ABV_AS_BUILT_GRAWINGS_002.pdf

PDF 14 MB Posted

Attached to
UPGRADE OF PHOTOVOLTAIC SYSTEM
Solicitation number
PR8552819
Issued by

View the file

Other files

File Type Posted
ABV_AS_BUILT_DRAWINGS_001.pdf PDF
QUESTION_AND_ANSWER_-_PR_8552819_-_ABUJA_PHOTOVOLTAIC_SYSTEM_UPGRADE_001.docx DOCX document
REVISED_SOW_PHOTOVOLTAIC.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL REVIEW

AUSTIN

DALLAS

HOUSTON

WASHINGTON DC

PAG E SOUT HERL AND P AG E, L L P

3101 Wilson Blvd

Suite 300

Arlington, Virginia tel: 703 527 4100 fax: 703 522 8043 www.psp.com

ARCHITECTURE INTERIORS CONSULTING ENGINEERING

Project: NOX - ABV

SAQMMA-11-C-0236

PSP Project No.: 711082

Submittal No: 13650-001-02 Date: 28-Mar-2013

Description: Solar Photovoltaic Systems

From: Floyd Stoutt

To: Mark Wals

B.L. Harbert International, LLC

1031 London Drive, Birmingham, Alabama 35211

Copies: AST Cowen, Cervantes & Assoc, Ehlert/Bryan, Hankins & Anderson, Hinman Consulting Engineers, Schnabel Engineering, Woods Peacock Engineering Consultants, Architect’s Review:

Approved Revise and Resubmit Not Reviewed, See Comments

Approved as Noted Rejected Incomplete, Submit Additional Information

This review is only for general conformance with the design concept and the information given in the Contract Documents. Corrections or comments made on the submittal during this review do not relieve the contractor from compliance with the requirements of the plans and specifications. Approval of a specific item shall not indicate approval of an assembly of which the item is a component. The

Contractor is responsible for: dimensions to be confirmed and correlated at the job site; information that pertains solely to the fabrication processes or to the means, methods, techniques, sequences and procedures of construction; coordination of the Work with that of all other trades and performing the work in a safe and satisfactory manner.

Comments:

Please see above for the scope of work

This is accepted as submitted, no further comments

Attachments:

1. BLHI Submittal with H&A response

Reviewed By: (703) 527-4100

(signature)

March 19, 2013 box 242, harvard, massachusetts 01451-0242

(978) 456-6855 ● www.solardesign.com

Dan McAliley BL Harbert International 210 London Parkway Birmingham, AL 35211 RE: Abuja PV System Submittal Response

Dan, Following are the SDA’s responses to the concerns raised by Travis Oliver on the recent submittal package for the proposed PV system at the new parking garage structure at the Abuja NOB.

1. PV Module Mounting.

2.

Response: The PV modules are secured in a manner that is accessible from below. It has been addressed on sheet PV402, drawings 4 & 5.

Spare modules.

Sheet PV101:

Response: SDA will provide the 4 additional modules (as a no-cost add to Harbert) to close the sub-array rectangles. These additional modules will not be connected to the system. This is in addition to the spare modules that are to be set aside as attic stock, at the facility.

3. Sheet PV101 – PV Layout.

4.

Response: the PV array has been centered as requested. The DAS weather station has been indicated on detail 1.

Sheet PV101 – Plan #4 Parking Building

Sheet PV203:

. Response: The 3D view has been updated from the approved for construction drawing package.

5. Sheet PV203 – Transition Box Detail.

Sheet PV401:

Response: A note indicates to use a 12-wire cord grip and 10 fuse holders, for transition boxes 14, 15, & 16.

6. Sheet PV401 – Mounting Rails.

Sheet PV601:

Response: The spans between rail supports as designed, are typically ~7’-6” [2275 mm], and will be a maximum of ~8’-8” [2625 mm], as per the spacing of the concrete beams. Rails as supplied from the manufacturer will typically be 16 ft rails. A 16 ft rail plus another 16 ft rail cut in two segments, makes a total length to support a set of 7 modules. The splice has been indicated, and is placed according to manufacturer’s specifications.

7. Sheet PV601 – Equipment Schedule.

8.

Response: “By Harbert” has been added to items D, E, & F

Sheet PV601 – PV Module Output.

9.

Response: The electrical data of the PV module and source circuits have been updated to match the revision for the PV module Suniva MVX255. The equipment labeling is also updated accordingly.

Sheet PV601 – Line Diagram. Response: The transition boxes do not all match up one-to-one with all of the inverters. Due to the mechanical limitations of the array, some transition boxes carry source circuits of multiple inverters. All transition box outputs are routed to a wireway in each electrical room, mounted beneath the inverters. In this wireway, the source circuits shall be routed to their corresponding inverters.

March 19, 2013 box 242, harvard, massachusetts 01451-0242

(978) 456-6855 ● www.solardesign.com

10. Sheet PV601 – Inverter L.

11.

Response: Inverter L is fed by source circuits L1, L2, L3, & L4.

Transition box TB12 carries source circuits L1 & L2. Transition box 16 carries source circuits L3 & L4.

Sheet PV601 – Inverter M.

12.

Response: Inverter M is fed by source circuits M1, M2, M3, M4 & M5.

Transition box TB13 carries source circuits M1 & M2a. Transition box 16 carries source circuits M2b, M3, M4, & M5. Source circuit M2 is sourced from multiple sections of the canopy, each labeled M2a and M2b. These partial source circuits are to be connected in series, to form one source circuit. The series connection happens in the wireway in room P401, with wire connectors installed on the jumpers as needed. Four source circuits are fed to the inverter’s primary input (MPPT-A), and the remaining source circuit is fed to the inverter’s secondary input (MPPT-B). Inverter M shall have two internal surge arrestors, one for each input bus.

Sheet PV601 – Inverter N.

13.

Response: Inverter N is fed by source circuits N1, N2, N3, & N4.

Transition box TB14 carries source circuit N1. Transition box 15 carries source circuits N2, N3, & N4.

Sheet PV601 – Inverter P.

14.

Response: Inverter P is fed by source circuits P1, P2, P3, & P4.

Transition box TB15 carries source circuits P1 & P2. Transition box 16 carries source circuits P3, & P4.

Sheet PV601 – Inverter V.

15.

Response: Inverter V is fed by source circuits V1, V2, V3, & V4. Source circuit V1 is sourced from multiple sections of the canopy, each labeled V1a and V1b. These partial source circuits are to be connected in series, to form one source circuit. The series connection happens in the wireway in room P401, with wire connectors installed on the jumpers as needed.

Transition box TB12 carries source circuit V1a. Transition box 20 carries source circuits V2, V3, & V4.

Sheet PV601 – DAS Circuit Breaker.

16.

Response: The 15A 3-P breaker for DAS power & voltage tap in panel P1U2 is provided by Harbert, and this note has been added to the drawing.

HD Signal Extender –For Reference Only.

17.

Response: The DAS drawings have been updated to include the note about matching the facility voltage.

Automation Direct Boxes.

We look forward to our continued correspondence regarding this installation.

Response: Only two models of these enclosures are intended to be used in this project. Enclosure model HW-J121005SC is to be used for the fused transition boxes.

Enclosure model HW-J100804SC is to be used for the DAS Weather Station. The two box models have been marked accordingly. All box models that aren’t used for this project, have been eliminated from the documents.

Sincerely, E. Robert Erb.

Senior Project Manager | Solar Design Associates, LLC.

280 Ayer Rd. Harvard, MA 01451

(p) 978.456.6855 x 17 | (m) 617.947.8695 rerb@solardesign.com | www.solardesign.com mailto:rerb@solardesign.com� http://www.solardesign.com/�

UNCLASSIFIED

P

O

N

M

L

A

B

C

D

E

F

G

H

I

J

K

CADD Plot Scale

CADD File Name

Classification

PSP Project Number

OBO Project Number Drawing Scale

Drawing Title

United States Department of State

Washington, D.C.

WARNING:

Release For Construction:

Date

Drawn By

Checked By

This document is the property of the U.S. Government.

Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of:

U.S. Department of State ATTN: Jim Thomas Washington, D.C. 20520.

OFFICE OF OVERSEAS BUILDINGS

OPERATIONS

1:1

NEW

OFFICE ANNEX

FOR

Sheet Number

ABUJA, NIGERIA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

P

O

N

M

L

A

B

C

D

E

F

G

H

I

J

K

AS NOTED

Revisions Rev Number Revision Description Revision Date

CM, CH

RE

3/19/2013

B.L. Harbert International, L.L.C.

1030 London Dr. Suite 400 Birmingham, AL 35211 Tel (205) 802-2900

Page Southerland Page, L.L.P.

3101 Wilson Boulevard, Suite 300 Arlington, VA 22201-4419 Tel (703) 527-4100

Cervantes and Associates, P.C.

4229 Lafayette Center Drive. Suite 1125 Chantilly, VA. 20151 Tel: (703) 691-4114

Elhert /Bryan , Inc.

1451 Dolley Madison Blvd, Suite 220 Mclean, VA 22101 Tel: (703) 827-9552

Schnabel Engineering North , L.L.C.

46020 Manekin Plaza, Suite 110 Sterling, VA 20106 Tel: (703) 779-0773

Hankins and Anderson, Inc.

4880 Sadler Road Suite 300

Glen Allen, VA 23063 Tel. (804) 285-4171

Woods Peacock Engineering Consultants, Inc.

Halifax Office Park, Suite 420 5250 Cherokee Avenue

Alexandria, VA 22312-2052 Tel: (703) 658-4400

Hinman Consulting Engineers, Inc.

One Bush Street, Suite 510

San Francisco, CA 94104 Tel: (415) 621-4423

AST Cowen Design Group LLC 1451 Dolley Madison Blvd, Suite 200

McLean, VA 22207 Tel: (703) 528-4424

D

EL

IV

ER

Y

P-2

P-1

PV001

COVER SHEET

CONSTRUCTION DRAWING SET

PL

MATCH LINE

REFR. XX.XXX

"EQUAL" DIM AT CEILING

100MM

100MM

F

A C

E

DB

TYPICAL DIM ON CEILING PLAN

DOOR NUMBER

KEYNOTE NUMBER

AREA OF

ENLARGED

PLAN OR

DETAIL

ENLARGED PLAN

OR DETAIL

NUMBER

SHEET WHERE PLAN OR

DETAIL IS SHOWN

SHEET WHERE PLAN OR

DETAIL IS TAKEN

REVISION NUMBER

WINDOW NUMBER

EQUIPMENT /

FURNITURE NUMBER

PARTITION NUMBER

DRAWING WHERE

ELEVATION IS FOUND

ELEVATION NUMBER

SPOT ELEVATION

DIMENSION WHEN OCCURS

ALIGN

+100 M

WTB-2

CH-1

CO-1

A

XXX

X

XXXX

PERPENDICULAR

% PERCENT

x° DEGREE(S) OF ANGULAR MEASURE

< LESS THAN

> GREATER THAN

≤ GREATER THAN OR EQUAL TO

# POUND(S)

@ AT

= EQUAL

CENTER LINE

PROPERTY LINE

mm MILLIMETERS

M METERS

& AND

ANGLE

DIAMETER

/ DIVIDE BY, PER

x MULTIPLY BY, BY

+/- OR ± PLUS OR MINUS

NEW OR REVISED GRAPHICAL INFORMATION

GRAPHICAL INFORMATION PREVIOUSLY ISSUED

SHOULD BE ON DRAWINGS CURRENTLY (NOTE: NO CLOUDS INDICATED)

G - GENERAL PROJECT INFORMATION

TS - TOPOGRAPHIC SURVEY

SB - SOIL BORING DATA

SD - SITE DEMOLITION

C - CIVIL

L - LANDSCAPE

A - ARCHITECTURE

I - INTERIORS

S - FOUNDATION AND STRUCTURAL

M - MECHANICAL

P - PLUMBING

E - ELECTRICAL

LS - LIFE SAFETY

FP - FIRE PROTECTION AND HAZARD CONTROL

FS - FOOD SERVICE

SG - SIGNAGE AND GRAPHICS

AA - ASBESTOS ABATEMENT (HAZARD CONTROL)

VT - VERTICAL TRANSPORTATION

SET ORGANIZATION

G0000 SERIES - SYMBOLS, NOTES AND ABBREVIATIONS

A0000 SERIES - COMPOUND INFORMATION

A0100 SERIES - FULL FLOOR PLANS

A0200 SERIES - EXTERIOR ELEVATIONS

A0300 SERIES - BUILDING AND WALL SECTIONS

A0400 SERIES - ENLARGED FLOOR PLANS

A0500 SERIES - DIAGRAMS

A0600 SERIES - SCHEDULES

A0700 SERIES - STAIR INFORMATION

A0800 SERIES - EXTERIOR DETAILS

A0900 SERIES - INTERIOR DETAILS

THE FOLLOWING GENERAL NOTES APPLY TO

ALL ARCHITECTURAL DRAWINGS. FOR NOTES

APPLICABLE OTHER DISCIPLINES, REFER TO

THE INDEX OF DRAWINGS.

ALL PARTS OF THE WORK - INCLUDING

MATERIALS, METHODS, ASSEMBLIES, ETC.-

MUST COMPLY WITH THE MIN REQUIREMENTS

OF THE GOVERNING REGULATIONS OF ALL

FEDERAL, STATE, DISTRICT AND LOCAL

AUTHORITIES HAVING JURISDICTION OVER THE

PROJECT AS WELL AS THOSE GREATER

REQUIREMENTS INDICATED BY THE

CONTRACT DOCUMENTS. NO PART OF THE

CONTRACT DOCUMENTS MAY BE CONSTRUED

TO REQUIRE OR PERMIT WORK CONTRARY TO

A GOVERNING REGULATION.

THE CONTRACTOR SHALL FULLY ACQUAINT

HIMSELF WITH THE CONDITIONS OF THE

CONTRACT, LOCAL CONDITIONS RELATING TO

LOCATION, ACCESSIBILITY AND GENERAL

CHARACTER OF THE CONSTRUCTION SITE

AND LOCAL LABOR CONDITIONS SO THAT HE

UNDERSTANDS THE NATURE, THE EXTENT,

DIFFICULTIES AND RESTRICTIONS RELATED TO

THE EXECUTION OF THE WORK.

THE CONTRACTOR SHALL VERIFY

DIMENSIONS, GRADES, LEVELS, BOUNDARIES

AND CONSTRUCTION INDICATED ON

CONTRACT DRAWINGS BEFORE PROCEEDING

WITH THE WORK, AND SHALL REPORT

IMMEDIATEDLY ANY DISCREPANCIES.

THE ARCHITECTURAL DRAWINGS ARE A PART

OF A LARGER SET OF DRAWINGS WHICH, WHEN

COMPLETE, CONSISTS ON ALL THE DRAWINGS

LISTED BY THE INDEX OF DRAWINGS. THE

WORK DESCRIBED BY THE DRAWINGS OF ANY

ONE DISCIPLINE MAY BE AFFECTED BY THE

WORK DRESCRIBED ON DRAWINGS OF

ANOTHER DISCIPLINE AND MAY REQUIRE

REFERENCE TO THE DRAWING OF ANOTHER

DISCIPLINE. PARTIAL SETS OF DRAWINGS ARE

INCOMPLETE AND SHOULD NOT BE

DISTRIBUTED OR UTILIZED BY THE

CONTRACTOR. IT IS THE CONTRACTOR'S

RESPONSIBILITY TO REVIEW AND COORDINATE

THE WORK OF ALL SUB-CONTRACTORS,

TRADES, SUPPLIERS WITH THE

REQUIEREMENTS OF THE CONTRACT

DOCUMENT BEFORE COMMENCING

CONSTRUCTION, AND TO ASSURE THAT ALL

PARTIES ARE AWARE OF ALL THE

REQUIREMENTS, REGARLESS OF WHERE THE

REQUIREMENTS OCCUR IN THE CONTRACT

DOCUMENTS, WHICH MIGHT AFFECT THE

WORK OF THAT PARTY.

AS PART OF THE CONTRACTOR'S

RESPONSIBILITY TO COORDINATE THE WORK

OF ALL SUB-CONTRACTORS, TRADES AND

SUPPLIERS, THE CONTRACTOR SHALL

ENDEAVOR TO INDENTIFY AND NOTIFY THE

ARCHITECT OF ANY CONFLICTS BETWEEN THE

WORK OF DIFFERENT PARTIES AT THE

EARLIEST POSSIBLE DATE SO AS TO ALLOW

REASONABLE AND ADEQUATE TIME FOR THE

CONFLICT TO BE RESOLVED WITHOUT

DELAYING THE WORK. ALL DEVIATIONS FROM

THAT WHICH IS REQUIRED BY THE CONTRACT

DOCUMENTS MUST BE APPROVED IN ADVANCE

BY THE ARCHITECT.

THE ARCHITECTURAL DRAWINGS ESTABLISHED AND

COORDINATE THE FINISHED APPEARANCE AND EXACT

LOCATION OF ALL TRADES, INCLUDING THAT WORK

WHICH IS ILLUSTRATED PRIMARLY ON DRAWINGS OF

OTHER DISCIPLINES. LOCATIONS SHOWN ON OTHER

DRAWINGS ARE SCHEMATIC, UNLESS OTHERWISE

NOTED ON THE ARCHITECTURAL DRAWINGS. THE

ARCHITECTURAL DRAWINGS TAKE PRECEDENCE FOR

THE FINISHED APPEARANCE AND EXACT LOCATION

OF ALL PARTS OF THE WORK.

EXCEPTION: DIMENSIONED LOCATIONS SHOWN ON

DRAWINGS OF OTHER DISCIPLINES SHALL GOVERN

ONLY WHERE:

1. SPECIFICALLY AND INDIVIDUALLY

INDICATED BY SYMBOL KEYED NOTE, OR NOTATION

ON THE ARCHITECTURAL DRAWINGS.

2. OCCURING WITHIN A ROOM OR OTHER

IDENTIFIED SPACE FOR WHICH ARCH SHEET OR

SCHEDULE NOTES INDICATED THAT DIMENSIONS

PROVIDED ELSEWHERE SHALL GOVERN.

THE ARCHITECTURAL FLOOR PLANS, REFLECTED

CEILING PLANS, SECTIONS, AND ELEVATIONS

ILLUSTRATE THE EXACT LOCATION OF MANY, BUT

NOT ALL EXPOSED PARTS OF THE WORK. APPLY THE

RULES INDICATED BY THE "TYPICAL FIXTURE AND

EQUIPMENT MOUNTING HEIGHTS AND LOCATION" TO

DETERMINE THE EXACT LOCATION OF EACH

EXPOSED PART OF THE WORK.

REFER TO THE STRUCTURAL MECHANICAL,

ELECTRICAL, AND PLUMBING DRAWINGS FOR THE

DETAILED DESIGN OF STRUCTURAL, MECHANICAL,

ELECTRICAL, AND PLUMBING SYSTEMS WHICH

PORTIONS MAY BE SHOWN ON THE ARCHITECTURAL

DRAWINGS.

FINISH FLOOR ELEVATIONS ARE TO TOP OF

CONCRETE FLOOR SLAB, UON.

CEILING HEIGHT DIMENSIONS ARE TO FINISHED

SURFACES, UNLESS OTHERWISE NOTED.

FOR TYPICAL DIMENSIONING CONVENTIONS,

INCLUIDING RULES FOR LOCATING DOORS WHICH

HAVE NOT BEEN DIMENSIONED, REFER TO THE

"DIMENSIONING CONVENTIONS" NOTES ON THIS

SHEET.

FOR ILLUSTRATION AND DEFINITION OF TYP

SYMBOLS USED ON THE ARCHITECTURAL DRAWINGS,

SEE THE DRAWING "ARCHITECTURAL SYMBOLS" ON

THIS SHEET.

ADDITIONAL SYMBOLS, NOT SHOWN OR DEFINED ON

THE DRAWING "ARCHITECTURAL SYMBOLS"MAY

OCCUR AND ARE DEFINED ON OTHER

ARCHITECTURAL DRAWINGS.

BASIC FIRE PROTECTION AND EXITING CONCEPTS

ARE ILLUSTRATED BY "LIFE SAFETY PLAN"

DRAWINGS. REFER TO THE INDEX OF DRAWINGS FOR

THE LOCATION OF ADDITIONAL FLOOR PLANS,

CEILING PLANS BUILIDING SECTION, WALL SECTION,

ELEVATIONS, SCHEDULES AND DETAILS.

EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE

WORK AT THE "APPROXIMATE LOCATION SHOWN,"

DO NOT SCALE DRAWINGS FOR DIMENSIONAL

INFORMATION ALL ELEMENTS OF THE DRAWINGS

MAY NOT BE DRAWN TO SCALE. ALL DIMENSIONS

REQUIRED ARE SHOWN, OR MAY BE DERIVED FROM

THOSE SHOWN ON THE FLOOR PLANS, DETAIL

PLANS,ELEVATIONS, SECTIONS, DETAILS,

SCHEDULES, AND SPECIFICATIONS. SEE NOTES AND

ARCHITECTURAL SYMBOLS ON THIS SHEET FOR

DIMENSION CONVENTIONS USED ON THIS

PROJECT.

EXCEPT WHERE SPECIFICALLY NOTED TO THE

CONTRARY, ALL DIMENSIONS SHOWN ON THE

ARCHITECTURAL DRAWINGS CONFORM TO THE

FOLLOWING CONVENTIONS:

CENTERLINE OF EQUIPMENT OR

FURNISHING.

CENTERLINE OF OTHER FEATURES AS

INDICATED.

"FACE OF" AND "CLEAR " DIMENSIONS-

WHERE "FACE OR FINISH" OR "CLEAR"

DIMENSIONS ARE SPECIFICALLY NOTED,

DIMENSIONS IS MEASURED TO:

THE MINIMUM CLEAR DIMENSION TO THE

FINISH FACES ACROSS ANY OPEN SPACE.

FINISH FACES AT THE WIDEST OR MOST

EXPANSIVE POINTS OF THE SECTION WHEN

THE DIMENSION OCCURS AROSS AN OBJECT

OR GROUP OF OBJECTS.

EQUAL DIMENSIONS - WHERE "EQUAL"

DIMENSIONS ARE USED ON REFLECTED

CEILING PLANS TO LOCATE CEILING GRID

WORK POINTS, MEASURE DIMENSIONS

TO:

EDGE OF THE INDICATED CEILING AT THE

FACE OF THE ADJACENT APPLIED FINISH

MEASURED AT THE PLANE OF THE CEILING.

NOTE: DUE TO POSSIBLE APPLICATION OF

APPLIED FINISHED WHOSE THICKNESS MAY

VARY BETWEEN FLOOR AND CEILING AND

WHOSE THISCKNESS IS NOT ACCOUNTED

FOR ( EXCEPT AS INDICATED BY "FOF" OR

"CLEAR" BY DIM SHOWN ON THE FLOOR

PLANS, THE CONTRACTOR MUST ADJUST,

AS NECESSARY, THE DIMENSIONS TO

REFLECT CONDITIONS AT PLANE OF

CEILING.

WHERE A DOOR IS NOT SHOWN

ADJACENT TO A PERPENDICULAR WALL

AND DIMENSION F IS 16'-0" OR LESS,

LOCATE THE DOOR NO LESS THAN THE

FOLLOWING MINIMUM DIMENSIONS:

DIMENSION A = 460MM MIN.

DIMENSION B = 305MM MIN.

DIMENSION C = DOOR WIDTH + 50MM

MIN.

DIMENSION D = 100MM MIN.

DIMENSION E & F = AS SHOWN ON

PLANS.

IF SPACE ALLOWS CENTER THE DOOR

SO THAT EITHER DIMENSION A IS EQUAL

TO DIMENSION C OR DIMENSION B IS

EQUAL TO DIMENSION D.

WHERE WALLS AND/OR PARTITIONS OF

UNEQUAL THICKNESS ABUT, ALIGN

EXPOSED FACES, UON.

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

ACT ACOUSTIC(AL) CEILING TILE

ADD ADDENDUM

ADH ADHESIVE

ADJ ADJACENT

ALT ALTERNATE

ALUM ALUMINUM

ARCH ARCHITECT(URAL)

ASB ASBESTOS

ASPH ASPHALT

BM BEAM

BET BETWEEN

BLK BLOCK(ING)

BD BOARD

BLDG BUILDING

BHD BULKHEAD

BOM BOTTOM OF MULLION

BOJ BOTTOM OF JOINT

BOR BOTTOM OF REVEAL

CAB CABINET

CPT CARPET

CLG CEILING

CT CERAMIC TILE

CTR CENTER

CLR CLEAR(ANCE)

CL CLOSET

COL COLUMN

COMB COMBINATION

CONC CONCRETE

CMU CONCRETE MASONRY UNIT

CONF CONFERENCE

CONST CONSTRUCTION

CJ CONSTRUCTION JOINT

CONT CONTINUOUS

CONTR CONTRACTOR

CG CORNER GUARD

~COJ CENTER LINE OF JOINT

~COM CENTER LINE OF MULLION

~COR CENTER LINE OF REVEAL

DEMO DEMOLITION

DTL, DET DETAIL

DIAG DIAGONAL

DIA DIAMETER

DIM DIMENSION

DISP DISPENSER

DIV DIVISION

DR DOOR

DBL DOUBLE

DN DOWN

DWR DRAWER

DWG DRAWING

DF DRNKING FOUNTAIN

EA EACH

EIFS EXT. INSULT. FIN. SYSTEM

ELEC ELECTRIC(AL)

EWC ELECTRIC WATER COLLER

EL ELEVATION

ELEV ELEVATOR

ENCL ENCLOSE(URE)

EOS EDGE OF SLAB

EQ EQUAL

EX EXISTING

EJ EXPANSION JOINT

EXP EXPOSED, EXPANSION

EXT EXTERIOR

FF FINISHED FLOOR

FIN FINISH(ED)

FA FIRE ALARM

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FVC FIRE VALVE CABINET

FR FIRE RATED(ING)

FRP FIBERGLASS REINF.

POLYESTER

FRT FIRE RETARDANT

TREATED

FL, FLR FLOOR(ING)

FD FLOOR DRAIN

FOF FACE OF FINISH

FUR FURR(ING)

GALV GALVANIZED

GA GAUGE

GWB GYPSUM WALL BOARD

GL GLASS

H HAND

HP HIGH POINT

HC HOLLOW CORE

HM HOLLOW METAL

HORZ HORIZONTAL

H&V HORIZONTAL AND

VERTICAL

HR HOUR

HCP HANDICAPPED

INCL INCLUDE(D)(ING)

ID INSIDE DIAMETER

INSUL INSULATE(D)(ION)

INT INTERIOR

JC JANITORS CLOSET

JT, J JOINT

KD KNOCK DOWN

KIT KITCHEN

LAM LAMINATE

LAV LAVATORY

LBL LABEL

LEV LEVEL

LH LEFT HAND

LT LIGHT

LWC LIQUID WALL COVERING

LG LONG, LENGTH

LP LOW POINT

MFR MANUFACTURER

MO MASONRY OPENING

MTL METAL

MAX MAXIMUM

MECH MECHANICAL

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MOV MOVABLE

MUL MULLION

MACH MACHINE

NOM NOMINAL

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NO NUMBER

N/A NOT APPLICABLE

NFGH NON-FREEZE GROUND

HYDRANT

OFF OFFICE

OC ON CENTER

OPNG OPENING

OPP OPPOSITE

OD OUTSIDE DIAMETER

OA OVERALL

OH OVERHEAD

PTD, P PAINTED

PR PAIR

PNL PANEL

PBD PARTICLE BOARD

PTN PARTITION

PERF PERFORATED

PLAS PLASTER

PLAM, PL PLASTER

LAMINATE

PWD PLYWOOD

PT POINT

PC PRECAST CONCRETE

PROJ PROJECTED(ION)

QT QUARRY TILE

RAD, R RADIUS

REF REFERENCE

REINF REINFORCE(D)(ING)

REQ REQUIRED

RES RESILIENT

REV REVISION

RH RIGHT HAND

R RISER

R REVEAL

RD ROOF DRAIN

RM ROOM

RO ROUGH OPENNING

RB RUBBER BASE

SAB SOUND ATTENUATION

BLANKET

SCHD SCHEDULE

SEC SECTION

SF SQUARE FOOT

SH SHELF, SHELVING

SHT SHEET

SIM SIMILAR

SC SOLID CORE

SPEC SPECIFICATION,

SPECIFIED

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STOR STORAGE

STR STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

TBL TABLE

TEL TELEPHONE

THK THICK(NESS)

THRES THRESHOLD

TLT TOILET

TMPD TEMPERED

TOB TOP OF BEAM

TOS TOP OF STEEL

T TREAD

TYP TYPICAL

TOM TOP OF MULLION

TOJ TOP OF JOINT

TOR TOP OF REVEAL

UC UNDERCUT

UNF UNFINISHED

UON UNLESS OTHERWISE

NOTED

VIF VERIFY IN FIELD

VB VINYL BASE

VERT VERTICAL

VCT VINYL COMPOSITION

TILE

VWC VINYL WALL COVERING

WC WALL COVERING

WP WATERPROOFING

W/ WITH

W/O WITHOUT

WD WOOD

WR WATER RESISTANCE

ELEVATION

SECTION

COLUMN

CENTERLINE

INDICATION

ROOM NUMBER

INDICATION

SECTION NUMBER

SHEET CUT INDICATION

SHEET WHERE SECTION IS

SHOWN

SHEET WHERE

SECTION IS TAKEN

GRID

ROOM DESIGNATOR

NORTH ARROW

ENLARGED PLAN OR DETAIL

DOOR TAGREVISION NUMBER

SPOT ELEVATION

WINDOW TAG

EQUIPMENT / FURNITURE TAG

KEYNOTES

PARTITION TAG

MATCH LINE

MEASURED TO FACE OF PARTITION

MEASURE TO FACE OF PARTITION

FINISHED WOOD

WOOD BLOCKING

INTERMITENT, NON

DIMENSIONED

WOOD FRAMING OR CONTINIOUS

CONCRETE BLOCK UNIT

CONCRETE

PRECAST

EARTH

ALUMINUM

STEEL

GRAVEL

SAND OR PLASTER

BATT INSULATION

RIGID INSULATION

SEMI RIGID INSULATION

AIR/VAPOUR BARRIER

SOUND INSULATION

A0.111

DISCIPLINE DESIGNATOR

VOLUME DESIGNATOR

SHEET DESIGNATOR

ABBREVIATIONABBREVIATIONS REFERENCE SYMBOLS ARCHITECTURAL GENERAL NOTES ARCHITECTURAL DIMENSIONING CONVENTIONS

SYMBOLS AS ABBREVIATIONS MATERIAL SYMBOLS SHEET NUMBERING SYSTEM VICINITY PLAN

DELTA GRAPHIC LEGEND/ DESCRIPTION

4#

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

TYPICAL DIMENSIONS: DIMENSIONS,

UNLESS OTHERWISE NOTED, ARE TO THE

FINISHED FACE OF AN ASSEMBLY OR

OBJECT AND ARE MEASURED TO:

FACE OF CONCRETE OR C.M.U. WALL

(EXCLUSIVE OF APPLIED FINISHES HAVING

THICKNESS OR FURRING WHICH MAY BE

ADDED TO THE FACE OF SUCH WALLS.

FACE OF PARTITION ASSEMB (EXCLUSIVE OF

APPLIED FINISHES HAVING THICKNESS WHICH

MAY BE ADDED TO SUCH WALLS) AS DEFINED

BY THE PARTITION SCHEDULE. UNLESS

NOTED AS A "FACE OF FINISH" OR "CLEAR"

DIMENSION (SEE NOTES BELOW),

DIMENSIONS ARE NOT MEASURED TO THE

FACE OF APPLIED FINISH. REFER TO THE

"PARTITION SCHEDULE" TO DETERMINE THE

THICKNESS OF EACH PARTITION ASSEMBLY

TYPE.

INSIDE EDGE OF FINISHED DOOR OPENING.

REFER TO "DOOR SCHEDULE" FOR

ADDITIONAL INFORMATION.

DIMENSION OR WORK POINT AS INDICATED

ON RELATED ARCHITECTURAL DETAIL PLAN,

SECTION, ELEVATION, CONFIGURATION

DETAIL, OR CONSTRUCTION DETAIL.

CENTERLINE DIMENSIONS: REFER TO

"SYMBOLS AS ABBREVEATIONS" THIS SHEET

FOR ILLUSTRATION OF THE SYMBOL USED

TO INDICATE A CENTERLINE DIMENSION.

DIMENSIONS UTILIZING THE "CENTERLINE"

SYMBOL ARE MEASURED TO:

STRUCTURAL OR DIMENSIONAL GRID LINES

CENTERLINE OF CONCRETE OR C.M.U.

WALL (EXCLUSIVE OF APPLIED FINISHED

HAVING THICKNESS OR FURRING). REFER

TO THE ARCHITECTURAL PLANS AND

SECTIONS. THE ARCHITECTURAL DRAWINGS,

OR THE PARTITION SCHEDULE TO

DETERMINETHE THICKNESS OF CONCRETE

OR CONCRETE MASONRY UNIT WALLS.

CENTERLINE OF PARTITION ASSEMBLY

(EXCLUSIVE OF ANY APPLIED FINISHES

HAVING THICKNESS WHICH MAY BE ADDED

TO SUCH WALLS) AT PARTITIONS FRAMED

WITH METAL STUDS. REFER TO "PARTITION

SCHEDULE" TO DETERMINE THE THICKNESS

OF EACH PARTITION ASSEMBLY TYPE.

CENTERLINE OF DOOR, WINDOW, OR

LOUVER OPENNING.

WHERE DIMENSIONS ARE NOT PROVIDED ON

THE FLOOR PLANS TO LOCATE DOOR

OPENING, APPLY THE FOLLOWING RULES, IN

ORDER, TO DETERMINE THE LOCATION OF

DOOR OPENINGS.

DOOR OPENINGS MAY BE DIMENSIONED ON

DWGS OTHER THAN THE FLOOR PLANS,

REFER TO THE SECTIONS, ELEVATIONS,

DETAILS, AND DOOR SCHEDULE NOTES FOR

ADDITIONAL DIMENSIONAL INFORMATION.

WHERE THE HINGE-SIDE OF A DOOR

IS SHOWN ADJACENT TO A WALL, OR

WALLS, PERPENDICULAR TO THE WALL IN

WHICH THE DOOR OPENING OCCURS,

LOCATE THE HINGE-SIDE FINISHED EDGE OF

THE DOOR OPENNING 100MM FROM THE

FACE(EXCLUSIVE OF ANY APPLIED FINISH)

OF THE CLOSEST PERPENDICULAR OR

PARTITION ASSEMBLY.

1.

A.

2.

B.

3.

C.

D.

A.

B.

4.

AX.XXX AX.XXX

X

AX.XXX AX.XXX

X

WOOD SUBSTRATE

W-1

GPE NUMBER (IF APPLICABLE)

SPOT/CEILING ELEVATION2.75

SPOT CEILING ELEVATION

CONSTITUTION AVE.

INDEPENDENCE AVE.

MOSHOOD ABIOLA RD.

NNAMDI AZIKIWE EXPRESS WAY

TAFAWA BALLEWA WAY

OLUSEGUN OBASANJO WAY

MOHAMMADU BUHARI WAY

HERBERT MACAULAY

ZAKARIA MAIMALARI ST

UNCLASSIFIED

A

CADD Plot Scale

CADD File Name:

Classification

PSP Project Number

OBO Project Number: Drawing Scale

Drawing Title

A/OBO/PE/PM A/OBO/PE/BDE

United States Department of State

Washington, D.C.

WARNING:

Release For Construction:

Date

Drawn By

Checked By

This document is the property of the U.S. Government.

Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of:

U.S. Department of State ATTN: Jim Thomas Washington, D.C. 20520.

OFFICE OF OVERSEAS BUILDINGS OPERATIONS

1:1

Sheet Number

DE

LIV

ER

Y

TO

OB

O

P1

CD-1

M

AR

ABVH

B.L. Harbert International, L.L.C.

820 Shades Creek Pkwy, Suite 3000 Birmingham, AL 35209 Tel (205) 802-2800

Page Southerland Page, L.L.P.

3101 Wilson Blvd, Suite 300 Arlington, VA 22201-4419 Tel (703) 527-4100

Cervantes & Associates, P.C.

4229 Lafayette Center Dr, Suite 1125 Chantilly, VA 20151 Tel: (703) 691-4114

Ehlert /Bryan, Inc.

1451 Dolley Madison Blvd, Suite 220 McLean, VA 22101 Tel: (703) 827-9552

Schnabel Engineering North, L.L.C.

46020 Manekin Plaza, Suite 110 Sterling, VA 20166 Tel: (703) 779-0773

NEW OFFICE ANNEX

ABUJA, NIGERIA

Hankins and Anderson, Inc.

4880 Sadler Rd, Suite 300

Glen Allen, VA 23060 Tel. (804) 285-4171

Woods Peacock Engineering Consultants, Inc.

Halifax Office Park, Suite 420

5250 Cherokee Ave Alexandria, VA 22312-2052

Tel: (703) 658-4400

Hinman Consulting Engineers, Inc.

One Bush St, Suite 510

San Francisco, CA 94104 Tel: (415) 621-4423

AST Cowen Design Group LLC 1451 Dolley Madison Blvd, Suite 200

McLean, VA 22207 Tel: (703) 528-4424

P2

CD

IFC

M

AY

JU

N

A

UG

711082

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

171 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

CDBC IFC

CD-2

O

CT

CDBC

D

EC

1 : 10

11/30/2012 4:29:39 PM

C :\U se rs

\m ic ha el r\D es kt op

\R ev it Fi le s\

A

B V\

A B

VH

A

_P K

G _m ic ha el r.r vt

FFS

TM A8.001

A8.001

ARCHITECTURAL LEGEND,

NOTES & ABBREVIATIONS

SAQMMA-11-C-0236

04 DECEMBER 2012

PKG

REVISIONS

NUMBER DESCRIPTION DATE

1 SAMPLE OF SIMILAR RAIL-MOUNTED PV ARRAY

2 LOCUS MAP

SHEET INDEX

ID

PV001

PV002

PV101

PV102

PV201

PV202

PV203

PV301

PV401

PV402

PV501

PV601

PV602

Name

COVER SHEET

PV SYSTEM NOTES

PV LAYOUT

STANDOFF & ATTACHMENT LAYOUT

SOURCE CIRCUIT WIRIING

TRANSITION BOX WIRING

WIRING DETAILS

CONDUIT, WIRING AND GROUNDING LAYOUT

STRUCTURAL ELEVATION

STRUCTURAL DETAILS

ELECTRICAL EQPT. PLAN

SINGLE LINE

LABELS

Published

SITE INFORMATION

PROJECT NAME: UNITED STATES EMBASSY

PHOTOVOLTAIC SYSTEM INSTALLATION

ADDRESS: AMERICAN EMBASSY

INDEPENDENCE AVENUE

ABUJA, NIGERIA

APPLICABLE US 2009 INTERNATIONAL BUILDING CODE

BUILDING CODES U.S. UNIFORM FEDERAL ACCESSIBILITY STANDARDS

FOR NEW CONSTRUCTION NATIONAL ELECTRIC CODE 2008

APPROXIMATE PV AREA 1,885 SQUARE METERS

DC SYSTEM RATING 294.5 kW AC SYSTEM POWER RATING 285 kW

PHOTOVOLTAIC PARKING CANOPY

U.S. EMBASSY

ABUJA, NIGERIA

ABBREVIATIONS

ABV ABOVE

AC ALTERNATING CURRENT

ADJ ADJACENT

AFF ABOVE FINISH FLOOR

AGG AGGREGATE

ALT ALTERNATIVE

ALUM ALUMINUM

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECT(URAL)

BD BOARD

BEV BEVELED

BLDG BUILDING

BLK BLOCK(ING)

B.M. BENCH MARK

BOT BOTTOM

BRG BEARING

BRZ BRONZE

BSMT BASEMENT

BTU BRITISH THERMAL UNIT

BETW, BTWN BETWEEN

CAB CABINET

CB CATCH BASIN

C/C CENTER TO CENTER

CEM CEMENT

CIR CIRCLE

CJ CONTROL JOINT

CLG CEILING

CLOS CLOSET

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACTOR

CNDT CONDUIT

CTR CENTER

DAS DATA AQUISITION SYSTEM

DC DIRECT CURRENT

DEG DEGREE

DEPT DEPARTMENT

DEMO DEMOLISH/DEMOLITION

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DISC DISCONNECT

DIV DIVISION

DN DOWN

DP DAMP PROOFING

DR DOOR

DWG DRAWING

E EAST

EA EACH

EG EXHAUST GRILLE

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATION

EP ELECTRICAL PENTHOUSE

EPDM RUBBER ROOFING MEMBRANE

EQ EQUAL

EQPT EQUIPMENT

EQV EQUIVALVENT

EX, EXT'G EXISTING

EXP EXPANSION

EXT EXTERIOR

FDN FOUNDATION

FT FOOT OR FEET

FT-LBS FOOT POUNDS (UNIT OF TORQUE)

FTG FOOTING (AS IN SUPPORT)

GA GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GL GLASS

GOVT GOVERNMENT

GRD GROUND

HC HANDICAPPED

HDW HARDWARE

HDWD HARDWOOD

HGT HEIGHT

HM HOLLOW METAL

HORZ HORIZONTAL

HR HOUR

HTG HEATING

HTR HEATER

HVAC HEATING, VENTILATING AND A/C

ID INTERIOR DIAMETER

IN INCH

INCL INCLUDE(ED)(ING)

INFO INFORMATION

INSUL INSULATION

INV INVERTER

JAN JANITOR

JC JANITOR'S CLOSET

JCT JUNCTION

JT JOINT

KD KNOCK DOWN

KO KNOCKOUT

KPL KICKPLATE

KW KILOWATT (UNIT OF POWER)

KWH KILOWATT-HOUR (UNIT OF ENERGY)

LBL LABEL

LBS POUNDS (UNIT OF WEIGHT & FORCE)

LF LIGHT FIXTURE

LG LONG

LH LEFT HAND

LL LIVE LOAD

LT LIGHT

LT WT LIGHT WEIGHT

MAS MASONRY

MAX MAXIMUM

MECH MECHANICAL

MED MEDIUM

MEMB MEMBRANE

MEZZ MEZZANINE

MFG MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MIX MIXTURE

MM MILLIMETERS

MNTD MOUNTED

MO MASONRY OPENING

MOD MODULAR

MTG HT MOUNTING HEIGHT

MTL METAL

MULL MULLION

MULT MULTIPLE

N NORTH

NEC NATIONAL ELECTRIC CODE

NEG NEGATIVE

NIC NOT IN CONTRACT

NO NUMBER

NOB NEW OFFICE BUILDING

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

O.C. ON CENTER

OD OUTSIDE DIAMETER

OFF OFFICE

OPG OPENING

OPL ORNAMENTAL PLASTER

OPP OPPOSITE

ORIG ORIGINAL

ORN ORNAMENTAL

PAR PARALLEL

PERF PERFORATED

PERP PERPENDICULAR

PNTH PENTHOUSE

PKG PARKING FACILITY

PLAM PLASTIC LAMINATE

PLMB PLUMBING

PLWD PLYWOOD

PNTD PAINTED

P.O.C.C. POINT OF COMMON COUPLING

POL POLISHED

POS POSITIVE

PREP PREPARATION

PROJ PROJECT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PV PHOTOVOLTAIC

QTY QUANTITY

RAD RADIUS

RB RESILIENT BASE

RC REINFORCED CONCRETE

RD ROOF DRAIN

RECP RECEPTACLE

REF REFERENCE

REFR REFRIGERATOR

REG REGISTER

REINF REINFORCEMENT

REPRO REPRODUCE

REQ'D REQUIRED

RES RESILIENT BASE

REV REVISION

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

RWB RESILIENT WALL BASE

S SOUTH

SAD SEE ARCHITECTURAL DRAWINGS

SC SOLID CORE

SCH SCHEDULE

SECT SECTION

SERV SERVICE

SH SHELF, SHELVING

SHT SHEET

SIM SIMILAR

SM SHEET METAL

SPEC SPECIFICATIONS

SPX SERVICE ANNEX BUILDING

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STOR STORAGE

STRUC STRUCTURE

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPENDED

SYS SYSTEM

SYM SYMETRICAL

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERED

THK THICK

THR THRESHOLD

THRU THROUGH

TO TOP OF

TPL TEXTURED PLASTER

TRANS TRANSPARENT

TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR

TYP TYPICAL

T&G TONGE AND GROOVE

UG UNDERGROUND

UNO UNLESS NOTED OTHERWISE

UV UNIT VENTILATOR

VENT VENTILATE/VENTILATION

VERT VERTICAL

VIF VERIFY IN FIELD

VOL VOLUME

VP VENT PIPE

VS VERSUS

W WEST

W/ WITH

WD WOOD

WDW WINDOW

WM WIRE MESH

W/O WITHOUT

WP WORKING POINT

WS WEATER STRIPPING

WT WEIGHT

+ POSITIVE

- NEGATIVE

1° FIXED TILT PV ARRAY

AZIMUTH: 0.00° E OF S

MODULES DC POWER AC POWER ANNUAL AC

ENERGY

1155/ 255W 294.5 kWdc 285 kWac 414,098 kWhr/yr

NOTES

1. SYSTEM DESIGN IS BASED ON THE FOLLOWING INFORMATION:

A) CONSTRUCTION DOCUMENTS BY B.L. HARBERT INTERNATIONAL

B) DESIGN REQUIREMENTS AS SPECIFIED BY U.S. DEPT OF STATE

2. CONTRACTOR SHALL VERIFY EXISTING CONSTRUCTION DOCUMENTS

PRIOR TO PROCEEDING WITH WORK IN THIS CONTRACT.

NOTIFY U.S. GOVERNMENT PROJECT DIRECTOR OF

ANY DISCREPANCIES IN THE DRAWINGS.

3. LOCATE AND MARK ALL UNDERGROUND UTILITIES IN THE

AREA OF WORK PRIOR TO CONSTRUCTION, IF REQUIRED.

4. DECIMAL INDICATOR: PERIOD (.)

5. NUMBER SEPARATOR: COMMA (,)

6. ALL DISTANCE UNITS ARE MILLIMETERS, UNLESS OTHERWISE NOTED

O

N

M

L

A

B

C

D

E

F

G

H

I

J

K

CADD Plot Scale

CADD File Name

Classification

PSP Project Number

OBO Project Number Drawing Scale

Drawing Title

United States Department of State

Washington, D.C.

WARNING:

Release For Construction:

Date

Drawn By

Checked By

This document is the property of the U.S. Government.

Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of:

U.S. Department of State ATTN: Jim Thomas Washington, D.C. 20520.

OFFICE OF OVERSEAS BUILDINGS

OPERATIONS

1:1

NEW

OFFICE ANNEX

FOR

Sheet Number

ABUJA, NIGERIA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

P

O

N

M

L

A

B

C

D

E

F

G

H

I

J

K

AS NOTED

Revisions Rev Number Revision Description Revision Date

CM, CH

RE

3/19/2013

B.L. Harbert International, L.L.C.

1030 London Dr. Suite 400 Birmingham, AL 35211 Tel (205) 802-2900

Page Southerland Page, L.L.P.

3101 Wilson Boulevard, Suite 300 Arlington, VA 22201-4419 Tel (703) 527-4100

Cervantes and Associates, P.C.

4229 Lafayette Center Drive. Suite 1125 Chantilly, VA. 20151 Tel: (703) 691-4114

Elhert /Bryan , Inc.

1451 Dolley Madison Blvd, Suite 220 Mclean, VA 22101 Tel: (703) 827-9552

Schnabel Engineering North , L.L.C.

46020 Manekin Plaza, Suite 110 Sterling, VA 20106 Tel: (703) 779-0773

Hankins and Anderson, Inc.

4880 Sadler Road Suite 300

Glen Allen, VA 23063 Tel. (804) 285-4171

Woods Peacock Engineering Consultants, Inc.

Halifax Office Park, Suite 420 5250 Cherokee Avenue

Alexandria, VA 22312-2052 Tel: (703) 658-4400

Hinman Consulting Engineers, Inc.

One Bush Street, Suite 510

San Francisco, CA 94104 Tel: (415) 621-4423

AST Cowen Design Group LLC 1451 Dolley Madison Blvd, Suite 200

McLean, VA 22207 Tel: (703) 528-4424

D

EL

IV

ER

Y

P-2

P-1

PV002

PV SYSTEM NOTES

CONSTRUCTION DRAWING SET

PROCEDURAL NOTES:

1. PRIOR TO COMMENCEMENT OF ANY WORK, THE CONTRACTOR SHALL NOTIFY ENGINEER OF RECORD OF ANY DISCREPANCIES

NOTED TO EXISTING CONDITIONS, STRUCTURE, ELECTRICAL RUNS (SPECIFY EXISTING ITEMS). AMONG SITE CONDITIONS, MANUFACTURER RECOMMENDATIONS OR CODES, REGULATIONS OR RULES OF JURISDICTIONS HAVING AUTHORITY.

2. ALL DIMENSIONS OF EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO COMMENCING WORK.

3. THE CONTRACTOR IS RESPONSIBLE FOR ALL BRACING AND SHORING OF EQUIPMENT DURING INSTALLATION.

4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS, OSHA REQUIREMENTS AND SAFETY MEASURES ON

SITE. THE ENGINEER HAS NO OVERALL SUPERVISORY AUTHORITY AND NO DIRECT RESPONSIBILITY FOR THE SPECIFIC WORKING

CONDITIONS OR FOR POSSIBLE EXISTING HAZARDS.

5. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE ENGINEER OF RECORD FOR APPROVAL PRIOR

TO MAKING ANY CHANGES.

6. APPROVED CHANGES SHALL REQUIRE A DRAWING REVISION TO MAINTAIN CONTROL OVER THE ENGINEER APPROVED DESIGN. DEVIATION FROM THESE PLANS PRIOR TO ENGINEER APPROVAL PLACES ALL LIABILITY ON THE CONTRACTOR.

GENERAL NOTES:

1. STRUCTURAL FIELD CONDITIONS ARE TO BE DETERMINED BY OTHERS, AND PLANS ARE TO BE MODIFIED AS NEEDED/IF

APPROPRIATE. DEFICIENCIES SHOULD BE NOTED AND CORRECTED PRIOR TO THE START OF CONSTRUCTION.

2. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EQUIPMENT AND FOLLOWING ALL MANUFACTURER'S

OR ENGINEER'S DIRECTIONS AND INSTRUCTIONS SHOWN ON CONSTRUCTION DOCUMENTS.

3. THE ELECTRICAL CONTRACTOR IS ADVISED THAT UTILITY INTERCONNECTION REQUIREMENTS AND ALL DRAWINGS, COMPONENT MANUALS, ESPECIALLY THE INVERTER MANUALS, ARE TO BE READ AND UNDERSTOOD PRIOR TO INSTALLATION OR

ENERGIZING OF ANY EQUIPMENT.

4. THE CONTRACTOR IS ALSO ADVISED TO HAVE ALL COMPONENT & SWITCHES IN THE OFF (OPEN) POSITION AND FUSES

REMOVED PRIOR TO INSTALLATION OF FUSE-BEARING COMPONENTS.

5. THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO BE INSTALLED FOLLOWING THE CONVENTIONS OF THE NATIONAL ELECTRIC CODE

AND ANY LOCAL CODE WHICH MAY SUPERSEDE THE NEC SHALL GOVERN.

6. ALL COMPONENTS TO BE INSTALLED WITH THIS SYSTEM ARE TO BE LISTED BY A THIRD PARTY TESTING AGENCY (UL, ETL, ETC.). EQUIPMENT SHALL BE NEMA 3R OUTDOOR RATED OR BETTER, UNLESS LOCATED INDOORS. EQUIPMENT INSTALLED

INDOORS MAY BE RATED NEMA 1.

7. DC VOLTAGE FROM THE ARRAY IS ALWAYS PRESENT AT THE DC COMBINER ENCLOSURES AND THE DC TERMINALS OF THE INVERTER DURING DAYLIGHT HOURS. ALL PERSONS WORKING ON OR INVOLVED WITH THIS PHOTOVOLTAIC SYSTEM MUST BE WARNED THAT SOLAR MODULES ARE ENERGIZED WHEN EXPOSED TO DAYLIGHT. THE LINE AND LOAD TERMINALS ON THE DC DISCONNECTS MAY BE ENERGIZED IN THE OFF (OPEN) POSITION AND THE SWITCH IS TO BE LABELED TO COMPLY WITH ARTICLE

690.17 OF THE NEC REFLECTING THIS.

8. ALL PORTIONS OF THIS SOLAR ELECTRIC SYSTEM SHALL BE CLEARLY MARKED IN ACCORDANCE WITH THE NATIONAL

ELECTRIC CODE ARTICLE 690.

9. THE ELECTRICAL CONTRACTOR SHALL PERFORM INITIAL HARDWARE CHECKS AND PV WIRING CONDUCTIVITY CHECKS PRIOR TO TERMINATING ANY WIRES. ALL AC AND DC WIRE RUNS SHALL BE MEGGER TESTED AT 1000 VDC TO DEMONSTRATE A MINIMUM

OF 5 MEGAOHMS INSULATION RESISTANCE TO GROUND.

10. DO NOT MEGGER THE SOLAR MODULES, AS THIS WILL LIKELY DAMAGE THEIR INTERNAL DIODES. MEGGERING IS INTENDED FOR ALL CONDUCTORS INSTALLED BY THE ELECTRICAL CONTRACTOR. RESTRICT MEGGER TO 1000v

11. FOR PROPER MAINTENANCE AND ISOLATION OF INVERTERS, REFER TO ISOLATION PROCEDURE IN INVERTER OPERATION MANUAL. CONTRACTOR PERFORMING THE MAINTENANCE IS RESPONSIBLE TO FOLLOW ALL LOCKOUT TAGOUT PROCEDURES.

12. THIS PHOTOVOLTAIC SYSTEM'S UTILITY INTERCONNECTION POINT SHALL MEET THE SPECIFIC REQUIREMENTS OF ARTICLE 690.64, NATIONAL ELECTRIC CODE. PLEASE FOLLOW THE SPECIFIC INSTRUCTIONS IN THIS DRAWING SET TO MEET THIS CODE

REQUIREMENT.

13. THE GROUNDING OF THE PHOTOVOLTAlC SYSTEM SHALL COMPLY WITH NEC 690.45 AND NEC 690.47. IF THE REQUIREMENTS DESCRIBED IN THIS DRAWING SET ARE CLOSELY FOLLOWED, THE GROUNDING REQUIREMENT WILL BE MET. ANY CHANGES WILL NEED TO BE REVIEWED AND DEEMED ACCEPTABLE BY THE ENGINEER, MANUFACTURER AND LISTING AGENCY FOR PRODUCT

SAFETY.

14. THE ELECTRICAL CONTRACTOR IS NOT TO START OR COMMISSION THE PV OR INVERTER SYSTEM AT ANY TIME, UNLESS

NOTIFIED OTHERWISE IN WRITING. THIS WILL BE DONE BY OTHERS.

15. THE CONTRACTOR IS RESPONSIBLE FOR MOUNTING ALL EQUIPMENT PER THE ENGINEER'S INPUT OR MANUFACTURER'S SPECIFICATIONS. IF SPECIFICATIONS ARE NOT APPARENT, THE CONTRACTOR SHALL USE DILIGENT EFFORTS TO MOUNT EQUIPMENT SUCH THAT IT WILL BE CLEAN, LEVEL AND SOLID IN ORDER TO LAST THE LIFETIME OF THIS SOLAR ELECTRIC SYSTEM.

16. ANY METAL SHAVINGS RESULTING FROM SITE WORK SHALL BE CLEANED FROM ENCLOSURE INTERIORS, TOP SURFACES OF ENCLOSURES, ROOF SURFACE, GROUND SURFACE AND ANY ADDITIONAL AREAS WHERE OXIDIZED OR CONDUCTIVE METAL

SHAVINGS MAY CAUSE RUST, ELECTRICAL SHORT CIRCUITS OR OTHER DAMAGE

17. ALL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER, RECTILINEAR TO THE STRUCTURE.

18. ALL COMPONENTS SHOWN ON THE SINGLE LINE DIAGRAM, BUT NOT ON THE PLAN OR VICE VERSA, SHALL BE INCLUDED AS IF

SHOWN ON BOTH.

19. CONTRACTOR SHALL REVIEW ALL TRADES' CONTRACT DOCUMENTS TO DETERMINE SPECIFIC MOUNTING LOCATIONS FOR

ELECTRICAL EQUIPMENT. COORDINATE EXACT MOUNTING LOCATIONS.

20. THE CONTRACTOR SHALL REVIEW THE ARCHITECTURAL AND MECHANICAL DRAWINGS AND COORDINATE THE ELECTRICAL

WORK WITH THE OTHER CONTRACTORS. SHOULD CONFLICTS, DISCREPANCIES, OR DEFICIENCIES, ARISE WHICH REQUIRE CHANGES IN THE CONTRACT DOCUMENTS, IMMEDIATELY NOTIFY THE ENGINEER. OBTAIN WRITTEN DIRECTION ON NECESSARY

ADJUSTMENTS BEFORE THE INSTALLATION IS MODIFIED.

21. ALL COMPONENTS SHOWN ON THE RISER DIAGRAMS, BUT NOT ON THE PLAN OR VICE VERSA, SHALL BE INCLUDED AS IF

SHOWN ON BOTH.

22. THE DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF NEW CIRCUITS, NUMBERS OF CIRCUITS, LOCATIONS OF OUTLETS, AND THE INTERCONNECTION. THE CONTRACTOR MAY MODIFY THE RACEWAY ARRANGEMENT TO ACCOMMODATE FIELD

CONDITIONS.

23. ALL NEW CIRCUITRY SHALL BE ACCURATELY RECORDED BY THE CONTRACTOR TO BE INCORPORATED IN TO A RECORD SET

OF AS-BUILT DRAWINGS ISSUED UPON COMPLETION OF INSTALLATION PRIOR TO START UP.

24. PROVIDE COMPLETE, ACCURATE, LAMINATED AND TYPED PANELBOARD CIRCUIT DIRECTORIES AT THE COMPLETION OF WORK

FOR ALL PANELS IN THIS PROJECT.

25. LAYOUT ALL WORK IN ADVANCE. WHERE CUTTING, CHANNELING, CHASING OR DRILLING OF FLOORS, WALLS PARTITIONS, CEILINGS OR OTHER SURFACES IS NECESSARY FOR SUPPORT OR ANCHORAGE OF RACEWAYS, OUTLETS OR ELECTRICAL EQUIPMENT, THIS WORK SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR. ANY DAMAGE TO PIPING, EQUIPMENT OR DEFACED FINISH, OR METALWORK SHALL BE REPAIRED BY SKILLED CRAFTSMEN OF TRADES INVOLVED AT NO ADDITIONAL COST TO THE OWNER. DO NO CUTTING, CHANNELING, DRILLING, WELDING OF STRUCTURAL MEMBERS OF THE BUILDING WITHOUT

OBTAINING APPROVAL FROM THE ENGINEER.

26. SWITCHES SHALL BE MARKED AND IDENTIFIED WITH E-Z MARKERS OR DYMOTAPED AND PEN-MARKED (WITH PERMANENT MARKER) INSIDE COVER TO SHOW PANEL AND CIRCUIT BREAKER NUMBER. WIRES SHALL BE MARKED WITH CIRCUIT NUMBERS

USING BRADY MARKERS (OR EQUAL) AT PANEL.

27. ALL ARRAY WIRING MAY BE RUN EXPOSED UNLESS SPECIFIED OTHERWISE.

28. DO NOT INSTALL DC FEEDER CONDUITS IN A CONCEALED MANNER. AC CONDUITS MAY BE INSTALLED IN A CONCEALED

MANNER UNLESS OTHERWISE NOTED.

29. MINIMUM SIZE BRANCH CIRCUIT CONDUIT SHALL BE 1 IN.

30. EMPTY CONDUITS SHALL BE PROVIDED WITH NYLON PULL STRING.

31. PROVIDE INSULATED GROUND WIRE (THHN/THWN) FOR ALL BRANCH CIRCUITS.

32. PROVIDE SEPARATE INSULATED EQUIPMENT GROUNDING CONDUCTOR WITH ALL BRANCH CIRCUITS. TERMINATE EACH END

ON A GROUNDING LUG, BUS, OR BUSHING.

33. PROVIDE CIRCUIT NUMBER IDENTIFICATION MARKERS ON ALL CONDUCTORS, NEUTRALS, AND GROUNDS IN ALL

PANELBOARDS, BOXES, AND OUTLETS.

34. THE CONTRACTOR SHALL INFORM THE ENGINEER OF ALL DISCREPANCIES BETWEEN DRAWINGS OF DIFFERENT TRADES, PRIOR TO INITIATION OF ANY WORK.

35. THE CONTRACTOR IS FULLY RESPONSIBLE FOR ON-SITE SAFETY OF THE SITE WORKERS AND THE GENERAL PUBLIC DURING

CONSTRUCTION.

36. THE CONTRACTOR WILL FURNISH AND INSTALL ALL ANCHOR BOLTS, NUTS, WASHERS, GROUT, CONCRETE PADS, AND

REINFORCING STEEL REQUIRED FOR PROPER INSTALLATION OF ANY EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S

REQUIREMENTS.

37. ALL CONTRACTORS ARE REQUIRED TO EXAMINE THE DRAWINGS AND SPECIFICATIONS CAREFULLY, TO VISIT THE SITE AND FULLY INFORM THEMSELVES AS TO ALL EXISTING CONDITIONS AND LIMITATIONS, PRIOR TO SUBMITTING THE PROPOSAL. FAILURE TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS AND LIMITATIONS WILL IN NO WAY RELIEVE CONTRACTOR FROM FURNISHING ANY MATERIALS OR PERFORMING ANY WORK IN ACCORDANCE WITH DRAWINGS AND SPECIFICATIONS. NO ADDITIONAL COST SHALL BE PASSED ON TO THE OWNER FOR FAILURE TO COMPLY WITH THIS

REQUIREMENT.

ELECTRICAL NOTES:

1. ALL NEW CIRCUITRY SHALL BE ACCURATELY RECORDED BY THE CONTRACTOR TO BE INCORPORATED IN TO A RECORD SET

OF AS-BUILT DRAWINGS COMPLETED UPON COMPLETION OF WORK.

2. IN EVERY PULL BOX, TERMINAL BOX, AND AT ALL PLACES WHERE WIRES MAY NOT BE READILY IDENTIFIED BY NAMEPLATE

MARKINGS ON THE EQUIPMENT TO WHICH THEY CONNECT, IDENTIFY EACH WIRE WITH A LABEL OR TAG FOR CIRCUIT ID NUMBER, AS WELL AS POLARITY OR PHASE.

2. THE LAYOUT OF CONDUIT SHOWN IN THESE PLANS IS SCHEMATIC ONLY. CONTRACTOR SHALL ROUTE AND LOCATE THE CONDUITS TO SUIT SITE CONDITIONS, BUT SHALL NOT EXCEED THE MAXIMUM CONDUCTOR LENGTHS IDENTIFIED ON THE WIRE SCHEDULE. CONTRACTOR WILL COORDINATE ALL CHANGES IN WIRING AND CONDUIT WITH THE ENGINEER.

3. WHERE WIRE AND CABLE ROUTING IS NOT SHOWN, AND DESTINATION ONLY IS INDICATED, CONTRACTOR SHALL DETERMINE EXACT ROUTING AND LENGTHS REQUIRED. A SHOP DRAWING OF PROPOSED INSTALLATION SHALL BE SUPPLIED TO ENGINEER OF

RECORD PRIOR TO INSTALLATION.

4. BENDS SHALL NOT DAMAGE THE CONDUIT, OR SIGNIFICANTLY CHANGE THE INTERNAL DIAMETER OF CONDUITS (NO KINKS).

5. SUPPORT CONDUCTORS IN VERTICAL CONDUITS IN ACCORDANCE WITH REQUIREMENTS IN NEC 300.19

6. INSTALL ALL WIRING MATERIALS IN A NEAT WORKMANLIKE MANNER. USE GOOD TRADE PRACTICES AS REQUIRED BY CHAPTER

3 OF THE NEC. ALL EXPOSED CABLES, SUCH AS MODULE LEADS, TO BE SECURED WITH UV RATED MECHANICAL OR OTHER

APPROVED MEANS WITH A 25 YEAR LIFE.

7. INSTALL CONDUIT TO MAINTAIN PROPER CLEARANCES AND IN A NEAT, INCONSPICUOUS MANNER. RUN PARALLEL AND AT RIGHT ANGLES TO STRUCTURAL MEMBERS OR OTHER CONDUITS. PROVIDE BOXES, FITTINGS AND BENDS FOR CHANGES IN DIRECTION. FASTEN CONDUIT SECURELY IN PLACE. SUPPORT CONDUIT USING STEEL PIPE STRAPS, LAY-IN ADJUSTABLE HANGERS, CLEVIS HANGERS OR SPLIT-HANGERS. HANGER SPACING SHALL BE INSTALLED PER NEC REQUIREMENTS FOR THE TYPE OF CONDUIT BEING INSTALLED. USE APPROVED BEAM CLAMPS FOR CONNECTION TO STRUCTURAL MEMBERS.

8. PROVIDE PULL OR JUNCTION BOXES, WHERE REQUIRED TO FACILITATE THE INSTALLATION OF WIRING, IN ADDITION TO THOSE SHOWN ON THE DRAWINGS. TOTAL BENDS IN CONDUITS BETWEEN BOXES FOR WIRE ACCESS SHALL NOT EXCEED THE

EQUIVALENT OF FOUR 90° BENDS.

9. PER NEC300.7, CONDUIT RUNS EXPOSED TO DIFFERENT TEMPERATURES, WHERE CONDENSATION IS KNOWN TO BE PROBLEMATIC, SHALL BE FILLED WITH AN APPROVED MATERIAL TO PREVENT CIRCUILATION OF WARM AIR TO A COLD REGION.

10. WHEN FIELD CUTTING IS REQUIRED, THE CONDUIT SHALL BE CUT SQUARE AND DEBURRED.

11. CONDUIT SIZES NOT SPECIFIED SHOULD CONFORM TO NEC SPECIFICATIONS, TO INCLUDE FILL FACTOR AND DERATING FOR

NUMBER OF CONDUCTORS WITH A MINIMUM CONDUIT SIZE BEING 3/4".

12. SAFETY REGULATIONS (LOCK OUT - TAG OSHA OUT, ETC .. ) ARE THE FULL RESPONSIBILITY OF THE CONTRACTOR DURING

CONSTRUCTION (NFPA70E)

13. THE WIRING SIZE IS BASED ON THE ESTIMATED CONDUIT ROUTING AS SHOWN IN THIS DRAWING PACKAGE. SHOULD THE

CONDUIT'S LENGTH INCREASE DUE TO RELOCATION OF SOURCE AND/OR ROUTING, THE CONDUITS AND THE CONDUCTORS MAY NEED TO BE RESIZED. PLEASE CONTACT THE ENGINEER PRIOR TO MAKING ANY FIELD CHANGES.

14. ALL WIRING IN CONDUIT SHALL BE THWN-2 FOR 90C APPLICATIONS. USE BARE COPPER FOR GROUND FOR ALL EXTERNAL GROUNDING. PV WIRE OR APPROVED EQUIVALENT SHALL BE USED FOR ALL EXPOSED OR PV JUMPER HOMERUN WIRING.

15. ALL CONDUITS SHALL BE FREE OF ANY OBSTRUCTIONS AND PROPERLY SECURED BEFORE WIRE IS PULLED.

16. ELECTRICAL CONTRACTOR TO PROVIDE SIGNAGE TO ALL ELECTRICAL BOXES, JUNCTION BOXES, PULL BOXES, DC

DISCONNECTS, CONDUIT RUNS, AC DISCONNECTS, SUB PANELS AND MAIN SERVICES PER NEC ARTICLE 690.

17. MEGGER TESTING: MEGGER (INSULATION) TEST ALL CONDUCTORS AT 1,000V TO 5 MEGAOHMS BETWEEN THE CONDUCTOR

UNDER TEST AND GROUND WIRE. CONDUCT TEST AFTER WIRE IS PULLED THROUGH THE CONDUIT, BUT BEFORE CONNECTING TO THE MODULES, COMBINERS, DISCONNECTS OR INVERTER. DO NOT MEGGER TEST THE MODULES, AS THEY MAY BE DESIGN

LIMITED TO 600V AND MAY DAMAGE THE DEVICE.

18. ALL FASTENERS SHALL BE STAINLESS STEEL, UNLESS OTHERWIZE NOTED.

19. CIRCUIT NUMBERS ARE DIAGRAMMATIC. EXACT NUMBERS SHALL BE DETERMINED IN THE FIELD AND REFLECTED ON AS-

BUILT DOCUMENTATION BY THE ELECTRICAL CONTRACTOR. THE ASSOCIATED CIRCUIT NUMBERS THAT ARE APPLIED TO EACH DEVICE AND PIECE OF EQUIPMENT INFERS INTERCONNECTING BRANCH CIRCUITRY. INTERCONNECTING JUMPER WIRING

SHALL BE SIZED EQUAL TO THE HOMERUN UNLESS NOTED OTHERWISE.

20. VOLTAGE DROP HAS BEEN CONSIDERED IN THE DESIGN OF ALL CIRCUITRY AND FEEDER SIZES BASED UPON THE ILLUSTRATED EQUIPMENT LAYOUTS AND SHORTEST CONDUCTOR/RACEWAY ROUTING. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR DEVIATIONS TAKEN THAT WILL INCREASE CONDUCTOR/RACEWAY ROUTING LENGTHS. BRANCH CIRCUITS LONGER THAN 75' FOR 240V FROM PANEL TO LAST OUTLET SHALL BE INCREASED A MINIMUM OF ONE SIZE ABOVE THAT SPECIFIED TO LIMIT VOLTAGE DROP TO LESS THAN 3%. FEEDERS SHALL FOLLOW SIMILAR GUIDELINES AND BE LIMITED TO 2%

DROP.

21. ALL EXPOSED CIRCUITRY ON ROOFTOPS, ON EXTERIOR WALLS, OR IN THE FIELD SHALL BE INSTALLED IN RIGID METAL CONDUIT WITH FLEXIBLE CONNECTIONS TO ALL EQUIPMENT UTILIZING LIQUID TIGHT FLEXIBLE METAL CONDUIT NOT T0 EXCEED 18". ALL PENETRATIONS OF WEATHER TIGHT BOXES SHALL UTILIZE WEATHERPROOF HUBS. ALL CONDUIT SUPPORTS SHALL BE HOT DIPPED GALVANIZED. ALL FASTENERS, MISCELLANEOUS SUPPORTS (UNISTRUT OR EQUAL) AND HARDWARE UTILIZED FOR

THE ELECTRICAL INSTALLATION SHALL BE STAINLESS STEEL.

22. SWITCHBOARDS, PANELBOARDS, AND METER SOCKET ENCLOSURES, SHALL BE FIELD MARKED TO WARN QUALIFIED PERSONS OF POTENTIAL ELECTRIC ARC FLASH HAZARDS. THE MARKING SHALL BE LOCATED SO AS TO BE CLEARLY VISIBLE TO QUALIFIED PERSONS BEFORE EXAMINATION, ADJUSTMENT, SERVICING, OR MAINTENANCE OF THE EQUIPMENT.

23. ANY NEW CIRCUIT BREAKERS ADDED TO EXISTING PANELS, SHALL MATCH EXISTING FRAME AND AIC RATING.

24. WHERE WIRING, CONDUIT, AND OTHER ELECTRICAL ITEMS PASS THROUGH INACCESSIBLE AREAS, AN ACCESS METHOD

SHALL BE PROVIDED, WHETHER ON THE DRAWINGS OR NOT.

24. UTILITY AND EXISTING ELECTRICAL EQUIPMENT LOCATIONS ARE APPROXIMATE. ACTUAL LOCATIONS TO BE VERIFIED IN

FIELD.

25. CONDUIT SUPPORTS SHALL BE MADE FROM RECYCLED RUBBER OR EQUIVALENT TYPE WITH UNISTRUT OR EQUIVALENT TO

SECURE CONDUITS. POLYEHTYLENE OR WOOD SUPPORTS ARE NOT ACCEPTABLE.

26. CONDUIT SUPPORTS SHALL MAINTAIN MINIMUM 3.5" ABOVE ROOF SURFACE.

27. RMC TO BE RUN OUTDOORS, EMT TO BE RUN INDOORS, AND PVC TO BE USED UNDERGROUND AND INSIDE CONCRETE WITH

RMC SWEEPS ABOVE GROUND.

RACKING SYSTEM NOTES:

1. INSTALL RACKING SYSTEM ACCORDING TO MANUFACTURER'S REQUIREMENTS.

MODULE INSTALLATION NOTES:

1. REFER TO THE MODULE MANUAL FOR MORE DETAILS ON RIGGING, UNPACKING, HANDLING, PLANNING, INSTALLATION AND

TORQUE SPECIFICATION.

2. THE MODULES MAY BE SHIPPED WITH MULTIPLE MODULES PER BOX. TAKE CARE WHEN OPENING THE BOX TO ENSURE

THAT ALL MODULES ARE SECURELY HANDLED.

3. NEVER LEAVE A MODULE UNSUPPORTED OR UNSECURED. CONTRACTOR IS RESPONSIBLE FOR ALL MATERIAL HANDLING

ON THE JOB SITE.

4. DAMAGED MODULES SHALL BE REPLACED PROMPTLY AND CONTRACTOR SHALL MAINTAIN INVENTORY OF SPARE MODULES

ATICIPATING BREAKAGE DURING INSTALLATION AND ARRAY START UP.

SOLAR ARRAY START-UP:

IF THE INSTALLING CONTRACTOR HAS RECIEVED WRITTEN PERMISSION TO START UP THE SYSTEM, THE FOLLOWING PROCEDURE AT MINIMUM SHALL BE COMPLETED BEFORE CLOSING DISCONNECTS OR ATTEMPTING TO ENERGIZE THE INVERTERS:

1. CHECK THE OPEN CIRCUIT VOLTAGE (Voc) AND POLARITY (+/-) OF EACH SOURCE CIRCUIT. RECORD THE VALUES ON THE

COMMISSIONING RECORD DOCUMENTS.

2. CHECK THE SHORT CIRCUIT CURRENT (Isc) FOR EACH SOURCE CIRCUIT. RECORD THE VALUES ON COMMISSIONING

RECORD DOCUMENTS.

3. CHECK THAT ALL FUSES, DISCONNECTS AND OTHER BALANCE OF SYSTEM COMPONENTS ARE RATED FOR 600 VDC AND

THE APPROPRIATE CURRENT CAPACITY.

4. COMPLETE A VISUAL INSPECTION OF ALL THE MODULES TO CHECK FOR BROKEN GLASS, LOOSE FASTENERS, FRAYED

WIRES, EXPOSED CONDUCTORS AND ANY OTHER PROBLEMS THAT MAY CAUSE A FAULT.

INVERTER START-UP:

IF THE INSTALLING CONTRACTOR HAS RECIEVED WRITTEN PERMISSION TO START UP THE SYSTEM, THE FOLLOWING PROCEDURE AT MINIMUM SHALL BE COMPLETED BEFORE CLOSING DISCONNECTS OR ATTEMPTING TO ENERGIZE THE INVERTERS:

1. CHECK THAT THE INVERTER IS PROPERLY GROUNDED, AS DESCRIBED BY THE MANUFACTURER AND THESE INSTRUCTIONS.

2. CHECK THE INVERTER DC INPUT VOLTAGE (Voc) FROM THE SOLAR ARRAY FOR PROPER POLARITY INSIDE THE INVERTER

CABINET.

3. CHECK DC INPUT VOLTAGE (Voc) IS WITHIN THE PROPER RANGE IN THE INVERTER CABINET AS DEFINED BY THE INVERTER

RATING LABEL AND MANUFACTURE’S INSTALLATION AND OPERATION MANUAL.

4. CHECK AC INPUT VOLTAGES IS IN THE PROPER PHASE SEQUENCE (CLOCKWISE) IF APPLICABLE

5. CHECK THAT THE AC GRID VOLTAGE, AT THE INVERTER AC TERMINALS, IS WITHIN THE PROPER RANGE AS DEFINED BY THE

INVERTER RATING LABEL AND MANUFACTURE’S MANUAL

6. FOLLOW START-UP SEQUENCE IN MANUFACTURER'S OPERATION AND MAINTENANCE MANUAL.

SYSTEM COMMISSIONING:

1. PERFORM PHOTOVOLTAIC SYSTEM COMMISSIONING IN ACCORDANCE WITH SPECIFICATION SAQMMA-11C-0236, SECTION

13650.

ELECTRICAL NOTES FOR PHOTOVOLTAlC SYSTEM

1. THIS PROPOSED SOLAR ELECTRIC SYSTEM IS INTENDED TO OPERATE IN PARALLEL WITH POWER RECEIVED FROM THE

UTILITY SERVICE PROVIDER.

2. THE PHOTOVOLTAIC SOURCE CIRCUITS AND PHOTOVOLTAlC OUTPUT CIRCUITS OF THIS PROPOSED SOLAR SYSTEM SHALL NOT BE CONTAINED IN THE SAME RACEWAY CABLE TRAY, CABLE, OUTLET BOX, JUNCTION BOX, OR SIMILAR FITTING AS FEEDERS OR BRANCH CIRCUITS OF OTHER SYSTEMS, UNLESS THE CONDUCTORS OF THE DIFFERENT SYSTEMS ARE

SEPAR…

This is the start of the file's text. The full file is on GovTribe.