Pre-Bid_Recording_25-WW-10.m4a

M4A file 3 MB Posted

Attached to
LIFT STATION #20 BYPASS PUMP
Solicitation number
25-WW-10
Issued by
Chumuckla CDP, Florida

About this file

The government file is a pre-bid recording for Invitation to Bid (ITB) No. 25-WW-10-1 issued by the City of Holly Hill, Florida, soliciting bids for the Lift Station #20 Bypass Pump project. The municipal infrastructure improvement initiative requires contractors to install a bypass pump system for an existing lift station, with specifications prepared by Mead & Hunt. Sealed bids are due by 2:00 p.m. on Tuesday, June 10th, 2025, following a non-mandatory pre-bid meeting on May 27th, 2025, in the Commission Chambers. Bidders must submit one original, four copies, and one electronic copy on a USB flash drive. The project has a 150-day completion timeline with liquidated damages of $1,000 per day for delays.

The estimated contract value is $468,780.00, with bidders required to provide a 5% bid bond or certified check and a 100% Performance Payment Bond if awarded. The procurement is federally assisted and subject to Davis-Bacon and Copeland Act labor standards, including prevailing wage rates. A local bidder preference provision offers a potential 5% price adjustment (not exceeding $5,000) for local businesses. Contractors must comply with federal requirements such as E-Verify and public records laws. Bid documents are available through VendorLink, with all questions to be submitted in writing by 5:00 p.m. on Wednesday, June 4th, 2025. The City reserves the right to reject any bids and waive non-substantial irregularities.

Other files

File Type Posted
25-WW-10_Opening_Bid_Summary.pdf PDF
Addendum_No._1.pdf PDF
Addendum_No._1.pdf PDF
Pre-Bid_Recording_25-WW-10.m4a M4A file
Pre-Bid_Recording_25-WW-10.m4a M4A file
25-WW-10_Pre-Bid_Meeting_Sign-in_sheet_LS_20.pdf PDF
25-WW-10_Pre-Bid_Meeting_Sign-in_sheet_LS_20.pdf PDF
25-WW-10_Pre-Bid_Meeting_Sign-in_sheet_LS_20.pdf PDF
ITB_25-WW-10-1_Final_1.pdf PDF
IB_Summary__25-WW-10.pdf PDF
ITB_25-WW-10-1_Final_1.pdf PDF
ITB_25-WW-10_Drawings.pdf PDF
ITB_25-WW-10_Drawings.pdf PDF
ITB_25-WW-10-1_Final_1.pdf PDF
IB_Summary__25-WW-10.pdf PDF
ITB_25-WW-10-1_Final_1.pdf PDF
ITB_25-WW-10_Drawings.pdf PDF
IB_Summary__25-WW-10.pdf PDF
ITB_25-WW-10_Drawings.pdf PDF
IB_Summary__25-WW-10.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .