AND FACILITY INFORMATION
2.1 Inspection Objectives and Scope
The White River National Forest requested Sunrise Environmental Inc. inspect the Last Dollar Cabin and mine entrance roof for the presence of asbestos containing materials (ACM). Sunrise Environmental, Inc. performed a Pre-Demolition Asbestos Inspection in accordance with the requirements of 40 CFR 61, National Standards for Hazardous Air Pollutants (NESHAP), and Colorado Department of Public Health and Environment Air Quality Control Commission (CDPHE-AQCC) Regulation 8, which require that a structure be thoroughly inspected for the presence of asbestos-containing building materials prior to demolition.
Our scope of services included the following:
· Identify suspect asbestos containing materials (ACM) at the Last Dollar Cabin and mine entrance roof.
· Identify suspect asbestos containing materials (ACM) on the surface of the ground at the site.
· Collect bulk samples of all identified suspect materials in accordance with 40 CFR
763.86 and CDPHE-AQCC Regulation # 8.
· Submit the bulk samples to a NVLAP accredited asbestos laboratory for analysis;
· Specify the condition of the suspect ACM;
· Compile a final report of findings.
Sunrise Environmental, Inc. made reasonable efforts to locate and identify asbestos containing materials (ACM) at the Last Dollar Cabin site. The inspection was conducted by CDPHE-AQCC Certified Asbestos Building Inspector Scott D. Sanders, Certification #633.
2.2 Building Description
The approximately 400 square foot cabin is primarily constructed of wood with asphalt sheet roofing beneath metal sheet roofing. The mine entrance roof is constructed of wood with sheet metal roofing.
2.3 Review of Existing Information
No previous asbestos inspection documentation regarding the cabin or mine entrance roof was provided for review.
3.0 METHODS AND TECHNIQUES
3.1 Inspection
Sunrise Environmental, Inc. inspected the Last Dollar Cabin and mine entrance roof to locate and identify friable and non-friable asbestos containing building materials. Mr. Scott D. Sanders of Sunrise Environmental, Inc. performed the inspection July 9th, 2021. Mr. Scott D. Sanders is a CDPHE-AQCC certified asbestos building inspector. The inspector visually inspected the cabin to locate and identify suspect ACM, touched suspect ACM to determine friability, and determined the extent of homogeneous areas of friable and non-friable suspect ACM.
3.2 Bulk Sampling
Random bulk samples, representative of the suspect asbestos containing building materials of each homogeneous area, were collected according to guidelines published as Environmental Protection Agency (EPA) Final Rule: Title II of the Toxic Substances Control Act (TSCA), 15 USC, Sections 2641 through 2654 and in compliance with 40 CFR, Part 763 and CDPHE-AQCC, Regulation Number 8. Representative sampling is based on the following criteria:
1. The distribution of the suspect material throughout the homogeneous area.
2. The suspect materials physical characteristics and application.
3. Random sampling patterns determined for each homogeneous area.
Sample locations for Surfacing Materials were randomly determined according to the EPA “Pink Book” asbestos in buildings:
Simplified Sampling Scheme for Friable Surfacing Materials (1985).
Suspect materials sampled and analyzed should be considered representative of materials in each homogeneous area if:
1. They exhibit similar physical characteristics.
2. The application of the sampled material can be correlated to the application of un-sampled material.
Suspect materials similar in appearance and application were sampled as homogeneous areas.
Suspect materials were divided into three classifications and sampled according to applicable regulations based on classification of each homogeneous material and the quantity of each homogeneous material as listed below:
1. Surfacing Materials - Troweled on or sprayed on material
· 1,000 square feet requires a minimum of three (3) samples
· Greater than 1,000 square feet but less than or equal to 5,000 square feet requires a minimum of five (5) samples
· Greater than 5,000 square feet requires a minimum of seven (7) samples
2. Thermal System Insulation
· Each system requires three (3) samples
3. Miscellaneous - other suspect materials not classified in the above categories
· Sufficient samples to adequately characterize the materials with a minimum of two
(2) samples
After identifying homogeneous areas of suspect ACM, representative samples from each homogeneous area were collected. The inspector randomly selected the sample locations and collected samples in a manner to minimize the release of fibers into the air. At each sample location, the inspector collected a small bulk sample of the material using an appropriate tool (e.g, clean knife or chisel), and placed each bulk sample into an unused, uniquely labeled, sealable bag.
The inspector documented each Homogeneous Area, sample location, sample number and other pertinent information at the time of the inspection. A total of thirteen (13) samples were collected for analysis from six (6) Homogeneous Areas.
3.3 Sample Analysis
Bulk samples collected were submitted for analysis at FRS Geotech, Inc. 1441 West 46th Avenue, Suite 14, Denver, Colorado 80211 and were analyzed by Polarized Light Microscopy (PLM) for asbestos content. FRS Geotech, Inc. is accredited by the National Institute of Standards and Technology (NIST) under the National Voluntary Laboratory Accreditation Program (NVLAP).
PLM was performed in compliance with guidelines established by the USEPA (EPA 600/R-93/116 Method).
A building material of a given homogeneous area is considered to be ACM based on a finding that at least one sample collected from the material showed asbestos present in an amount greater than one percent (1%). A building material is not to be considered ACM only if the results of all samples collected from the material showed asbestos content to be equal to or less than one percent (1%).
CDPHE-AQCC Regulation No. 8, Section III.A.1.c requires that if the asbestos content of a friable asbestos containing material is estimated to be 1% asbestos or less, but greater than 0%, the material must be treated as asbestos-containing or the material must be submitted for the point count analysis technique using Polarized Light Microscopy. If the point count result is different from the result obtained from visual estimation, the point count result must be used. EPA- NESHAP recommends point count analysis for visual estimations from greater than 1% to 10% to disprove false positive results or consider the material to be asbestos containing. None of the samples collected were submitted for point count analysis.
The analysis of the bulk samples was performed on July 21st, 2021 as listed in the Analytical Data Section of this report (See Appendix A). Condition assessments were performed by the accredited inspector at the time of inspection.
4.0 Asbestos Containing Material Descriptions and Recommendations
The following pages include asbestos containing materials identified at the site. A photograph of each asbestos-containing material identified at the site can be found following the General Recommendations for each Homogeneous Area.
All material quantities should be verified in the field by contractors bidding for abatement of the asbestos-containing materials and/or demolition of the structures.
The building materials listed in this section contain concentrations of asbestos greater than 1% by visual estimation when analyzed by Polarized Light Microscopy.
HOMOGENEOUS AREA – 4
Material Description: Black roofing tar Type of Material: Miscellaneous Material Friability: Non-Friable Material Condition: Good
Potential for Disturbance Frequency of Potential Contact: Low Influence of Vibration: Low Potential for Air Erosion: Low
Material Location Material Quantity AHERA Category Roof, ~5 sq. ft. scattered Non-friable ACBM various locations over ~450 sq. ft. of roofing
Sample No. Sample Location Composition 4-1 Roof, None detected
South side of roof West of center, Beneath metal roofing
4-2 Roof, 20% Chrysotile (black tar)
Northwest corner Beneath metal roofing
General Recommendations
The black roofing tar is considered non-friable. Maintain material in undamaged condition. Do not sand, grind, drill or abrade the material. The black roofing tar should be removed by personnel trained in asbestos removal techniques and personal protective equipment prior to deconstruction of the cabin. Since the black roofing tar is scattered throughout the roof, all of the roofing must be removed if manual deconstruction of the cabin will be performed.
The black roofing tar is located throughout the rood on the non-ACM asphaltic sheet roofing beneath metal sheet roofing.
Photo of Homogeneous Area #4, black roofing tar:
HOMOGENEOUS AREA – 6
Material Description: Black roofing tar Type of Material: Miscellaneous Material Friability: Non-Friable Material Condition: Good
Potential for Disturbance Frequency of Potential Contact: Low Influence of Vibration: Low Potential for Air Erosion: Low
Material Location Material Quantity AHERA Category Mine entrance roof 5 sq. ft. of ACM tar over Non-friable ACBM ~35 sq. ft. of metal roofing
Sample No. Sample Location Composition 6-1 Mine entrance roof 10% Chrysotile (black tar)
West side of roof
6-2 Mine entrance roof 10% Chrysotile (black tar)
East side of roof
General Recommendations
The black roofing tar is considered non-friable. Maintain material in undamaged condition. Do not sand, grind, drill or abrade the material. If the black roofing tar becomes damaged or disturbed, removal should be performed using proper procedures utilizing personnel trained in asbestos removal techniques and personal protective equipment. Properly maintained asbestos-containing black tar poses minimal risk of fiber release. The black tar must be removed by a CDPHE licensed General Abatement Contractor (GAC) using personnel trained in asbestos removal techniques and personal protective equipment prior to removal of the mine entrance roof.
The black roofing tar was observed scattered throughout the mine entrance metal roofing and also on the rocks adjacent to the metal roof.
Photo on next page.
Photos of Homogeneous Area #6, black roofing tar:
5.0 Presumed Asbestos Containing Building Materials
No additional building materials at the site were presumed to contain greater than 1% asbestos.
6.0 Non-Asbestos Containing Building Materials
The following materials were sampled at the site and were found to contain 1% or less asbestos:
Sample Number:
Homogeneous Area & Material Description:
Sample Location:
1-1 Homogeneous Area #1:
(1 sq. ft.) (3 windows) Window glazing (Miscellaneous Material) (Non-Friable)
Cabin, South window
1-2 Homogeneous Area #1:
(1 sq. ft.) (3 windows) Window glazing (Miscellaneous Material) (Non-Friable)
Cabin, East window
2-1 Homogeneous Area #2:
(1 sq. ft.) (3 windows) Window caulk (Miscellaneous Material) (Non-Friable)
Cabin, South window
2-2 Homogeneous Area #2:
(1 sq. ft.) (3 windows) Window caulk (Miscellaneous Material) (Non-Friable)
Cabin, East window
3-1 Homogeneous Area #3: (80 sq. ft.)
Log chinking (Surfacing Material) (Friable)
Cabin, North exterior wall, East end
3-2 Homogeneous Area #3: (80 sq. ft.)
Log chinking (Surfacing Material) (Friable)
Cabin, West exterior wall, Center
3-3 Homogeneous Area #3: (80 sq. ft.)
Log chinking (Surfacing Material) (Friable)
Cabin, South exterior wall, Center
5-1 Homogeneous Area #5: (2 sq. ft.)
Silver roof sealant (Miscellaneous Material) (Non-Friable)
Cabin, Roof, North side of stove vent
5-2 Homogeneous Area #5: (2 sq. ft.)
Silver roof sealant (Miscellaneous Material) (Non-Friable)
Cabin, Roof, South side of stove vent
7.0 Inspector Comments
Sunrise Environmental, Inc. identified and sampled a total of six (6) Homogeneous Areas, two (2) of which were found to contain greater than 1% asbestos. Sunrise Environmental, Inc. did not presume any additional building materials to contain greater than 1% asbestos. The CDPHE- AQCC requires the removal of friable materials and non-friable materials that may become friable during demolition activities prior to demolition. This asbestos inspection was performed for the purpose of demolition.
Sunrise Environmental, Inc. made reasonable efforts to locate and identify Asbestos Containing Materials (ACM) at the Last Dollar Cabin site. The inspector performed destructive access to access inaccessible areas. If hidden unidentified materials are encountered during demolition, work should stop and additional bulk material samples should be collected to determine potential asbestos content.
Rodent feces were observed within the cabin at the site during the inspection, making Hantavirus a possibility. Proper precautions and Personal Protective Equipment (PPE) for Hantavirus should be considered by Contractors involved in abatement or demolition activities and any person entering the cabin.
All asbestos-containing material quantities listed in Section 4.0 of this report are estimations and should be verified in the field by contractors bidding on asbestos abatement or demolition of the cabin. Analytical Data can be found in Appendix A. Site Location Diagram is located in Appendix B. Bulk Sample Location Diagrams are in Appendix C. Asbestos-Containing Material Location Diagrams are in Appendix D. Asbestos Certifications can be found in Appendix E of this report.
8.0 Conclusions and Recommendations
The materials found to contain greater than 1% asbestos at the site are listed below:
· Black roofing tar (H.A. #4) (cabin roof)
· Black roofing tar (H.A. #6) (mine entrance roof)
All of the materials listed above must be removed if manual deconstruction (demolition) of the cabin and mine entrance roof is to be performed. Removal of these materials should be performed by a CDPHE-AQCC licensed General Abatement Contractor (GAC) using personnel trained in asbestos removal techniques and personal protective equipment.
The Occupational Safety and Health Administration (OSHA) requires contractors and workers be notified of the presence and location of asbestos and requires employers to protect employees from exposure to asbestos above the permissible exposure limit of 0.10 f/cc, as determined by personnel monitoring, over an 8-hour time weighted average. Appropriate asbestos training for workers is also required. Contractors are responsible to comply with OSHA 29 CFR 1926.1101 requirements.
Building and/or facility owners are required to notify prospective employers applying or bidding for work that can reasonably be expected to work in or occupy areas containing ACM and/or PACM, of the presence of such materials.
9.0 Limitations
The findings set forth in this report are strictly limited in time and scope to the date of the evaluation(s). The conclusions presented in the report are based solely on the services described therein, and not on scientific tasks or procedures beyond the scope of agreed upon services.
Because of the hidden nature of many building components, it may be impossible to determine if all building components have been located and subsequently tested. Destructive testing in some instances is not a viable option. Sunrise Environmental, Inc. does not, therefore, guarantee that all potential ACBM has been located. For the same reasons, estimates of quantities are subject to readily apparent situations. We do warrant, however, that the investigations and methodology reflect Sunrise Environmental, Inc’s best efforts based upon prevailing standard of care and due diligence in the environmental field.
The purpose of this report was to assess the physical characteristics of the subject Site with respect to the presence of asbestos containing building materials. No specific attempt was made to check on the compliance of present or past owners or operators of the Site with federal, state or local laws and regulations, environmental or otherwise.
APPENDIX A
ANALYTICAL DATA
FRS Geotech, Inc.
1441 W. 46th Ave, Ste. 14 Denver, CO 80211-2338
July 21, 2021
Mr. Scott Sanders Sunrise Environmental, Inc.
P.O. Box 429 Black Hawk, CO 80422
Re: Project: Last Dollar Cabin, White River Nat'l Forest, Summit County, CO
FRS Lab Number 126275
Phone: (303) 477-2559
(800) 386-3136
FAX: (303) 477-2580
e-mail: frsgeo@ix.netcom.com
Dear Mr. Scott Sanders:
The bulk samples submitted to FRS Geotech, Inc. have been analyzed by polarized light microscopy (PLM), the EPA-recommended method for determination of fibrous constituents in building materials. The percent of asbestos contained in the samples is a visual estimation based upon comparisons with published charts. The results of these analyses are summarized in the enclosed table. This report relates only to the items received and tested by our laboratory. According to requirements set by the National Institute of Standards and Technology/NVLAP, this report must not be used by the client to claim certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. Also, NVLAP guidelines specify that this report should not be reproduced, except in full, without the written approval of FRS.
A copy of your Chain of Custody is attached for your convenience. This report is considered highly confidential. Results will not be discussed with any person not associated with you.
Please call if you have any questions about this work.
Sincerely, David A. Schroeder, Ph.D.
Data Controller
Enclosures
NVLAP Accredited Lab #102078-0
FRS GEOTECH, INC.
1441 W. 46th Avenue, Ste. 14 Denver, CO 80211-2338
Phone: (303) 477-2559
Fax: (303) 477-2580 e-mail: frsgeo@ix.netcom.com
(800) 386-3136RESULTS OF BULK ASBESTOS SAMPLE ANALYSIS
BY POLARIZED LIGHT MICROSCOPY (PLM) EPA-600/R-93/116
Client: Sunrise Environmental, Inc.
Project: Last Dollar Cabin, White River Nat'l Forest, Summit County, CO
Lab No.: 126275
Sample No. [layer] Sample Date Summary (%)
Nonasbestos Fibrous Material (%)
Asbestos Minerals (%)Volume (%)Description
1-1
Window glazing [white]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: None DetectedFiberglass Cellulose
Synthetics
Nonfibrous Material 100 Others .
100%
--Other Fibrous Material
1-2
Window glazing [white]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: None DetectedFiberglass Cellulose
Synthetics
Nonfibrous Material 100 Others .
100%
--Other Fibrous Material
2-1
Caulk [brown]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: None DetectedFiberglass Cellulose
Synthetics
Nonfibrous Material 100 Others .
100%
--Other Fibrous Material
2-2
Caulk [brown]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: None DetectedFiberglass Cellulose
Synthetics
Nonfibrous Material 100 Others .
100%
--Other Fibrous Material
3-1
Log chinking [gray]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: None DetectedFiberglass Cellulose
Synthetics
Nonfibrous Material 100 Others .
100%
--Other Fibrous Material
3-2
Log chinking [gray]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: None DetectedFiberglass Cellulose
Synthetics
Nonfibrous Material 100 Others .
100%
--Other Fibrous Material
* Composite analysis (multilayered sample, see individual layer analyses).
Analyst(s): 07/21/2021Completed:
David A. Schroeder
Denver, CO 80211-2338
Phone: (303) 477-2559
Fax: (303) 477-2580 e-mail: frsgeo@ix.netcom.com
(800) 386-3136RESULTS OF BULK ASBESTOS SAMPLE ANALYSIS
BY POLARIZED LIGHT MICROSCOPY (PLM) EPA-600/R-93/116
Client: Sunrise Environmental, Inc.
Project: Last Dollar Cabin, White River Nat'l Forest, Summit County, CO
Lab No.: 126275
Sample No. [layer] Sample Date Summary (%)
Nonasbestos Fibrous Material (%)
Asbestos Minerals (%)Volume (%)Description
3-3
Log chinking [gray]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: None DetectedFiberglass Cellulose
Synthetics
Nonfibrous Material 100 Others .
100%
--Other Fibrous Material
4-1
Brown sheet roofing/[black] tar paper underlayment [with black tar]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: None DetectedFiberglass Cellulose
Synthetics
Nonfibrous Material 45 Others .
100%
Other Fibrous Material
4-2*
Brown sheet roofing/tar paper underlayment [2 layers]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: Trace <1%Fiberglass Cellulose
Synthetics
Nonfibrous Material 60 Others .
Composite (100%)
39Trace <1%
Other Fibrous Material
___4-2 [A]
[Brown sheet roofing, black tar paper underlayment and black tar]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: None DetectedFiberglass Cellulose
Synthetics
Nonfibrous Material 60 Others .
Layer vol. = 97%
Other Fibrous Material
___4-2 [B]
[Black tar (small dab on top of tan sheet roofing)]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: 20Fiberglass Cellulose
Synthetics
Nonfibrous Material 80 Others .
Layer vol. = 3%
-- 20 Other Fibrous Material
5-1
Silver sealant
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: None DetectedFiberglass Cellulose
Synthetics
Nonfibrous Material 100 Others .
100%
--Other Fibrous Material
* Composite analysis (multilayered sample, see individual layer analyses).
Denver, CO 80211-2338
Phone: (303) 477-2559
Fax: (303) 477-2580 e-mail: frsgeo@ix.netcom.com
(800) 386-3136RESULTS OF BULK ASBESTOS SAMPLE ANALYSIS
BY POLARIZED LIGHT MICROSCOPY (PLM) EPA-600/R-93/116
Client: Sunrise Environmental, Inc.
Project: Last Dollar Cabin, White River Nat'l Forest, Summit County, CO
Lab No.: 126275
Sample No. [layer] Sample Date Summary (%)
Nonasbestos Fibrous Material (%)
Asbestos Minerals (%)Volume (%)Description
5-2
Silver sealant
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: None DetectedFiberglass Cellulose
Synthetics
Nonfibrous Material 100 Others .
100%
--Other Fibrous Material
6-1
Black tar [with white flecks]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: 10Fiberglass Cellulose
Synthetics
Nonfibrous Material 90 Others .
100%
-- 10 Other Fibrous Material
6-2
Black tar [with white flecks]
07/09/21 Amosite Anthophyllite
Chrysotile Crocidolite Trem./Act.
Total Asbestos: 10Fiberglass Cellulose
Synthetics
Nonfibrous Material 90 Others .
100%
-- 10 Other Fibrous Material
* Composite analysis (multilayered sample, see individual layer analyses).
APPENDIX B
SITE LOCATION MAP
APPENDIX C
ASBESTOS BULK SAMPLE
LOCATION DIAGRAM
MINE
ENTRANCE
LAST DOLLAR CABIN SITE, SUMMIT COUNTY
ASBESTOS BULK SAMPLE LOCATION DIAGRAM
APPROXIMATE - NOT TO SCALE
MCCULLOUGH
GULCH TRAIL
1-1
1-2
2-1
2-2
3-1
3-2
3-3
4-1
4-2
ROOF
ROOF
5-1
ROOF
5-2
ROOF
6-1
ROOF
6-2
ROOF
APPENDIX D
ASBESTOS CONTAINING MATERIAL
LOCATION DIAGRAM
MINE
ENTRANCE
LAST DOLLAR CABIN SITE, SUMMIT COUNTY
ASBESTOS CONTAINING MATERIAL LOCATION DIAGRAM
APPROXIMATE - NOT TO SCALE
MCCULLOUGH
GULCH TRAIL
HA #4 - BLACK ROOFING TAR ON CABIN
HA #6 - BLACK ROOFING TAR ON MINE ENTRANCE
APPENDIX E
CERTIFICATIONS
| SEI21-P103 Last Dollar Cabin |
| TABLE OF CONTENTS |
| SECTION DESCRIPTION PAGE |
| 1.0 EXECUTIVE SUMMARY |
| Sunrise Environmental, Inc. has completed a Pre-Demolition Asbestos Inspection at the Last Dollar Cabin. The asbestos inspection was performed by Mr. Scott D. Sanders of Sunrise Environmental, Inc. July 9th, 2021. After identifying homogeneous areas... |
| 8.0 Conclusions and Recommendations |
| APPENDIX A ANALYTICAL DATA |
| P103 Lab |
| P103 Labch |
| APPENDIX B SITE LOCATION MAP |
| P104 site diagram |
| APPENDIX C ASBESTOS BULK SAMPLE LOC DIAG |
| APPENDIX C |
| LAST DOLLAR SAMPLE LOC DIGRAM |
| APPENDIX D ASBESTOS CONTAINING MATERIAL LOC DIAG |
| APPENDIX D |
| LAST DOLLAR ACM DIGRAM |
| APPENDIX E CERTIFICATIONS |
| APPENDIX E |
| BI Scott Combo |
| SEI Asbestos Firm Exp 1-30-2022 |
| 2021-08-16T11:55:24-0600 | |
| Scott D Sanders |
File details come from the government source that posted it. Updated .