ABV_AS_BUILT_GRAWINGS_002.pdf
PDF 14 MB Posted
- Attached to
- UPGRADE OF PHOTOVOLTAIC SYSTEM
- Solicitation number
- PR8552819
- Issued by
-
Department of State US Embassy Abuja
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ABV_AS_BUILT_DRAWINGS_001.pdf | ||
| QUESTION_AND_ANSWER_-_PR_8552819_-_ABUJA_PHOTOVOLTAIC_SYSTEM_UPGRADE_001.docx | DOCX document | |
| REVISED_SOW_PHOTOVOLTAIC.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL REVIEW
AUSTIN
DALLAS
HOUSTON
WASHINGTON DC
PAG E SOUT HERL AND P AG E, L L P
3101 Wilson Blvd
Suite 300
Arlington, Virginia tel: 703 527 4100 fax: 703 522 8043 www.psp.com
ARCHITECTURE INTERIORS CONSULTING ENGINEERING
Project: NOX - ABV
SAQMMA-11-C-0236
PSP Project No.: 711082
Submittal No: 13650-001-02 Date: 28-Mar-2013
Description: Solar Photovoltaic Systems
From: Floyd Stoutt
To: Mark Wals
B.L. Harbert International, LLC
1031 London Drive, Birmingham, Alabama 35211
Copies: AST Cowen, Cervantes & Assoc, Ehlert/Bryan, Hankins & Anderson, Hinman Consulting Engineers, Schnabel Engineering, Woods Peacock Engineering Consultants, Architect’s Review:
Approved Revise and Resubmit Not Reviewed, See Comments
Approved as Noted Rejected Incomplete, Submit Additional Information
This review is only for general conformance with the design concept and the information given in the Contract Documents. Corrections or comments made on the submittal during this review do not relieve the contractor from compliance with the requirements of the plans and specifications. Approval of a specific item shall not indicate approval of an assembly of which the item is a component. The
Contractor is responsible for: dimensions to be confirmed and correlated at the job site; information that pertains solely to the fabrication processes or to the means, methods, techniques, sequences and procedures of construction; coordination of the Work with that of all other trades and performing the work in a safe and satisfactory manner.
Comments:
Please see above for the scope of work
This is accepted as submitted, no further comments
Attachments:
1. BLHI Submittal with H&A response
Reviewed By: (703) 527-4100
(signature)
March 19, 2013 box 242, harvard, massachusetts 01451-0242
(978) 456-6855 ● www.solardesign.com
Dan McAliley BL Harbert International 210 London Parkway Birmingham, AL 35211 RE: Abuja PV System Submittal Response
Dan, Following are the SDA’s responses to the concerns raised by Travis Oliver on the recent submittal package for the proposed PV system at the new parking garage structure at the Abuja NOB.
1. PV Module Mounting.
2.
Response: The PV modules are secured in a manner that is accessible from below. It has been addressed on sheet PV402, drawings 4 & 5.
Spare modules.
Sheet PV101:
Response: SDA will provide the 4 additional modules (as a no-cost add to Harbert) to close the sub-array rectangles. These additional modules will not be connected to the system. This is in addition to the spare modules that are to be set aside as attic stock, at the facility.
3. Sheet PV101 – PV Layout.
4.
Response: the PV array has been centered as requested. The DAS weather station has been indicated on detail 1.
Sheet PV101 – Plan #4 Parking Building
Sheet PV203:
. Response: The 3D view has been updated from the approved for construction drawing package.
5. Sheet PV203 – Transition Box Detail.
Sheet PV401:
Response: A note indicates to use a 12-wire cord grip and 10 fuse holders, for transition boxes 14, 15, & 16.
6. Sheet PV401 – Mounting Rails.
Sheet PV601:
Response: The spans between rail supports as designed, are typically ~7’-6” [2275 mm], and will be a maximum of ~8’-8” [2625 mm], as per the spacing of the concrete beams. Rails as supplied from the manufacturer will typically be 16 ft rails. A 16 ft rail plus another 16 ft rail cut in two segments, makes a total length to support a set of 7 modules. The splice has been indicated, and is placed according to manufacturer’s specifications.
7. Sheet PV601 – Equipment Schedule.
8.
Response: “By Harbert” has been added to items D, E, & F
Sheet PV601 – PV Module Output.
9.
Response: The electrical data of the PV module and source circuits have been updated to match the revision for the PV module Suniva MVX255. The equipment labeling is also updated accordingly.
Sheet PV601 – Line Diagram. Response: The transition boxes do not all match up one-to-one with all of the inverters. Due to the mechanical limitations of the array, some transition boxes carry source circuits of multiple inverters. All transition box outputs are routed to a wireway in each electrical room, mounted beneath the inverters. In this wireway, the source circuits shall be routed to their corresponding inverters.
March 19, 2013 box 242, harvard, massachusetts 01451-0242
(978) 456-6855 ● www.solardesign.com
10. Sheet PV601 – Inverter L.
11.
Response: Inverter L is fed by source circuits L1, L2, L3, & L4.
Transition box TB12 carries source circuits L1 & L2. Transition box 16 carries source circuits L3 & L4.
Sheet PV601 – Inverter M.
12.
Response: Inverter M is fed by source circuits M1, M2, M3, M4 & M5.
Transition box TB13 carries source circuits M1 & M2a. Transition box 16 carries source circuits M2b, M3, M4, & M5. Source circuit M2 is sourced from multiple sections of the canopy, each labeled M2a and M2b. These partial source circuits are to be connected in series, to form one source circuit. The series connection happens in the wireway in room P401, with wire connectors installed on the jumpers as needed. Four source circuits are fed to the inverter’s primary input (MPPT-A), and the remaining source circuit is fed to the inverter’s secondary input (MPPT-B). Inverter M shall have two internal surge arrestors, one for each input bus.
Sheet PV601 – Inverter N.
13.
Response: Inverter N is fed by source circuits N1, N2, N3, & N4.
Transition box TB14 carries source circuit N1. Transition box 15 carries source circuits N2, N3, & N4.
Sheet PV601 – Inverter P.
14.
Response: Inverter P is fed by source circuits P1, P2, P3, & P4.
Transition box TB15 carries source circuits P1 & P2. Transition box 16 carries source circuits P3, & P4.
Sheet PV601 – Inverter V.
15.
Response: Inverter V is fed by source circuits V1, V2, V3, & V4. Source circuit V1 is sourced from multiple sections of the canopy, each labeled V1a and V1b. These partial source circuits are to be connected in series, to form one source circuit. The series connection happens in the wireway in room P401, with wire connectors installed on the jumpers as needed.
Transition box TB12 carries source circuit V1a. Transition box 20 carries source circuits V2, V3, & V4.
Sheet PV601 – DAS Circuit Breaker.
16.
Response: The 15A 3-P breaker for DAS power & voltage tap in panel P1U2 is provided by Harbert, and this note has been added to the drawing.
HD Signal Extender –For Reference Only.
17.
Response: The DAS drawings have been updated to include the note about matching the facility voltage.
Automation Direct Boxes.
We look forward to our continued correspondence regarding this installation.
Response: Only two models of these enclosures are intended to be used in this project. Enclosure model HW-J121005SC is to be used for the fused transition boxes.
Enclosure model HW-J100804SC is to be used for the DAS Weather Station. The two box models have been marked accordingly. All box models that aren’t used for this project, have been eliminated from the documents.
Sincerely, E. Robert Erb.
Senior Project Manager | Solar Design Associates, LLC.
280 Ayer Rd. Harvard, MA 01451
(p) 978.456.6855 x 17 | (m) 617.947.8695 rerb@solardesign.com | www.solardesign.com mailto:rerb@solardesign.com� http://www.solardesign.com/�
UNCLASSIFIED
P
O
N
M
L
A
B
C
D
E
F
G
H
I
J
K
CADD Plot Scale
CADD File Name
Classification
PSP Project Number
OBO Project Number Drawing Scale
Drawing Title
United States Department of State
Washington, D.C.
WARNING:
Release For Construction:
Date
Drawn By
Checked By
This document is the property of the U.S. Government.
Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of:
U.S. Department of State ATTN: Jim Thomas Washington, D.C. 20520.
OFFICE OF OVERSEAS BUILDINGS
OPERATIONS
1:1
NEW
OFFICE ANNEX
FOR
Sheet Number
ABUJA, NIGERIA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
P
O
N
M
L
A
B
C
D
E
F
G
H
I
J
K
AS NOTED
Revisions Rev Number Revision Description Revision Date
CM, CH
RE
3/19/2013
B.L. Harbert International, L.L.C.
1030 London Dr. Suite 400 Birmingham, AL 35211 Tel (205) 802-2900
Page Southerland Page, L.L.P.
3101 Wilson Boulevard, Suite 300 Arlington, VA 22201-4419 Tel (703) 527-4100
Cervantes and Associates, P.C.
4229 Lafayette Center Drive. Suite 1125 Chantilly, VA. 20151 Tel: (703) 691-4114
Elhert /Bryan , Inc.
1451 Dolley Madison Blvd, Suite 220 Mclean, VA 22101 Tel: (703) 827-9552
Schnabel Engineering North , L.L.C.
46020 Manekin Plaza, Suite 110 Sterling, VA 20106 Tel: (703) 779-0773
Hankins and Anderson, Inc.
4880 Sadler Road Suite 300
Glen Allen, VA 23063 Tel. (804) 285-4171
Woods Peacock Engineering Consultants, Inc.
Halifax Office Park, Suite 420 5250 Cherokee Avenue
Alexandria, VA 22312-2052 Tel: (703) 658-4400
Hinman Consulting Engineers, Inc.
One Bush Street, Suite 510
San Francisco, CA 94104 Tel: (415) 621-4423
AST Cowen Design Group LLC 1451 Dolley Madison Blvd, Suite 200
McLean, VA 22207 Tel: (703) 528-4424
D
EL
IV
ER
Y
P-2
P-1
PV001
COVER SHEET
CONSTRUCTION DRAWING SET
PL
MATCH LINE
REFR. XX.XXX
"EQUAL" DIM AT CEILING
100MM
100MM
F
A C
E
DB
TYPICAL DIM ON CEILING PLAN
DOOR NUMBER
KEYNOTE NUMBER
AREA OF
ENLARGED
PLAN OR
DETAIL
ENLARGED PLAN
OR DETAIL
NUMBER
SHEET WHERE PLAN OR
DETAIL IS SHOWN
SHEET WHERE PLAN OR
DETAIL IS TAKEN
REVISION NUMBER
WINDOW NUMBER
EQUIPMENT /
FURNITURE NUMBER
PARTITION NUMBER
DRAWING WHERE
ELEVATION IS FOUND
ELEVATION NUMBER
SPOT ELEVATION
DIMENSION WHEN OCCURS
ALIGN
+100 M
WTB-2
CH-1
CO-1
A
XXX
X
XXXX
PERPENDICULAR
% PERCENT
x° DEGREE(S) OF ANGULAR MEASURE
< LESS THAN
> GREATER THAN
≤ GREATER THAN OR EQUAL TO
# POUND(S)
@ AT
= EQUAL
CENTER LINE
PROPERTY LINE
mm MILLIMETERS
M METERS
& AND
ANGLE
DIAMETER
/ DIVIDE BY, PER
x MULTIPLY BY, BY
+/- OR ± PLUS OR MINUS
NEW OR REVISED GRAPHICAL INFORMATION
GRAPHICAL INFORMATION PREVIOUSLY ISSUED
SHOULD BE ON DRAWINGS CURRENTLY (NOTE: NO CLOUDS INDICATED)
G - GENERAL PROJECT INFORMATION
TS - TOPOGRAPHIC SURVEY
SB - SOIL BORING DATA
SD - SITE DEMOLITION
C - CIVIL
L - LANDSCAPE
A - ARCHITECTURE
I - INTERIORS
S - FOUNDATION AND STRUCTURAL
M - MECHANICAL
P - PLUMBING
E - ELECTRICAL
LS - LIFE SAFETY
FP - FIRE PROTECTION AND HAZARD CONTROL
FS - FOOD SERVICE
SG - SIGNAGE AND GRAPHICS
AA - ASBESTOS ABATEMENT (HAZARD CONTROL)
VT - VERTICAL TRANSPORTATION
SET ORGANIZATION
G0000 SERIES - SYMBOLS, NOTES AND ABBREVIATIONS
A0000 SERIES - COMPOUND INFORMATION
A0100 SERIES - FULL FLOOR PLANS
A0200 SERIES - EXTERIOR ELEVATIONS
A0300 SERIES - BUILDING AND WALL SECTIONS
A0400 SERIES - ENLARGED FLOOR PLANS
A0500 SERIES - DIAGRAMS
A0600 SERIES - SCHEDULES
A0700 SERIES - STAIR INFORMATION
A0800 SERIES - EXTERIOR DETAILS
A0900 SERIES - INTERIOR DETAILS
THE FOLLOWING GENERAL NOTES APPLY TO
ALL ARCHITECTURAL DRAWINGS. FOR NOTES
APPLICABLE OTHER DISCIPLINES, REFER TO
THE INDEX OF DRAWINGS.
ALL PARTS OF THE WORK - INCLUDING
MATERIALS, METHODS, ASSEMBLIES, ETC.-
MUST COMPLY WITH THE MIN REQUIREMENTS
OF THE GOVERNING REGULATIONS OF ALL
FEDERAL, STATE, DISTRICT AND LOCAL
AUTHORITIES HAVING JURISDICTION OVER THE
PROJECT AS WELL AS THOSE GREATER
REQUIREMENTS INDICATED BY THE
CONTRACT DOCUMENTS. NO PART OF THE
CONTRACT DOCUMENTS MAY BE CONSTRUED
TO REQUIRE OR PERMIT WORK CONTRARY TO
A GOVERNING REGULATION.
THE CONTRACTOR SHALL FULLY ACQUAINT
HIMSELF WITH THE CONDITIONS OF THE
CONTRACT, LOCAL CONDITIONS RELATING TO
LOCATION, ACCESSIBILITY AND GENERAL
CHARACTER OF THE CONSTRUCTION SITE
AND LOCAL LABOR CONDITIONS SO THAT HE
UNDERSTANDS THE NATURE, THE EXTENT,
DIFFICULTIES AND RESTRICTIONS RELATED TO
THE EXECUTION OF THE WORK.
THE CONTRACTOR SHALL VERIFY
DIMENSIONS, GRADES, LEVELS, BOUNDARIES
AND CONSTRUCTION INDICATED ON
CONTRACT DRAWINGS BEFORE PROCEEDING
WITH THE WORK, AND SHALL REPORT
IMMEDIATEDLY ANY DISCREPANCIES.
THE ARCHITECTURAL DRAWINGS ARE A PART
OF A LARGER SET OF DRAWINGS WHICH, WHEN
COMPLETE, CONSISTS ON ALL THE DRAWINGS
LISTED BY THE INDEX OF DRAWINGS. THE
WORK DESCRIBED BY THE DRAWINGS OF ANY
ONE DISCIPLINE MAY BE AFFECTED BY THE
WORK DRESCRIBED ON DRAWINGS OF
ANOTHER DISCIPLINE AND MAY REQUIRE
REFERENCE TO THE DRAWING OF ANOTHER
DISCIPLINE. PARTIAL SETS OF DRAWINGS ARE
INCOMPLETE AND SHOULD NOT BE
DISTRIBUTED OR UTILIZED BY THE
CONTRACTOR. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO REVIEW AND COORDINATE
THE WORK OF ALL SUB-CONTRACTORS,
TRADES, SUPPLIERS WITH THE
REQUIEREMENTS OF THE CONTRACT
DOCUMENT BEFORE COMMENCING
CONSTRUCTION, AND TO ASSURE THAT ALL
PARTIES ARE AWARE OF ALL THE
REQUIREMENTS, REGARLESS OF WHERE THE
REQUIREMENTS OCCUR IN THE CONTRACT
DOCUMENTS, WHICH MIGHT AFFECT THE
WORK OF THAT PARTY.
AS PART OF THE CONTRACTOR'S
RESPONSIBILITY TO COORDINATE THE WORK
OF ALL SUB-CONTRACTORS, TRADES AND
SUPPLIERS, THE CONTRACTOR SHALL
ENDEAVOR TO INDENTIFY AND NOTIFY THE
ARCHITECT OF ANY CONFLICTS BETWEEN THE
WORK OF DIFFERENT PARTIES AT THE
EARLIEST POSSIBLE DATE SO AS TO ALLOW
REASONABLE AND ADEQUATE TIME FOR THE
CONFLICT TO BE RESOLVED WITHOUT
DELAYING THE WORK. ALL DEVIATIONS FROM
THAT WHICH IS REQUIRED BY THE CONTRACT
DOCUMENTS MUST BE APPROVED IN ADVANCE
BY THE ARCHITECT.
THE ARCHITECTURAL DRAWINGS ESTABLISHED AND
COORDINATE THE FINISHED APPEARANCE AND EXACT
LOCATION OF ALL TRADES, INCLUDING THAT WORK
WHICH IS ILLUSTRATED PRIMARLY ON DRAWINGS OF
OTHER DISCIPLINES. LOCATIONS SHOWN ON OTHER
DRAWINGS ARE SCHEMATIC, UNLESS OTHERWISE
NOTED ON THE ARCHITECTURAL DRAWINGS. THE
ARCHITECTURAL DRAWINGS TAKE PRECEDENCE FOR
THE FINISHED APPEARANCE AND EXACT LOCATION
OF ALL PARTS OF THE WORK.
EXCEPTION: DIMENSIONED LOCATIONS SHOWN ON
DRAWINGS OF OTHER DISCIPLINES SHALL GOVERN
ONLY WHERE:
1. SPECIFICALLY AND INDIVIDUALLY
INDICATED BY SYMBOL KEYED NOTE, OR NOTATION
ON THE ARCHITECTURAL DRAWINGS.
2. OCCURING WITHIN A ROOM OR OTHER
IDENTIFIED SPACE FOR WHICH ARCH SHEET OR
SCHEDULE NOTES INDICATED THAT DIMENSIONS
PROVIDED ELSEWHERE SHALL GOVERN.
THE ARCHITECTURAL FLOOR PLANS, REFLECTED
CEILING PLANS, SECTIONS, AND ELEVATIONS
ILLUSTRATE THE EXACT LOCATION OF MANY, BUT
NOT ALL EXPOSED PARTS OF THE WORK. APPLY THE
RULES INDICATED BY THE "TYPICAL FIXTURE AND
EQUIPMENT MOUNTING HEIGHTS AND LOCATION" TO
DETERMINE THE EXACT LOCATION OF EACH
EXPOSED PART OF THE WORK.
REFER TO THE STRUCTURAL MECHANICAL,
ELECTRICAL, AND PLUMBING DRAWINGS FOR THE
DETAILED DESIGN OF STRUCTURAL, MECHANICAL,
ELECTRICAL, AND PLUMBING SYSTEMS WHICH
PORTIONS MAY BE SHOWN ON THE ARCHITECTURAL
DRAWINGS.
FINISH FLOOR ELEVATIONS ARE TO TOP OF
CONCRETE FLOOR SLAB, UON.
CEILING HEIGHT DIMENSIONS ARE TO FINISHED
SURFACES, UNLESS OTHERWISE NOTED.
FOR TYPICAL DIMENSIONING CONVENTIONS,
INCLUIDING RULES FOR LOCATING DOORS WHICH
HAVE NOT BEEN DIMENSIONED, REFER TO THE
"DIMENSIONING CONVENTIONS" NOTES ON THIS
SHEET.
FOR ILLUSTRATION AND DEFINITION OF TYP
SYMBOLS USED ON THE ARCHITECTURAL DRAWINGS,
SEE THE DRAWING "ARCHITECTURAL SYMBOLS" ON
THIS SHEET.
ADDITIONAL SYMBOLS, NOT SHOWN OR DEFINED ON
THE DRAWING "ARCHITECTURAL SYMBOLS"MAY
OCCUR AND ARE DEFINED ON OTHER
ARCHITECTURAL DRAWINGS.
BASIC FIRE PROTECTION AND EXITING CONCEPTS
ARE ILLUSTRATED BY "LIFE SAFETY PLAN"
DRAWINGS. REFER TO THE INDEX OF DRAWINGS FOR
THE LOCATION OF ADDITIONAL FLOOR PLANS,
CEILING PLANS BUILIDING SECTION, WALL SECTION,
ELEVATIONS, SCHEDULES AND DETAILS.
EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE
WORK AT THE "APPROXIMATE LOCATION SHOWN,"
DO NOT SCALE DRAWINGS FOR DIMENSIONAL
INFORMATION ALL ELEMENTS OF THE DRAWINGS
MAY NOT BE DRAWN TO SCALE. ALL DIMENSIONS
REQUIRED ARE SHOWN, OR MAY BE DERIVED FROM
THOSE SHOWN ON THE FLOOR PLANS, DETAIL
PLANS,ELEVATIONS, SECTIONS, DETAILS,
SCHEDULES, AND SPECIFICATIONS. SEE NOTES AND
ARCHITECTURAL SYMBOLS ON THIS SHEET FOR
DIMENSION CONVENTIONS USED ON THIS
PROJECT.
EXCEPT WHERE SPECIFICALLY NOTED TO THE
CONTRARY, ALL DIMENSIONS SHOWN ON THE
ARCHITECTURAL DRAWINGS CONFORM TO THE
FOLLOWING CONVENTIONS:
CENTERLINE OF EQUIPMENT OR
FURNISHING.
CENTERLINE OF OTHER FEATURES AS
INDICATED.
"FACE OF" AND "CLEAR " DIMENSIONS-
WHERE "FACE OR FINISH" OR "CLEAR"
DIMENSIONS ARE SPECIFICALLY NOTED,
DIMENSIONS IS MEASURED TO:
THE MINIMUM CLEAR DIMENSION TO THE
FINISH FACES ACROSS ANY OPEN SPACE.
FINISH FACES AT THE WIDEST OR MOST
EXPANSIVE POINTS OF THE SECTION WHEN
THE DIMENSION OCCURS AROSS AN OBJECT
OR GROUP OF OBJECTS.
EQUAL DIMENSIONS - WHERE "EQUAL"
DIMENSIONS ARE USED ON REFLECTED
CEILING PLANS TO LOCATE CEILING GRID
WORK POINTS, MEASURE DIMENSIONS
TO:
EDGE OF THE INDICATED CEILING AT THE
FACE OF THE ADJACENT APPLIED FINISH
MEASURED AT THE PLANE OF THE CEILING.
NOTE: DUE TO POSSIBLE APPLICATION OF
APPLIED FINISHED WHOSE THICKNESS MAY
VARY BETWEEN FLOOR AND CEILING AND
WHOSE THISCKNESS IS NOT ACCOUNTED
FOR ( EXCEPT AS INDICATED BY "FOF" OR
"CLEAR" BY DIM SHOWN ON THE FLOOR
PLANS, THE CONTRACTOR MUST ADJUST,
AS NECESSARY, THE DIMENSIONS TO
REFLECT CONDITIONS AT PLANE OF
CEILING.
WHERE A DOOR IS NOT SHOWN
ADJACENT TO A PERPENDICULAR WALL
AND DIMENSION F IS 16'-0" OR LESS,
LOCATE THE DOOR NO LESS THAN THE
FOLLOWING MINIMUM DIMENSIONS:
DIMENSION A = 460MM MIN.
DIMENSION B = 305MM MIN.
DIMENSION C = DOOR WIDTH + 50MM
MIN.
DIMENSION D = 100MM MIN.
DIMENSION E & F = AS SHOWN ON
PLANS.
IF SPACE ALLOWS CENTER THE DOOR
SO THAT EITHER DIMENSION A IS EQUAL
TO DIMENSION C OR DIMENSION B IS
EQUAL TO DIMENSION D.
WHERE WALLS AND/OR PARTITIONS OF
UNEQUAL THICKNESS ABUT, ALIGN
EXPOSED FACES, UON.
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
ACT ACOUSTIC(AL) CEILING TILE
ADD ADDENDUM
ADH ADHESIVE
ADJ ADJACENT
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
ASB ASBESTOS
ASPH ASPHALT
BM BEAM
BET BETWEEN
BLK BLOCK(ING)
BD BOARD
BLDG BUILDING
BHD BULKHEAD
BOM BOTTOM OF MULLION
BOJ BOTTOM OF JOINT
BOR BOTTOM OF REVEAL
CAB CABINET
CPT CARPET
CLG CEILING
CT CERAMIC TILE
CTR CENTER
CLR CLEAR(ANCE)
CL CLOSET
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONF CONFERENCE
CONST CONSTRUCTION
CJ CONSTRUCTION JOINT
CONT CONTINUOUS
CONTR CONTRACTOR
CG CORNER GUARD
~COJ CENTER LINE OF JOINT
~COM CENTER LINE OF MULLION
~COR CENTER LINE OF REVEAL
DEMO DEMOLITION
DTL, DET DETAIL
DIAG DIAGONAL
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DIV DIVISION
DR DOOR
DBL DOUBLE
DN DOWN
DWR DRAWER
DWG DRAWING
DF DRNKING FOUNTAIN
EA EACH
EIFS EXT. INSULT. FIN. SYSTEM
ELEC ELECTRIC(AL)
EWC ELECTRIC WATER COLLER
EL ELEVATION
ELEV ELEVATOR
ENCL ENCLOSE(URE)
EOS EDGE OF SLAB
EQ EQUAL
EX EXISTING
EJ EXPANSION JOINT
EXP EXPOSED, EXPANSION
EXT EXTERIOR
FF FINISHED FLOOR
FIN FINISH(ED)
FA FIRE ALARM
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FVC FIRE VALVE CABINET
FR FIRE RATED(ING)
FRP FIBERGLASS REINF.
POLYESTER
FRT FIRE RETARDANT
TREATED
FL, FLR FLOOR(ING)
FD FLOOR DRAIN
FOF FACE OF FINISH
FUR FURR(ING)
GALV GALVANIZED
GA GAUGE
GWB GYPSUM WALL BOARD
GL GLASS
H HAND
HP HIGH POINT
HC HOLLOW CORE
HM HOLLOW METAL
HORZ HORIZONTAL
H&V HORIZONTAL AND
VERTICAL
HR HOUR
HCP HANDICAPPED
INCL INCLUDE(D)(ING)
ID INSIDE DIAMETER
INSUL INSULATE(D)(ION)
INT INTERIOR
JC JANITORS CLOSET
JT, J JOINT
KD KNOCK DOWN
KIT KITCHEN
LAM LAMINATE
LAV LAVATORY
LBL LABEL
LEV LEVEL
LH LEFT HAND
LT LIGHT
LWC LIQUID WALL COVERING
LG LONG, LENGTH
LP LOW POINT
MFR MANUFACTURER
MO MASONRY OPENING
MTL METAL
MAX MAXIMUM
MECH MECHANICAL
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MOV MOVABLE
MUL MULLION
MACH MACHINE
NOM NOMINAL
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO NUMBER
N/A NOT APPLICABLE
NFGH NON-FREEZE GROUND
HYDRANT
OFF OFFICE
OC ON CENTER
OPNG OPENING
OPP OPPOSITE
OD OUTSIDE DIAMETER
OA OVERALL
OH OVERHEAD
PTD, P PAINTED
PR PAIR
PNL PANEL
PBD PARTICLE BOARD
PTN PARTITION
PERF PERFORATED
PLAS PLASTER
PLAM, PL PLASTER
LAMINATE
PWD PLYWOOD
PT POINT
PC PRECAST CONCRETE
PROJ PROJECTED(ION)
QT QUARRY TILE
RAD, R RADIUS
REF REFERENCE
REINF REINFORCE(D)(ING)
REQ REQUIRED
RES RESILIENT
REV REVISION
RH RIGHT HAND
R RISER
R REVEAL
RD ROOF DRAIN
RM ROOM
RO ROUGH OPENNING
RB RUBBER BASE
SAB SOUND ATTENUATION
BLANKET
SCHD SCHEDULE
SEC SECTION
SF SQUARE FOOT
SH SHELF, SHELVING
SHT SHEET
SIM SIMILAR
SC SOLID CORE
SPEC SPECIFICATION,
SPECIFIED
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STOR STORAGE
STR STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
TBL TABLE
TEL TELEPHONE
THK THICK(NESS)
THRES THRESHOLD
TLT TOILET
TMPD TEMPERED
TOB TOP OF BEAM
TOS TOP OF STEEL
T TREAD
TYP TYPICAL
TOM TOP OF MULLION
TOJ TOP OF JOINT
TOR TOP OF REVEAL
UC UNDERCUT
UNF UNFINISHED
UON UNLESS OTHERWISE
NOTED
VIF VERIFY IN FIELD
VB VINYL BASE
VERT VERTICAL
VCT VINYL COMPOSITION
TILE
VWC VINYL WALL COVERING
WC WALL COVERING
WP WATERPROOFING
W/ WITH
W/O WITHOUT
WD WOOD
WR WATER RESISTANCE
ELEVATION
SECTION
COLUMN
CENTERLINE
INDICATION
ROOM NUMBER
INDICATION
SECTION NUMBER
SHEET CUT INDICATION
SHEET WHERE SECTION IS
SHOWN
SHEET WHERE
SECTION IS TAKEN
GRID
ROOM DESIGNATOR
NORTH ARROW
ENLARGED PLAN OR DETAIL
DOOR TAGREVISION NUMBER
SPOT ELEVATION
WINDOW TAG
EQUIPMENT / FURNITURE TAG
KEYNOTES
PARTITION TAG
MATCH LINE
MEASURED TO FACE OF PARTITION
MEASURE TO FACE OF PARTITION
FINISHED WOOD
WOOD BLOCKING
INTERMITENT, NON
DIMENSIONED
WOOD FRAMING OR CONTINIOUS
CONCRETE BLOCK UNIT
CONCRETE
PRECAST
EARTH
ALUMINUM
STEEL
GRAVEL
SAND OR PLASTER
BATT INSULATION
RIGID INSULATION
SEMI RIGID INSULATION
AIR/VAPOUR BARRIER
SOUND INSULATION
A0.111
DISCIPLINE DESIGNATOR
VOLUME DESIGNATOR
SHEET DESIGNATOR
ABBREVIATIONABBREVIATIONS REFERENCE SYMBOLS ARCHITECTURAL GENERAL NOTES ARCHITECTURAL DIMENSIONING CONVENTIONS
SYMBOLS AS ABBREVIATIONS MATERIAL SYMBOLS SHEET NUMBERING SYSTEM VICINITY PLAN
DELTA GRAPHIC LEGEND/ DESCRIPTION
4#
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
TYPICAL DIMENSIONS: DIMENSIONS,
UNLESS OTHERWISE NOTED, ARE TO THE
FINISHED FACE OF AN ASSEMBLY OR
OBJECT AND ARE MEASURED TO:
FACE OF CONCRETE OR C.M.U. WALL
(EXCLUSIVE OF APPLIED FINISHES HAVING
THICKNESS OR FURRING WHICH MAY BE
ADDED TO THE FACE OF SUCH WALLS.
FACE OF PARTITION ASSEMB (EXCLUSIVE OF
APPLIED FINISHES HAVING THICKNESS WHICH
MAY BE ADDED TO SUCH WALLS) AS DEFINED
BY THE PARTITION SCHEDULE. UNLESS
NOTED AS A "FACE OF FINISH" OR "CLEAR"
DIMENSION (SEE NOTES BELOW),
DIMENSIONS ARE NOT MEASURED TO THE
FACE OF APPLIED FINISH. REFER TO THE
"PARTITION SCHEDULE" TO DETERMINE THE
THICKNESS OF EACH PARTITION ASSEMBLY
TYPE.
INSIDE EDGE OF FINISHED DOOR OPENING.
REFER TO "DOOR SCHEDULE" FOR
ADDITIONAL INFORMATION.
DIMENSION OR WORK POINT AS INDICATED
ON RELATED ARCHITECTURAL DETAIL PLAN,
SECTION, ELEVATION, CONFIGURATION
DETAIL, OR CONSTRUCTION DETAIL.
CENTERLINE DIMENSIONS: REFER TO
"SYMBOLS AS ABBREVEATIONS" THIS SHEET
FOR ILLUSTRATION OF THE SYMBOL USED
TO INDICATE A CENTERLINE DIMENSION.
DIMENSIONS UTILIZING THE "CENTERLINE"
SYMBOL ARE MEASURED TO:
STRUCTURAL OR DIMENSIONAL GRID LINES
CENTERLINE OF CONCRETE OR C.M.U.
WALL (EXCLUSIVE OF APPLIED FINISHED
HAVING THICKNESS OR FURRING). REFER
TO THE ARCHITECTURAL PLANS AND
SECTIONS. THE ARCHITECTURAL DRAWINGS,
OR THE PARTITION SCHEDULE TO
DETERMINETHE THICKNESS OF CONCRETE
OR CONCRETE MASONRY UNIT WALLS.
CENTERLINE OF PARTITION ASSEMBLY
(EXCLUSIVE OF ANY APPLIED FINISHES
HAVING THICKNESS WHICH MAY BE ADDED
TO SUCH WALLS) AT PARTITIONS FRAMED
WITH METAL STUDS. REFER TO "PARTITION
SCHEDULE" TO DETERMINE THE THICKNESS
OF EACH PARTITION ASSEMBLY TYPE.
CENTERLINE OF DOOR, WINDOW, OR
LOUVER OPENNING.
WHERE DIMENSIONS ARE NOT PROVIDED ON
THE FLOOR PLANS TO LOCATE DOOR
OPENING, APPLY THE FOLLOWING RULES, IN
ORDER, TO DETERMINE THE LOCATION OF
DOOR OPENINGS.
DOOR OPENINGS MAY BE DIMENSIONED ON
DWGS OTHER THAN THE FLOOR PLANS,
REFER TO THE SECTIONS, ELEVATIONS,
DETAILS, AND DOOR SCHEDULE NOTES FOR
ADDITIONAL DIMENSIONAL INFORMATION.
WHERE THE HINGE-SIDE OF A DOOR
IS SHOWN ADJACENT TO A WALL, OR
WALLS, PERPENDICULAR TO THE WALL IN
WHICH THE DOOR OPENING OCCURS,
LOCATE THE HINGE-SIDE FINISHED EDGE OF
THE DOOR OPENNING 100MM FROM THE
FACE(EXCLUSIVE OF ANY APPLIED FINISH)
OF THE CLOSEST PERPENDICULAR OR
PARTITION ASSEMBLY.
1.
A.
2.
B.
3.
C.
D.
A.
B.
4.
AX.XXX AX.XXX
X
AX.XXX AX.XXX
X
WOOD SUBSTRATE
W-1
GPE NUMBER (IF APPLICABLE)
SPOT/CEILING ELEVATION2.75
SPOT CEILING ELEVATION
CONSTITUTION AVE.
INDEPENDENCE AVE.
MOSHOOD ABIOLA RD.
NNAMDI AZIKIWE EXPRESS WAY
TAFAWA BALLEWA WAY
OLUSEGUN OBASANJO WAY
MOHAMMADU BUHARI WAY
HERBERT MACAULAY
ZAKARIA MAIMALARI ST
UNCLASSIFIED
A
CADD Plot Scale
CADD File Name:
Classification
PSP Project Number
OBO Project Number: Drawing Scale
Drawing Title
A/OBO/PE/PM A/OBO/PE/BDE
United States Department of State
Washington, D.C.
WARNING:
Release For Construction:
Date
Drawn By
Checked By
This document is the property of the U.S. Government.
Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of:
U.S. Department of State ATTN: Jim Thomas Washington, D.C. 20520.
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
1:1
Sheet Number
DE
LIV
ER
Y
TO
OB
O
P1
CD-1
M
AR
ABVH
B.L. Harbert International, L.L.C.
820 Shades Creek Pkwy, Suite 3000 Birmingham, AL 35209 Tel (205) 802-2800
Page Southerland Page, L.L.P.
3101 Wilson Blvd, Suite 300 Arlington, VA 22201-4419 Tel (703) 527-4100
Cervantes & Associates, P.C.
4229 Lafayette Center Dr, Suite 1125 Chantilly, VA 20151 Tel: (703) 691-4114
Ehlert /Bryan, Inc.
1451 Dolley Madison Blvd, Suite 220 McLean, VA 22101 Tel: (703) 827-9552
Schnabel Engineering North, L.L.C.
46020 Manekin Plaza, Suite 110 Sterling, VA 20166 Tel: (703) 779-0773
NEW OFFICE ANNEX
ABUJA, NIGERIA
Hankins and Anderson, Inc.
4880 Sadler Rd, Suite 300
Glen Allen, VA 23060 Tel. (804) 285-4171
Woods Peacock Engineering Consultants, Inc.
Halifax Office Park, Suite 420
5250 Cherokee Ave Alexandria, VA 22312-2052
Tel: (703) 658-4400
Hinman Consulting Engineers, Inc.
One Bush St, Suite 510
San Francisco, CA 94104 Tel: (415) 621-4423
AST Cowen Design Group LLC 1451 Dolley Madison Blvd, Suite 200
McLean, VA 22207 Tel: (703) 528-4424
P2
CD
IFC
M
AY
JU
N
A
UG
711082
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
171 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CDBC IFC
CD-2
O
CT
CDBC
D
EC
1 : 10
11/30/2012 4:29:39 PM
C :\U se rs
\m ic ha el r\D es kt op
\R ev it Fi le s\
A
B V\
A B
VH
A
_P K
G _m ic ha el r.r vt
FFS
TM A8.001
A8.001
ARCHITECTURAL LEGEND,
NOTES & ABBREVIATIONS
SAQMMA-11-C-0236
04 DECEMBER 2012
PKG
REVISIONS
NUMBER DESCRIPTION DATE
1 SAMPLE OF SIMILAR RAIL-MOUNTED PV ARRAY
2 LOCUS MAP
SHEET INDEX
ID
PV001
PV002
PV101
PV102
PV201
PV202
PV203
PV301
PV401
PV402
PV501
PV601
PV602
Name
COVER SHEET
PV SYSTEM NOTES
PV LAYOUT
STANDOFF & ATTACHMENT LAYOUT
SOURCE CIRCUIT WIRIING
TRANSITION BOX WIRING
WIRING DETAILS
CONDUIT, WIRING AND GROUNDING LAYOUT
STRUCTURAL ELEVATION
STRUCTURAL DETAILS
ELECTRICAL EQPT. PLAN
SINGLE LINE
LABELS
Published
SITE INFORMATION
PROJECT NAME: UNITED STATES EMBASSY
PHOTOVOLTAIC SYSTEM INSTALLATION
ADDRESS: AMERICAN EMBASSY
INDEPENDENCE AVENUE
ABUJA, NIGERIA
APPLICABLE US 2009 INTERNATIONAL BUILDING CODE
BUILDING CODES U.S. UNIFORM FEDERAL ACCESSIBILITY STANDARDS
FOR NEW CONSTRUCTION NATIONAL ELECTRIC CODE 2008
APPROXIMATE PV AREA 1,885 SQUARE METERS
DC SYSTEM RATING 294.5 kW AC SYSTEM POWER RATING 285 kW
PHOTOVOLTAIC PARKING CANOPY
U.S. EMBASSY
ABUJA, NIGERIA
ABBREVIATIONS
ABV ABOVE
AC ALTERNATING CURRENT
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AGG AGGREGATE
ALT ALTERNATIVE
ALUM ALUMINUM
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
BD BOARD
BEV BEVELED
BLDG BUILDING
BLK BLOCK(ING)
B.M. BENCH MARK
BOT BOTTOM
BRG BEARING
BRZ BRONZE
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BETW, BTWN BETWEEN
CAB CABINET
CB CATCH BASIN
C/C CENTER TO CENTER
CEM CEMENT
CIR CIRCLE
CJ CONTROL JOINT
CLG CEILING
CLOS CLOSET
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CNDT CONDUIT
CTR CENTER
DAS DATA AQUISITION SYSTEM
DC DIRECT CURRENT
DEG DEGREE
DEPT DEPARTMENT
DEMO DEMOLISH/DEMOLITION
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DISC DISCONNECT
DIV DIVISION
DN DOWN
DP DAMP PROOFING
DR DOOR
DWG DRAWING
E EAST
EA EACH
EG EXHAUST GRILLE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATION
EP ELECTRICAL PENTHOUSE
EPDM RUBBER ROOFING MEMBRANE
EQ EQUAL
EQPT EQUIPMENT
EQV EQUIVALVENT
EX, EXT'G EXISTING
EXP EXPANSION
EXT EXTERIOR
FDN FOUNDATION
FT FOOT OR FEET
FT-LBS FOOT POUNDS (UNIT OF TORQUE)
FTG FOOTING (AS IN SUPPORT)
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GL GLASS
GOVT GOVERNMENT
GRD GROUND
HC HANDICAPPED
HDW HARDWARE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HORZ HORIZONTAL
HR HOUR
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATING AND A/C
ID INTERIOR DIAMETER
IN INCH
INCL INCLUDE(ED)(ING)
INFO INFORMATION
INSUL INSULATION
INV INVERTER
JAN JANITOR
JC JANITOR'S CLOSET
JCT JUNCTION
JT JOINT
KD KNOCK DOWN
KO KNOCKOUT
KPL KICKPLATE
KW KILOWATT (UNIT OF POWER)
KWH KILOWATT-HOUR (UNIT OF ENERGY)
LBL LABEL
LBS POUNDS (UNIT OF WEIGHT & FORCE)
LF LIGHT FIXTURE
LG LONG
LH LEFT HAND
LL LIVE LOAD
LT LIGHT
LT WT LIGHT WEIGHT
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MEZZ MEZZANINE
MFG MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MIX MIXTURE
MM MILLIMETERS
MNTD MOUNTED
MO MASONRY OPENING
MOD MODULAR
MTG HT MOUNTING HEIGHT
MTL METAL
MULL MULLION
MULT MULTIPLE
N NORTH
NEC NATIONAL ELECTRIC CODE
NEG NEGATIVE
NIC NOT IN CONTRACT
NO NUMBER
NOB NEW OFFICE BUILDING
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
O.C. ON CENTER
OD OUTSIDE DIAMETER
OFF OFFICE
OPG OPENING
OPL ORNAMENTAL PLASTER
OPP OPPOSITE
ORIG ORIGINAL
ORN ORNAMENTAL
PAR PARALLEL
PERF PERFORATED
PERP PERPENDICULAR
PNTH PENTHOUSE
PKG PARKING FACILITY
PLAM PLASTIC LAMINATE
PLMB PLUMBING
PLWD PLYWOOD
PNTD PAINTED
P.O.C.C. POINT OF COMMON COUPLING
POL POLISHED
POS POSITIVE
PREP PREPARATION
PROJ PROJECT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PV PHOTOVOLTAIC
QTY QUANTITY
RAD RADIUS
RB RESILIENT BASE
RC REINFORCED CONCRETE
RD ROOF DRAIN
RECP RECEPTACLE
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCEMENT
REPRO REPRODUCE
REQ'D REQUIRED
RES RESILIENT BASE
REV REVISION
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
RWB RESILIENT WALL BASE
S SOUTH
SAD SEE ARCHITECTURAL DRAWINGS
SC SOLID CORE
SCH SCHEDULE
SECT SECTION
SERV SERVICE
SH SHELF, SHELVING
SHT SHEET
SIM SIMILAR
SM SHEET METAL
SPEC SPECIFICATIONS
SPX SERVICE ANNEX BUILDING
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STOR STORAGE
STRUC STRUCTURE
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPENDED
SYS SYSTEM
SYM SYMETRICAL
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERED
THK THICK
THR THRESHOLD
THRU THROUGH
TO TOP OF
TPL TEXTURED PLASTER
TRANS TRANSPARENT
TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR
TYP TYPICAL
T&G TONGE AND GROOVE
UG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
UV UNIT VENTILATOR
VENT VENTILATE/VENTILATION
VERT VERTICAL
VIF VERIFY IN FIELD
VOL VOLUME
VP VENT PIPE
VS VERSUS
W WEST
W/ WITH
WD WOOD
WDW WINDOW
WM WIRE MESH
W/O WITHOUT
WP WORKING POINT
WS WEATER STRIPPING
WT WEIGHT
+ POSITIVE
- NEGATIVE
1° FIXED TILT PV ARRAY
AZIMUTH: 0.00° E OF S
MODULES DC POWER AC POWER ANNUAL AC
ENERGY
1155/ 255W 294.5 kWdc 285 kWac 414,098 kWhr/yr
NOTES
1. SYSTEM DESIGN IS BASED ON THE FOLLOWING INFORMATION:
A) CONSTRUCTION DOCUMENTS BY B.L. HARBERT INTERNATIONAL
B) DESIGN REQUIREMENTS AS SPECIFIED BY U.S. DEPT OF STATE
2. CONTRACTOR SHALL VERIFY EXISTING CONSTRUCTION DOCUMENTS
PRIOR TO PROCEEDING WITH WORK IN THIS CONTRACT.
NOTIFY U.S. GOVERNMENT PROJECT DIRECTOR OF
ANY DISCREPANCIES IN THE DRAWINGS.
3. LOCATE AND MARK ALL UNDERGROUND UTILITIES IN THE
AREA OF WORK PRIOR TO CONSTRUCTION, IF REQUIRED.
4. DECIMAL INDICATOR: PERIOD (.)
5. NUMBER SEPARATOR: COMMA (,)
6. ALL DISTANCE UNITS ARE MILLIMETERS, UNLESS OTHERWISE NOTED
O
N
M
L
A
B
C
D
E
F
G
H
I
J
K
CADD Plot Scale
CADD File Name
Classification
PSP Project Number
OBO Project Number Drawing Scale
Drawing Title
United States Department of State
Washington, D.C.
WARNING:
Release For Construction:
Date
Drawn By
Checked By
This document is the property of the U.S. Government.
Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of:
U.S. Department of State ATTN: Jim Thomas Washington, D.C. 20520.
OFFICE OF OVERSEAS BUILDINGS
OPERATIONS
1:1
NEW
OFFICE ANNEX
FOR
Sheet Number
ABUJA, NIGERIA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
P
O
N
M
L
A
B
C
D
E
F
G
H
I
J
K
AS NOTED
Revisions Rev Number Revision Description Revision Date
CM, CH
RE
3/19/2013
B.L. Harbert International, L.L.C.
1030 London Dr. Suite 400 Birmingham, AL 35211 Tel (205) 802-2900
Page Southerland Page, L.L.P.
3101 Wilson Boulevard, Suite 300 Arlington, VA 22201-4419 Tel (703) 527-4100
Cervantes and Associates, P.C.
4229 Lafayette Center Drive. Suite 1125 Chantilly, VA. 20151 Tel: (703) 691-4114
Elhert /Bryan , Inc.
1451 Dolley Madison Blvd, Suite 220 Mclean, VA 22101 Tel: (703) 827-9552
Schnabel Engineering North , L.L.C.
46020 Manekin Plaza, Suite 110 Sterling, VA 20106 Tel: (703) 779-0773
Hankins and Anderson, Inc.
4880 Sadler Road Suite 300
Glen Allen, VA 23063 Tel. (804) 285-4171
Woods Peacock Engineering Consultants, Inc.
Halifax Office Park, Suite 420 5250 Cherokee Avenue
Alexandria, VA 22312-2052 Tel: (703) 658-4400
Hinman Consulting Engineers, Inc.
One Bush Street, Suite 510
San Francisco, CA 94104 Tel: (415) 621-4423
AST Cowen Design Group LLC 1451 Dolley Madison Blvd, Suite 200
McLean, VA 22207 Tel: (703) 528-4424
D
EL
IV
ER
Y
P-2
P-1
PV002
PV SYSTEM NOTES
CONSTRUCTION DRAWING SET
PROCEDURAL NOTES:
1. PRIOR TO COMMENCEMENT OF ANY WORK, THE CONTRACTOR SHALL NOTIFY ENGINEER OF RECORD OF ANY DISCREPANCIES
NOTED TO EXISTING CONDITIONS, STRUCTURE, ELECTRICAL RUNS (SPECIFY EXISTING ITEMS). AMONG SITE CONDITIONS, MANUFACTURER RECOMMENDATIONS OR CODES, REGULATIONS OR RULES OF JURISDICTIONS HAVING AUTHORITY.
2. ALL DIMENSIONS OF EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO COMMENCING WORK.
3. THE CONTRACTOR IS RESPONSIBLE FOR ALL BRACING AND SHORING OF EQUIPMENT DURING INSTALLATION.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS, OSHA REQUIREMENTS AND SAFETY MEASURES ON
SITE. THE ENGINEER HAS NO OVERALL SUPERVISORY AUTHORITY AND NO DIRECT RESPONSIBILITY FOR THE SPECIFIC WORKING
CONDITIONS OR FOR POSSIBLE EXISTING HAZARDS.
5. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE ENGINEER OF RECORD FOR APPROVAL PRIOR
TO MAKING ANY CHANGES.
6. APPROVED CHANGES SHALL REQUIRE A DRAWING REVISION TO MAINTAIN CONTROL OVER THE ENGINEER APPROVED DESIGN. DEVIATION FROM THESE PLANS PRIOR TO ENGINEER APPROVAL PLACES ALL LIABILITY ON THE CONTRACTOR.
GENERAL NOTES:
1. STRUCTURAL FIELD CONDITIONS ARE TO BE DETERMINED BY OTHERS, AND PLANS ARE TO BE MODIFIED AS NEEDED/IF
APPROPRIATE. DEFICIENCIES SHOULD BE NOTED AND CORRECTED PRIOR TO THE START OF CONSTRUCTION.
2. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EQUIPMENT AND FOLLOWING ALL MANUFACTURER'S
OR ENGINEER'S DIRECTIONS AND INSTRUCTIONS SHOWN ON CONSTRUCTION DOCUMENTS.
3. THE ELECTRICAL CONTRACTOR IS ADVISED THAT UTILITY INTERCONNECTION REQUIREMENTS AND ALL DRAWINGS, COMPONENT MANUALS, ESPECIALLY THE INVERTER MANUALS, ARE TO BE READ AND UNDERSTOOD PRIOR TO INSTALLATION OR
ENERGIZING OF ANY EQUIPMENT.
4. THE CONTRACTOR IS ALSO ADVISED TO HAVE ALL COMPONENT & SWITCHES IN THE OFF (OPEN) POSITION AND FUSES
REMOVED PRIOR TO INSTALLATION OF FUSE-BEARING COMPONENTS.
5. THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO BE INSTALLED FOLLOWING THE CONVENTIONS OF THE NATIONAL ELECTRIC CODE
AND ANY LOCAL CODE WHICH MAY SUPERSEDE THE NEC SHALL GOVERN.
6. ALL COMPONENTS TO BE INSTALLED WITH THIS SYSTEM ARE TO BE LISTED BY A THIRD PARTY TESTING AGENCY (UL, ETL, ETC.). EQUIPMENT SHALL BE NEMA 3R OUTDOOR RATED OR BETTER, UNLESS LOCATED INDOORS. EQUIPMENT INSTALLED
INDOORS MAY BE RATED NEMA 1.
7. DC VOLTAGE FROM THE ARRAY IS ALWAYS PRESENT AT THE DC COMBINER ENCLOSURES AND THE DC TERMINALS OF THE INVERTER DURING DAYLIGHT HOURS. ALL PERSONS WORKING ON OR INVOLVED WITH THIS PHOTOVOLTAIC SYSTEM MUST BE WARNED THAT SOLAR MODULES ARE ENERGIZED WHEN EXPOSED TO DAYLIGHT. THE LINE AND LOAD TERMINALS ON THE DC DISCONNECTS MAY BE ENERGIZED IN THE OFF (OPEN) POSITION AND THE SWITCH IS TO BE LABELED TO COMPLY WITH ARTICLE
690.17 OF THE NEC REFLECTING THIS.
8. ALL PORTIONS OF THIS SOLAR ELECTRIC SYSTEM SHALL BE CLEARLY MARKED IN ACCORDANCE WITH THE NATIONAL
ELECTRIC CODE ARTICLE 690.
9. THE ELECTRICAL CONTRACTOR SHALL PERFORM INITIAL HARDWARE CHECKS AND PV WIRING CONDUCTIVITY CHECKS PRIOR TO TERMINATING ANY WIRES. ALL AC AND DC WIRE RUNS SHALL BE MEGGER TESTED AT 1000 VDC TO DEMONSTRATE A MINIMUM
OF 5 MEGAOHMS INSULATION RESISTANCE TO GROUND.
10. DO NOT MEGGER THE SOLAR MODULES, AS THIS WILL LIKELY DAMAGE THEIR INTERNAL DIODES. MEGGERING IS INTENDED FOR ALL CONDUCTORS INSTALLED BY THE ELECTRICAL CONTRACTOR. RESTRICT MEGGER TO 1000v
11. FOR PROPER MAINTENANCE AND ISOLATION OF INVERTERS, REFER TO ISOLATION PROCEDURE IN INVERTER OPERATION MANUAL. CONTRACTOR PERFORMING THE MAINTENANCE IS RESPONSIBLE TO FOLLOW ALL LOCKOUT TAGOUT PROCEDURES.
12. THIS PHOTOVOLTAIC SYSTEM'S UTILITY INTERCONNECTION POINT SHALL MEET THE SPECIFIC REQUIREMENTS OF ARTICLE 690.64, NATIONAL ELECTRIC CODE. PLEASE FOLLOW THE SPECIFIC INSTRUCTIONS IN THIS DRAWING SET TO MEET THIS CODE
REQUIREMENT.
13. THE GROUNDING OF THE PHOTOVOLTAlC SYSTEM SHALL COMPLY WITH NEC 690.45 AND NEC 690.47. IF THE REQUIREMENTS DESCRIBED IN THIS DRAWING SET ARE CLOSELY FOLLOWED, THE GROUNDING REQUIREMENT WILL BE MET. ANY CHANGES WILL NEED TO BE REVIEWED AND DEEMED ACCEPTABLE BY THE ENGINEER, MANUFACTURER AND LISTING AGENCY FOR PRODUCT
SAFETY.
14. THE ELECTRICAL CONTRACTOR IS NOT TO START OR COMMISSION THE PV OR INVERTER SYSTEM AT ANY TIME, UNLESS
NOTIFIED OTHERWISE IN WRITING. THIS WILL BE DONE BY OTHERS.
15. THE CONTRACTOR IS RESPONSIBLE FOR MOUNTING ALL EQUIPMENT PER THE ENGINEER'S INPUT OR MANUFACTURER'S SPECIFICATIONS. IF SPECIFICATIONS ARE NOT APPARENT, THE CONTRACTOR SHALL USE DILIGENT EFFORTS TO MOUNT EQUIPMENT SUCH THAT IT WILL BE CLEAN, LEVEL AND SOLID IN ORDER TO LAST THE LIFETIME OF THIS SOLAR ELECTRIC SYSTEM.
16. ANY METAL SHAVINGS RESULTING FROM SITE WORK SHALL BE CLEANED FROM ENCLOSURE INTERIORS, TOP SURFACES OF ENCLOSURES, ROOF SURFACE, GROUND SURFACE AND ANY ADDITIONAL AREAS WHERE OXIDIZED OR CONDUCTIVE METAL
SHAVINGS MAY CAUSE RUST, ELECTRICAL SHORT CIRCUITS OR OTHER DAMAGE
17. ALL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER, RECTILINEAR TO THE STRUCTURE.
18. ALL COMPONENTS SHOWN ON THE SINGLE LINE DIAGRAM, BUT NOT ON THE PLAN OR VICE VERSA, SHALL BE INCLUDED AS IF
SHOWN ON BOTH.
19. CONTRACTOR SHALL REVIEW ALL TRADES' CONTRACT DOCUMENTS TO DETERMINE SPECIFIC MOUNTING LOCATIONS FOR
ELECTRICAL EQUIPMENT. COORDINATE EXACT MOUNTING LOCATIONS.
20. THE CONTRACTOR SHALL REVIEW THE ARCHITECTURAL AND MECHANICAL DRAWINGS AND COORDINATE THE ELECTRICAL
WORK WITH THE OTHER CONTRACTORS. SHOULD CONFLICTS, DISCREPANCIES, OR DEFICIENCIES, ARISE WHICH REQUIRE CHANGES IN THE CONTRACT DOCUMENTS, IMMEDIATELY NOTIFY THE ENGINEER. OBTAIN WRITTEN DIRECTION ON NECESSARY
ADJUSTMENTS BEFORE THE INSTALLATION IS MODIFIED.
21. ALL COMPONENTS SHOWN ON THE RISER DIAGRAMS, BUT NOT ON THE PLAN OR VICE VERSA, SHALL BE INCLUDED AS IF
SHOWN ON BOTH.
22. THE DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF NEW CIRCUITS, NUMBERS OF CIRCUITS, LOCATIONS OF OUTLETS, AND THE INTERCONNECTION. THE CONTRACTOR MAY MODIFY THE RACEWAY ARRANGEMENT TO ACCOMMODATE FIELD
CONDITIONS.
23. ALL NEW CIRCUITRY SHALL BE ACCURATELY RECORDED BY THE CONTRACTOR TO BE INCORPORATED IN TO A RECORD SET
OF AS-BUILT DRAWINGS ISSUED UPON COMPLETION OF INSTALLATION PRIOR TO START UP.
24. PROVIDE COMPLETE, ACCURATE, LAMINATED AND TYPED PANELBOARD CIRCUIT DIRECTORIES AT THE COMPLETION OF WORK
FOR ALL PANELS IN THIS PROJECT.
25. LAYOUT ALL WORK IN ADVANCE. WHERE CUTTING, CHANNELING, CHASING OR DRILLING OF FLOORS, WALLS PARTITIONS, CEILINGS OR OTHER SURFACES IS NECESSARY FOR SUPPORT OR ANCHORAGE OF RACEWAYS, OUTLETS OR ELECTRICAL EQUIPMENT, THIS WORK SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR. ANY DAMAGE TO PIPING, EQUIPMENT OR DEFACED FINISH, OR METALWORK SHALL BE REPAIRED BY SKILLED CRAFTSMEN OF TRADES INVOLVED AT NO ADDITIONAL COST TO THE OWNER. DO NO CUTTING, CHANNELING, DRILLING, WELDING OF STRUCTURAL MEMBERS OF THE BUILDING WITHOUT
OBTAINING APPROVAL FROM THE ENGINEER.
26. SWITCHES SHALL BE MARKED AND IDENTIFIED WITH E-Z MARKERS OR DYMOTAPED AND PEN-MARKED (WITH PERMANENT MARKER) INSIDE COVER TO SHOW PANEL AND CIRCUIT BREAKER NUMBER. WIRES SHALL BE MARKED WITH CIRCUIT NUMBERS
USING BRADY MARKERS (OR EQUAL) AT PANEL.
27. ALL ARRAY WIRING MAY BE RUN EXPOSED UNLESS SPECIFIED OTHERWISE.
28. DO NOT INSTALL DC FEEDER CONDUITS IN A CONCEALED MANNER. AC CONDUITS MAY BE INSTALLED IN A CONCEALED
MANNER UNLESS OTHERWISE NOTED.
29. MINIMUM SIZE BRANCH CIRCUIT CONDUIT SHALL BE 1 IN.
30. EMPTY CONDUITS SHALL BE PROVIDED WITH NYLON PULL STRING.
31. PROVIDE INSULATED GROUND WIRE (THHN/THWN) FOR ALL BRANCH CIRCUITS.
32. PROVIDE SEPARATE INSULATED EQUIPMENT GROUNDING CONDUCTOR WITH ALL BRANCH CIRCUITS. TERMINATE EACH END
ON A GROUNDING LUG, BUS, OR BUSHING.
33. PROVIDE CIRCUIT NUMBER IDENTIFICATION MARKERS ON ALL CONDUCTORS, NEUTRALS, AND GROUNDS IN ALL
PANELBOARDS, BOXES, AND OUTLETS.
34. THE CONTRACTOR SHALL INFORM THE ENGINEER OF ALL DISCREPANCIES BETWEEN DRAWINGS OF DIFFERENT TRADES, PRIOR TO INITIATION OF ANY WORK.
35. THE CONTRACTOR IS FULLY RESPONSIBLE FOR ON-SITE SAFETY OF THE SITE WORKERS AND THE GENERAL PUBLIC DURING
CONSTRUCTION.
36. THE CONTRACTOR WILL FURNISH AND INSTALL ALL ANCHOR BOLTS, NUTS, WASHERS, GROUT, CONCRETE PADS, AND
REINFORCING STEEL REQUIRED FOR PROPER INSTALLATION OF ANY EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S
REQUIREMENTS.
37. ALL CONTRACTORS ARE REQUIRED TO EXAMINE THE DRAWINGS AND SPECIFICATIONS CAREFULLY, TO VISIT THE SITE AND FULLY INFORM THEMSELVES AS TO ALL EXISTING CONDITIONS AND LIMITATIONS, PRIOR TO SUBMITTING THE PROPOSAL. FAILURE TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS AND LIMITATIONS WILL IN NO WAY RELIEVE CONTRACTOR FROM FURNISHING ANY MATERIALS OR PERFORMING ANY WORK IN ACCORDANCE WITH DRAWINGS AND SPECIFICATIONS. NO ADDITIONAL COST SHALL BE PASSED ON TO THE OWNER FOR FAILURE TO COMPLY WITH THIS
REQUIREMENT.
ELECTRICAL NOTES:
1. ALL NEW CIRCUITRY SHALL BE ACCURATELY RECORDED BY THE CONTRACTOR TO BE INCORPORATED IN TO A RECORD SET
OF AS-BUILT DRAWINGS COMPLETED UPON COMPLETION OF WORK.
2. IN EVERY PULL BOX, TERMINAL BOX, AND AT ALL PLACES WHERE WIRES MAY NOT BE READILY IDENTIFIED BY NAMEPLATE
MARKINGS ON THE EQUIPMENT TO WHICH THEY CONNECT, IDENTIFY EACH WIRE WITH A LABEL OR TAG FOR CIRCUIT ID NUMBER, AS WELL AS POLARITY OR PHASE.
2. THE LAYOUT OF CONDUIT SHOWN IN THESE PLANS IS SCHEMATIC ONLY. CONTRACTOR SHALL ROUTE AND LOCATE THE CONDUITS TO SUIT SITE CONDITIONS, BUT SHALL NOT EXCEED THE MAXIMUM CONDUCTOR LENGTHS IDENTIFIED ON THE WIRE SCHEDULE. CONTRACTOR WILL COORDINATE ALL CHANGES IN WIRING AND CONDUIT WITH THE ENGINEER.
3. WHERE WIRE AND CABLE ROUTING IS NOT SHOWN, AND DESTINATION ONLY IS INDICATED, CONTRACTOR SHALL DETERMINE EXACT ROUTING AND LENGTHS REQUIRED. A SHOP DRAWING OF PROPOSED INSTALLATION SHALL BE SUPPLIED TO ENGINEER OF
RECORD PRIOR TO INSTALLATION.
4. BENDS SHALL NOT DAMAGE THE CONDUIT, OR SIGNIFICANTLY CHANGE THE INTERNAL DIAMETER OF CONDUITS (NO KINKS).
5. SUPPORT CONDUCTORS IN VERTICAL CONDUITS IN ACCORDANCE WITH REQUIREMENTS IN NEC 300.19
6. INSTALL ALL WIRING MATERIALS IN A NEAT WORKMANLIKE MANNER. USE GOOD TRADE PRACTICES AS REQUIRED BY CHAPTER
3 OF THE NEC. ALL EXPOSED CABLES, SUCH AS MODULE LEADS, TO BE SECURED WITH UV RATED MECHANICAL OR OTHER
APPROVED MEANS WITH A 25 YEAR LIFE.
7. INSTALL CONDUIT TO MAINTAIN PROPER CLEARANCES AND IN A NEAT, INCONSPICUOUS MANNER. RUN PARALLEL AND AT RIGHT ANGLES TO STRUCTURAL MEMBERS OR OTHER CONDUITS. PROVIDE BOXES, FITTINGS AND BENDS FOR CHANGES IN DIRECTION. FASTEN CONDUIT SECURELY IN PLACE. SUPPORT CONDUIT USING STEEL PIPE STRAPS, LAY-IN ADJUSTABLE HANGERS, CLEVIS HANGERS OR SPLIT-HANGERS. HANGER SPACING SHALL BE INSTALLED PER NEC REQUIREMENTS FOR THE TYPE OF CONDUIT BEING INSTALLED. USE APPROVED BEAM CLAMPS FOR CONNECTION TO STRUCTURAL MEMBERS.
8. PROVIDE PULL OR JUNCTION BOXES, WHERE REQUIRED TO FACILITATE THE INSTALLATION OF WIRING, IN ADDITION TO THOSE SHOWN ON THE DRAWINGS. TOTAL BENDS IN CONDUITS BETWEEN BOXES FOR WIRE ACCESS SHALL NOT EXCEED THE
EQUIVALENT OF FOUR 90° BENDS.
9. PER NEC300.7, CONDUIT RUNS EXPOSED TO DIFFERENT TEMPERATURES, WHERE CONDENSATION IS KNOWN TO BE PROBLEMATIC, SHALL BE FILLED WITH AN APPROVED MATERIAL TO PREVENT CIRCUILATION OF WARM AIR TO A COLD REGION.
10. WHEN FIELD CUTTING IS REQUIRED, THE CONDUIT SHALL BE CUT SQUARE AND DEBURRED.
11. CONDUIT SIZES NOT SPECIFIED SHOULD CONFORM TO NEC SPECIFICATIONS, TO INCLUDE FILL FACTOR AND DERATING FOR
NUMBER OF CONDUCTORS WITH A MINIMUM CONDUIT SIZE BEING 3/4".
12. SAFETY REGULATIONS (LOCK OUT - TAG OSHA OUT, ETC .. ) ARE THE FULL RESPONSIBILITY OF THE CONTRACTOR DURING
CONSTRUCTION (NFPA70E)
13. THE WIRING SIZE IS BASED ON THE ESTIMATED CONDUIT ROUTING AS SHOWN IN THIS DRAWING PACKAGE. SHOULD THE
CONDUIT'S LENGTH INCREASE DUE TO RELOCATION OF SOURCE AND/OR ROUTING, THE CONDUITS AND THE CONDUCTORS MAY NEED TO BE RESIZED. PLEASE CONTACT THE ENGINEER PRIOR TO MAKING ANY FIELD CHANGES.
14. ALL WIRING IN CONDUIT SHALL BE THWN-2 FOR 90C APPLICATIONS. USE BARE COPPER FOR GROUND FOR ALL EXTERNAL GROUNDING. PV WIRE OR APPROVED EQUIVALENT SHALL BE USED FOR ALL EXPOSED OR PV JUMPER HOMERUN WIRING.
15. ALL CONDUITS SHALL BE FREE OF ANY OBSTRUCTIONS AND PROPERLY SECURED BEFORE WIRE IS PULLED.
16. ELECTRICAL CONTRACTOR TO PROVIDE SIGNAGE TO ALL ELECTRICAL BOXES, JUNCTION BOXES, PULL BOXES, DC
DISCONNECTS, CONDUIT RUNS, AC DISCONNECTS, SUB PANELS AND MAIN SERVICES PER NEC ARTICLE 690.
17. MEGGER TESTING: MEGGER (INSULATION) TEST ALL CONDUCTORS AT 1,000V TO 5 MEGAOHMS BETWEEN THE CONDUCTOR
UNDER TEST AND GROUND WIRE. CONDUCT TEST AFTER WIRE IS PULLED THROUGH THE CONDUIT, BUT BEFORE CONNECTING TO THE MODULES, COMBINERS, DISCONNECTS OR INVERTER. DO NOT MEGGER TEST THE MODULES, AS THEY MAY BE DESIGN
LIMITED TO 600V AND MAY DAMAGE THE DEVICE.
18. ALL FASTENERS SHALL BE STAINLESS STEEL, UNLESS OTHERWIZE NOTED.
19. CIRCUIT NUMBERS ARE DIAGRAMMATIC. EXACT NUMBERS SHALL BE DETERMINED IN THE FIELD AND REFLECTED ON AS-
BUILT DOCUMENTATION BY THE ELECTRICAL CONTRACTOR. THE ASSOCIATED CIRCUIT NUMBERS THAT ARE APPLIED TO EACH DEVICE AND PIECE OF EQUIPMENT INFERS INTERCONNECTING BRANCH CIRCUITRY. INTERCONNECTING JUMPER WIRING
SHALL BE SIZED EQUAL TO THE HOMERUN UNLESS NOTED OTHERWISE.
20. VOLTAGE DROP HAS BEEN CONSIDERED IN THE DESIGN OF ALL CIRCUITRY AND FEEDER SIZES BASED UPON THE ILLUSTRATED EQUIPMENT LAYOUTS AND SHORTEST CONDUCTOR/RACEWAY ROUTING. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR DEVIATIONS TAKEN THAT WILL INCREASE CONDUCTOR/RACEWAY ROUTING LENGTHS. BRANCH CIRCUITS LONGER THAN 75' FOR 240V FROM PANEL TO LAST OUTLET SHALL BE INCREASED A MINIMUM OF ONE SIZE ABOVE THAT SPECIFIED TO LIMIT VOLTAGE DROP TO LESS THAN 3%. FEEDERS SHALL FOLLOW SIMILAR GUIDELINES AND BE LIMITED TO 2%
DROP.
21. ALL EXPOSED CIRCUITRY ON ROOFTOPS, ON EXTERIOR WALLS, OR IN THE FIELD SHALL BE INSTALLED IN RIGID METAL CONDUIT WITH FLEXIBLE CONNECTIONS TO ALL EQUIPMENT UTILIZING LIQUID TIGHT FLEXIBLE METAL CONDUIT NOT T0 EXCEED 18". ALL PENETRATIONS OF WEATHER TIGHT BOXES SHALL UTILIZE WEATHERPROOF HUBS. ALL CONDUIT SUPPORTS SHALL BE HOT DIPPED GALVANIZED. ALL FASTENERS, MISCELLANEOUS SUPPORTS (UNISTRUT OR EQUAL) AND HARDWARE UTILIZED FOR
THE ELECTRICAL INSTALLATION SHALL BE STAINLESS STEEL.
22. SWITCHBOARDS, PANELBOARDS, AND METER SOCKET ENCLOSURES, SHALL BE FIELD MARKED TO WARN QUALIFIED PERSONS OF POTENTIAL ELECTRIC ARC FLASH HAZARDS. THE MARKING SHALL BE LOCATED SO AS TO BE CLEARLY VISIBLE TO QUALIFIED PERSONS BEFORE EXAMINATION, ADJUSTMENT, SERVICING, OR MAINTENANCE OF THE EQUIPMENT.
23. ANY NEW CIRCUIT BREAKERS ADDED TO EXISTING PANELS, SHALL MATCH EXISTING FRAME AND AIC RATING.
24. WHERE WIRING, CONDUIT, AND OTHER ELECTRICAL ITEMS PASS THROUGH INACCESSIBLE AREAS, AN ACCESS METHOD
SHALL BE PROVIDED, WHETHER ON THE DRAWINGS OR NOT.
24. UTILITY AND EXISTING ELECTRICAL EQUIPMENT LOCATIONS ARE APPROXIMATE. ACTUAL LOCATIONS TO BE VERIFIED IN
FIELD.
25. CONDUIT SUPPORTS SHALL BE MADE FROM RECYCLED RUBBER OR EQUIVALENT TYPE WITH UNISTRUT OR EQUIVALENT TO
SECURE CONDUITS. POLYEHTYLENE OR WOOD SUPPORTS ARE NOT ACCEPTABLE.
26. CONDUIT SUPPORTS SHALL MAINTAIN MINIMUM 3.5" ABOVE ROOF SURFACE.
27. RMC TO BE RUN OUTDOORS, EMT TO BE RUN INDOORS, AND PVC TO BE USED UNDERGROUND AND INSIDE CONCRETE WITH
RMC SWEEPS ABOVE GROUND.
RACKING SYSTEM NOTES:
1. INSTALL RACKING SYSTEM ACCORDING TO MANUFACTURER'S REQUIREMENTS.
MODULE INSTALLATION NOTES:
1. REFER TO THE MODULE MANUAL FOR MORE DETAILS ON RIGGING, UNPACKING, HANDLING, PLANNING, INSTALLATION AND
TORQUE SPECIFICATION.
2. THE MODULES MAY BE SHIPPED WITH MULTIPLE MODULES PER BOX. TAKE CARE WHEN OPENING THE BOX TO ENSURE
THAT ALL MODULES ARE SECURELY HANDLED.
3. NEVER LEAVE A MODULE UNSUPPORTED OR UNSECURED. CONTRACTOR IS RESPONSIBLE FOR ALL MATERIAL HANDLING
ON THE JOB SITE.
4. DAMAGED MODULES SHALL BE REPLACED PROMPTLY AND CONTRACTOR SHALL MAINTAIN INVENTORY OF SPARE MODULES
ATICIPATING BREAKAGE DURING INSTALLATION AND ARRAY START UP.
SOLAR ARRAY START-UP:
IF THE INSTALLING CONTRACTOR HAS RECIEVED WRITTEN PERMISSION TO START UP THE SYSTEM, THE FOLLOWING PROCEDURE AT MINIMUM SHALL BE COMPLETED BEFORE CLOSING DISCONNECTS OR ATTEMPTING TO ENERGIZE THE INVERTERS:
1. CHECK THE OPEN CIRCUIT VOLTAGE (Voc) AND POLARITY (+/-) OF EACH SOURCE CIRCUIT. RECORD THE VALUES ON THE
COMMISSIONING RECORD DOCUMENTS.
2. CHECK THE SHORT CIRCUIT CURRENT (Isc) FOR EACH SOURCE CIRCUIT. RECORD THE VALUES ON COMMISSIONING
RECORD DOCUMENTS.
3. CHECK THAT ALL FUSES, DISCONNECTS AND OTHER BALANCE OF SYSTEM COMPONENTS ARE RATED FOR 600 VDC AND
THE APPROPRIATE CURRENT CAPACITY.
4. COMPLETE A VISUAL INSPECTION OF ALL THE MODULES TO CHECK FOR BROKEN GLASS, LOOSE FASTENERS, FRAYED
WIRES, EXPOSED CONDUCTORS AND ANY OTHER PROBLEMS THAT MAY CAUSE A FAULT.
INVERTER START-UP:
IF THE INSTALLING CONTRACTOR HAS RECIEVED WRITTEN PERMISSION TO START UP THE SYSTEM, THE FOLLOWING PROCEDURE AT MINIMUM SHALL BE COMPLETED BEFORE CLOSING DISCONNECTS OR ATTEMPTING TO ENERGIZE THE INVERTERS:
1. CHECK THAT THE INVERTER IS PROPERLY GROUNDED, AS DESCRIBED BY THE MANUFACTURER AND THESE INSTRUCTIONS.
2. CHECK THE INVERTER DC INPUT VOLTAGE (Voc) FROM THE SOLAR ARRAY FOR PROPER POLARITY INSIDE THE INVERTER
CABINET.
3. CHECK DC INPUT VOLTAGE (Voc) IS WITHIN THE PROPER RANGE IN THE INVERTER CABINET AS DEFINED BY THE INVERTER
RATING LABEL AND MANUFACTURE’S INSTALLATION AND OPERATION MANUAL.
4. CHECK AC INPUT VOLTAGES IS IN THE PROPER PHASE SEQUENCE (CLOCKWISE) IF APPLICABLE
5. CHECK THAT THE AC GRID VOLTAGE, AT THE INVERTER AC TERMINALS, IS WITHIN THE PROPER RANGE AS DEFINED BY THE
INVERTER RATING LABEL AND MANUFACTURE’S MANUAL
6. FOLLOW START-UP SEQUENCE IN MANUFACTURER'S OPERATION AND MAINTENANCE MANUAL.
SYSTEM COMMISSIONING:
1. PERFORM PHOTOVOLTAIC SYSTEM COMMISSIONING IN ACCORDANCE WITH SPECIFICATION SAQMMA-11C-0236, SECTION
13650.
ELECTRICAL NOTES FOR PHOTOVOLTAlC SYSTEM
1. THIS PROPOSED SOLAR ELECTRIC SYSTEM IS INTENDED TO OPERATE IN PARALLEL WITH POWER RECEIVED FROM THE
UTILITY SERVICE PROVIDER.
2. THE PHOTOVOLTAIC SOURCE CIRCUITS AND PHOTOVOLTAlC OUTPUT CIRCUITS OF THIS PROPOSED SOLAR SYSTEM SHALL NOT BE CONTAINED IN THE SAME RACEWAY CABLE TRAY, CABLE, OUTLET BOX, JUNCTION BOX, OR SIMILAR FITTING AS FEEDERS OR BRANCH CIRCUITS OF OTHER SYSTEMS, UNLESS THE CONDUCTORS OF THE DIFFERENT SYSTEMS ARE
SEPAR…