191D3226R0032-00002 SF-30 Amendment Prapatan C1 Make-Ready.pdf

PDF 275 KB Posted

Attached to
FAC - Prapatan C1 Maintenance and Repair 2026
Solicitation number
PR15953528
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for Solicitation No. 191D3226R0032 issued by the U.S. State Department's General Services Office/Procurement Contracting Unit (GSO/PCU) at the American Embassy in Jakarta. The amendment, numbered 00002 and effective June 24, 2026, extends the proposal submission deadline to June 29, 2026, at 12:00 PM local Jakarta time.

The amendment revises the Statement of Work for maintenance make-ready work at Prapatan C1 under Contract Line Item Numbers (CLINs) 001 and 002. Specifically, it deletes Make Ready Work #1 from both CLINs, which involved scraping, re-plastering all interior and masonry walls to specified flatness standards with water-resistant mixture in lower sections. The amendment also revises Make Ready Work #2 in both CLINs to focus on painting interior walls and ceilings according to specifications, including repair of cracked, flaking, bumpy, mold-affected, efflorescent, and broken surfaces, with complete removal of existing paint layers and wallpaper prior to repainting. All other terms and conditions of the original solicitation remain unchanged. Contractors must acknowledge receipt of this amendment prior to the extended deadline to avoid rejection of their offers.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

00002 06/24/2026

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

CODE

GSO/PCU

American Embassy Jakarta Phone: (6221)5083-1000

8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

191D3226R0032

9B. DATED (SEE ITEM 11)

04/28/2026

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by or letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN

ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER Specify type of modification and authority

E. IMPORTANT: Contractor is not, is required to sign this document and return _1_ copy to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The purpose of the amendment is to:

Extend the proposal submission date to June 29, 2026, at 12:00 PM local Jakarta time.

Revise the Statement of Work under CLIN 001 and CLIN 002 as described on Page 2 of this amendment.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Michael Howard 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign)

BY _____________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30

(REV. 10-83)

SOLICITATION 191D3226R0032 – AMENDMENT 00002

Change 1 – Proposal Submission Date

The date and time for receipt of offers is hereby extended to June 29, 2026, at 12:00 PM local Jakarta time. All other terms and conditions remain unchanged.

Change 2 – Section B, Statement of Work

Solicitation No. 191D3226R0032, Maintenance Make Ready at Prapatan C1, is amended as follows:

1. Delete Make Ready Work #1 from both of the following CLINs:

CLIN 001 – Make Ready with Minor Repair, Page 5 CLIN 002 – Make Ready with Major Repair, Page 6

The deleted work item is:

“Scrape off and re-plaster all existing interior walls covered with old calcium plastering and replace with mortar cement plaster accordingly. Re-plaster walls in a manner that will prevent future hairline cracks.

Re-plaster all masonry walls, including those not visible from habitable areas. The new plastering must be smooth and flat, with deviation not more than plus or minus 5 mm in 3 m from a true plane in finished plaster surfaces, as measured by a 3-m straightedge placed at any location on the surface. Plaster from floor level to 500 mm height shall be a water-resistant mixture.”

2. Revise Make Ready Work #2 in both of the following CLINs:

CLIN 001 – Make Ready with Minor Repair, Page 5 CLIN 002 – Make Ready with Major Repair, Page 6

Delete the existing text for Make Ready Work #2 and replace it with the following:

“Paint the interior walls and ceilings of the house according to the specifications. Repair all cracked, flaking, bumpy, mold-affected, efflorescent, and broken surfaces. Ensure that all wall and ceiling surfaces are even prior to repainting. There shall be no bumpy or wavy surfaces after the painting work is completed. Scrape off existing wall paint layers and wallpaper. Existing wall paint layers must be completely removed from the wall surface.”

Michael Howard

2026-06-24T15:51:17+0700
Michael Louis Howard

File details come from the government source that posted it. Updated .