PR16180282_19N15026Q0003_SOW for New Robalo Boat OR EQUAL.pdf
PDF 313 KB Posted
- Attached to
- PR16180282-19N15026Q0003 - Supply and Delivery of One New Robalo Boat Model 270/R300 OR EQUAL
- Solicitation number
- PR16180282-19N15026Q0003
- Issued by
-
Department of State
About this file
Statement of Work Summary: Robalo Boat Supply and Delivery
This is a Statement of Work for the supply and delivery of one new 2024 Robalo boat (Model R270 or R300) for the Regional Security Office (RSO) office's security operations in Nigerian waterways and coastal areas. The boat must be new factory-fitted and suitable for continuous offshore/coastal operations.
Technical Specifications and Deliverables
The contractor shall supply and deliver a Robalo R270 or R300 Center Console boat with the following specifications: overall length of 27 feet 2 inches, beam of 9 feet 6 inches, and dry weight of 7,000 pounds. The vessel must feature a white hull with hand-laid fiberglass construction, Robalo Variable Deadrise Hull with 250 US gallons fuel capacity, and accommodate 12 persons or 2,400 pounds maximum. Propulsion consists of twin Yamaha F300 4-stroke outboard engines (600 total HP) with Yamaha digital electronic controls and joystick option, Hydraulic Sea Star power steering, Garmin GPSMAP VHF radio with 8-foot antenna, stereo system, LED navigation and spreader lights, underwater lights, bilge pumps, and safety equipment including anchor with windlass, fenders, dock lines, fire extinguishers, and life jackets. The contractor must provide a Manufacturer's Certificate of Origin, engine warranty documents (Yamaha 3-5 year, balance remaining), Robalo 10-year hull warranty, one year electronics/accessories warranty with 90-day vendor support, operation and maintenance manuals, one-day handover training for operators, and a spare parts kit including engine oil filters, fuel filters, spark plugs, and prop wrench. The contractor must complete a full-speed sea trial demonstrating no defects and obtain commissioning certification. Acceptance occurs upon physical inspection confirming 2024 specifications match requirements, successful sea trial completion, and delivery of all documentation, keys, and completion of training. The contractor is responsible for relocating obstructing items, cleaning the work area, and removing construction waste upon job completion. An estimated time schedule for completion must be provided in the contractor's quote.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NDAA - COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .