0040581614__02096500_SOW.doc

DOC document 2 MB Posted

Attached to
REMOVAL OF DISCONTINUED GAGE 02081022
Solicitation number
140G0122Q0222
Issued by

View the file

Other files

File Type Posted
Sol_140G0122Q0222_Amd_0002.pdf PDF
Sol_140G0122Q0222_Amd_0001.pdf PDF
DBA_NC20220038.pdf PDF
DBA_NC20220048.pdf PDF
0040581613_02081022_SOW.doc DOC document
DBA_NC_20220065.pdf PDF
DBA_NC20220066.pdf PDF
DBA_NC_20220020.pdf PDF
0040581616__02100500_SOW.doc DOC document
02077303_SOW.doc DOC document
0040581615__02093000_SOW.doc DOC document
Sol_140G0122Q0222.pdf PDF
PR_0040581618_02081000_SOW.doc DOC document
DBA_NC20220064.pdf PDF
B08_Attach_G1_DBA_NC20220064.pdf PDF
0040581617_02108000_SOW.doc DOC document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

I. Project Identification

A.

Title:

Removal of Discontinued concrete block Gage Structure B.

Location:

36( 05’ 14” N, -79( 21’ 58” W

205 Stone Street, Haw River, NC 27258 C.

Local Contact Information:

Mason Manis, Hydrologic Technician Main Center Number

(919) 571-4000 Direct Dial Number

(919) 571-4091 Fax

(919) 571-4041 Cell

(919) 215-0785 II. Objectives

To procure services to dismantle a discontinued data collection station which is an 6’x6’x8’ concrete block house with a placed 4” thick concrete topper. Below the 6’x6’x8’ house is a poured concrete 3’x3’ “stilling well” that is approximately 12’ tall above land surface and 12’ deep below land surface. Overall Total height of structure is 32 ft. There is a concrete retaining wall and footer below the structure near water surface that will also be removed as part of the project. The below land portion will need to be filled in with an appropriate material to prevent entry. The awarded contractor will be removing the structure and hauling away all debris including the attached metal railing, ladders, and platform.

III. Special Requirements

Access to the site is made by a dirt road on the property of the Haw River, NC pump station.

Filling of 12’ deep well below surface with appropriate material is included in this proposal.

Work under this contract shall be performed in accordance with the requirements of this Statement of Work, specifications for this contract, and all applicable federal, state and local regulations. It is very important that the successful bidder understand that this project includes removal of debris made by deconstruction.

IV. Inspections, certifications and compliance A. Contractor will be responsible for ensuring that all debris will be removed from the site.

B. Contractor will be responsible for returning area to as close to natural as possible

V. PICTURES

VI. DELIVERIES OR PERFORMANCE

Commencement, Prosecution, and Completion of Work: Normal working hours shall be 7:00am-5:00pm, Monday –Friday. The contractor shall not work Saturdays, Sundays, legal holidays, or non-normal working hours, unless otherwise authorized by the Contracting Officer’s Technical Representative (COTR). Request to work times other than normal hours shall be made in writing. The contractor shall employ sufficient personnel and equipment and order supplies to accomplish the work of this contract within 90 calendar days of the Notice to Proceed.

Progress Schedule: The Contractor shall submit a project schedule to the Contracting Officer’s Representative (COR) for approval within five days after receipt of the Notice to Proceed. The progress schedule shall be a chart, which graphically depicts the proposed sequence to accomplish each work feature or operation. It shall show start dates and completion dates for each event on a horizontal time scale. The progress schedule time scale shall begin with the Notice to Proceed and indicate the number of days to completion. The schedule will be the reference to which the contractor progress and effort are compared.

SPECIAL CONTRACT REQUIREMENTS

List of Subcontractors: For purposes of monitoring compliance with the insurance and payroll reporting requirements of this contract, the contractor shall furnish a list of all subcontractors to the Contracting Officer. This list shall be sent with the performance and payment bonds.

Transporting of Debris and Material: All materials and construction debris shall be removed from the work area and removed from the site daily.

Disposal of debris: All materials and debris shall be disposed of properly by the contractor.

Organization at the site: The site is located inside the Wells Fargo building and access is controlled by the buildings security and building engineer. The location is on the roof of a building and as such all materials should be stored in accordance with the building engineer.

Site Cleanliness: The contractor shall maintain the site free of construction debris in contractor furnished containers (barrels, bags, dumpsters). The contractor maintain cleanliness of the work site by promptly removing debris, tools, and excess material.

Contractor Parking:

Environmental Protection: The contractor shall perform all work and activities in accordance with local, state, and federal environmental regulations.

Outages and Interruptions: N/A Notice to the Government of Delays: In the event the contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the contractor shall immediately notify the Contracting Officer, in writing, giving pertinent details. This data shall be informational only in character. Notice under this provision shall not be construed as a waiver by the Government of any delivery schedule or date or any rights or remedies provided by law or under this contract.

Pre-Construction Meeting: The Contractor shall have the project manager available on site for a pre-construction meeting prior to the commencement of work for this project. The COTR will conduct a pre-construction meeting to review the requirements and conditions of this contract.

Additional:

All work listed shall be coordinated with the COTR.

CODES, STANDARDS AND DEPARTMENTAL PUBLICATIONS

The following manuals, handbooks, industry standards and codes are incorporated by reference.

American with Disabilities Act

ANSI/AIHA Z9.5 2003

Building Factory Mutual verification guidance

Construction Specifications Institute Standards DOE Energy Conservation Standards 10 CFR Part 435

Facilities Standards for two public buildings service - GSA PBS-PQ100.1

ICBO Uniform Building Code

National Electrical Code

NFPA, National Fire Codes

NFPA, 101 LIFE SAFETY CODE

NFPA 30

NFPA 45

OSHA 29CFR 1910

Underwriters Laboratories Building Materials Directory

Underwriters Laboratories Fire Resistance Directory

Uniform Federal Accessibility Standards

Uniform Mechanical Code

File details come from the government source that posted it. Updated .