PR_0040581618_02081000_SOW.doc
DOC document 2 MB Posted
- Attached to
- REMOVAL OF DISCONTINUED GAGE 02081022
- Solicitation number
- 140G0122Q0222
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140G0122Q0222_Amd_0002.pdf | ||
| Sol_140G0122Q0222_Amd_0001.pdf | ||
| DBA_NC20220038.pdf | ||
| DBA_NC20220048.pdf | ||
| 0040581613_02081022_SOW.doc | DOC document | |
| 0040581614__02096500_SOW.doc | DOC document | |
| DBA_NC_20220065.pdf | ||
| DBA_NC20220066.pdf | ||
| DBA_NC_20220020.pdf | ||
| 0040581616__02100500_SOW.doc | DOC document | |
| 02077303_SOW.doc | DOC document | |
| 0040581615__02093000_SOW.doc | DOC document | |
| Sol_140G0122Q0222.pdf | ||
| DBA_NC20220064.pdf | ||
| B08_Attach_G1_DBA_NC20220064.pdf | ||
| 0040581617_02108000_SOW.doc | DOC document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
I. Project Identification
A.
Title:
Removal of Discontinued 6’ Round x 30’ tall concrete Gage Structure B.
Location:
36( 12’ 33” N, -77( 23’ 02” W
US HWY 258, Tillery, NC C.
Local Contact Information:
Mason Manis, Hydrologic Technician Main Center Number
(919) 571-4000 Direct Dial Number
(919) 571-4091 Fax
(919) 571-4041 Cell
(919) 215-0785 II. Objectives
To procure services to dismantle a discontinued data collection station which is a 6’ round ft poured concrete structure with a 4” thick concrete topper and a poured in place concrete base. The structure contains a 30’ below land surface “stilling well” that is the same diameter of the above ground structure and will need to be filled in with an appropriate material to prevent entry. The structure sits approximately 100 feet from the bridge and road nearby. The house is abandoned and poses a hazard to the public. The awarded contractor will be removing the structure and hauling away all debris.
III. Special Requirements
Contractor will be responsible for coordinating for traffic control at the structure site if needed. Work under this contract shall be performed in accordance with the requirements of this Statement of Work, specifications for this contract, and all applicable federal, state and local regulations. It is very important that the successful bidder understand that this project includes removal of debris made by deconstruction.
Filling of 30’ deep stilling well below surface with appropriate material is included in this proposal .
IV. Inspections, certifications and compliance A. Contractor will be responsible for ensuring that all debris will be removed from the site B. Contractor will be responsible for coordinating traffic control for the work site if needed.
C. Contractor will be responsible for returning area to as close to natural as possible.
V. PICTURES
VI. DELIVERIES OR PERFORMANCE
Commencement, Prosecution, and Completion of Work: Normal working hours shall be 7:00am-5:00pm, Monday –Friday. The contractor shall not work Saturdays, Sundays, legal holidays, or non-normal working hours, unless otherwise authorized by the Contracting Officer’s Technical Representative (COTR). Request to work times other than normal hours shall be made in writing. The contractor shall employ sufficient personnel and equipment and order supplies to accomplish the work of this contract within 90 calendar days of the Notice to Proceed.
Progress Schedule: The Contractor shall submit a project schedule to the Contracting Officer’s Representative (COR) for approval within five days after receipt of the Notice to Proceed. The progress schedule shall be a chart, which graphically depicts the proposed sequence to accomplish each work feature or operation. It shall show start dates and completion dates for each event on a horizontal time scale. The progress schedule time scale shall begin with the Notice to Proceed and indicate the number of days to completion. The schedule will be the reference to which the contractor progress and effort are compared.
SPECIAL CONTRACT REQUIREMENTS
List of Subcontractors: For purposes of monitoring compliance with the insurance and payroll reporting requirements of this contract, the contractor shall furnish a list of all subcontractors to the Contracting Officer. This list shall be sent with the performance and payment bonds.
Transporting of Debris and Material: All materials and construction debris shall be removed from the work area and removed from the site daily.
Disposal of debris: All materials and debris shall be disposed of properly by the contractor.
Organization at the site: The site is located inside the Wells Fargo building and access is controlled by the buildings security and building engineer. The location is on the roof of a building and as such all materials should be stored in accordance with the building engineer.
Site Cleanliness: The contractor shall maintain the site free of construction debris in contractor furnished containers (barrels, bags, dumpsters). The contractor maintain cleanliness of the work site by promptly removing debris, tools, and excess material.
Contractor Parking: On street parking is available around the building Environmental Protection: The contractor shall perform all work and activities in accordance with local, state, and federal environmental regulations.
Outages and Interruptions: N/A Notice to the Government of Delays: In the event the contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the contractor shall immediately notify the Contracting Officer, in writing, giving pertinent details. This data shall be informational only in character. Notice under this provision shall not be construed as a waiver by the Government of any delivery schedule or date or any rights or remedies provided by law or under this contract.
Pre-Construction Meeting: The Contractor shall have the project manager available on site for a pre-construction meeting prior to the commencement of work for this project. The COTR will conduct a pre-construction meeting to review the requirements and conditions of this contract.
Additional:
All work listed shall be coordinated with the COTR.
CODES, STANDARDS AND DEPARTMENTAL PUBLICATIONS
The following manuals, handbooks, industry standards and codes are incorporated by reference.
American with Disabilities Act
ANSI/AIHA Z9.5 2003
Building Factory Mutual verification guidance
Construction Specifications Institute Standards DOE Energy Conservation Standards 10 CFR Part 435
Facilities Standards for two public buildings service - GSA PBS-PQ100.1
ICBO Uniform Building Code
National Electrical Code
NFPA, National Fire Codes
NFPA, 101 LIFE SAFETY CODE
NFPA 30
NFPA 45
OSHA 29CFR 1910
Underwriters Laboratories Building Materials Directory
Underwriters Laboratories Fire Resistance Directory
Uniform Federal Accessibility Standards
Uniform Mechanical Code
File details come from the government source that posted it. Updated .