Previous Mitigation Work Burke Martin Site.pdf

PDF 2 MB Posted

Attached to
Forestwide Asbestos Abatement Federal contract opportunity
Solicitation number
1240LQ22Q0018
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Forestwide Asbestos Abatement, newest first.
File Type Posted
Amendment 001.pdf PDF
1240LQ22Q0018 - Forestwide Asbestos Abatement.docx DOCX document
1240LQ22Q0018 Forestwide Asbestos Abatement.pdf PDF
Wage Determination Pitkin County.txt TXT text file
Pre-Demolition Asbestos Inspection Dixie Lode Site.pdf PDF
Pre-Demolition Asbestos Inspection Last Dollar Cabin Site.pdf PDF
Wage Determination Summit County.txt TXT text file
Pre-Demolition Asbestos Inspection Burke Martin Site.pdf PDF
Pre-Demolition Asbestos Inspection Cash Lode Cabin Site.pdf PDF
Experience Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asbestos Consulting Services

Sunrise Environmental, Inc.

371 Crest View Drive –PO Box 429 Black Hawk, Colorado 80422

720-209-5282 | www.sunrise-enviro.com

September 29th, 2021

ATTN: Ms. Olivia Garcia

White River National Forest 900 Grand Avenue, Glenwood Springs, Colorado 81602-0948

RE: Post-Abatement Visual Inspection at Burke-Martin Mine

Southeast ¼ of Section 35, Township 5 South, Range 76 West GPS: North 39° 34’ 21.6” – West 105° 51’ 47.6” White River National Forest, Summit County, Colorado Sunrise Project Number: SEI21-P115

Dear Ms. Garcia, Sunrise Environmental, Inc. performed a site visit on August 9th, 2021 to delineate the Burke- Martin mill debris pile clean-up area. The clean-up area was marked with a combination of stakes, paint and ribbons for Eagle Environmental Solutions (General Abatement Contractor). The friable asbestos-containing materials (less than trigger levels) were also identified for the abatement contractor to remove from the mill debris pile.

The removal of the friable asbestos-containing materials was performed by Eagle Environmental Solutions the same day and a post-abatement visual inspection was performed several hours later.

Sunrise Environmental, Inc. performed a post-abatement visual inspection on August 9th, 2021 following the removal of the asbestos-containing building materials listed below:

1. Approximately 35 square feet of asbestos-containing cementitious paneling was removed.

2. Approximately 5 square feet of asbestos-containing white fibrous insulation was removed.

3. Approximately 1 square foot of asbestos-containing wire insulation was removed from the mill debris pile.

Following the removal of the friable asbestos-containing materials listed above, Eagle Environmental Solutions performed clean-up & removal of the non-friable asbestos-containing roofing tar from the debris pile. Wood timbers and boards were separated from the mill debris pile and stacked in a separate location at the site. A visual inspection was performed after the mill debris pile was cleaned. Photos, visual inspection form and certifications are included.

Sincerely, Scott D. Sanders President

Burke-Martin Mine Mill Debris Pile Clean-Up

Mill debris pile clean-up area delineated with stakes, ribbons & paint:

Mill debris pile clean-up area delineated with stakes, ribbons & paint:

Asbestos-containing cementitious paneling was removed:

Asbestos-containing cementitious paneling was removed:

Asbestos-containing wire insulation was removed:

Asbestos-containing white fibrous insulation was removed:

Mill debris pile after clean-up.

SEI21-P115 Visual Insp letter
September 29th, 2021
P115 vis 1
P115 vis 2
BI Scott Combo
SEI Asbestos Firm Exp 1-30-2022
2021-09-29T18:37:05-0600
Scott D Sanders

File details come from the government source that posted it. Updated .