PPQ.docx
DOCX document 390 KB Posted
- Attached to
- Multiple Award IDIQ Contract for Architect Engineer Services, GSA Region 9 (AZ, NV, CA, HI) Federal contract opportunity
- Solicitation number
- 47PK0124R0018
About this file
This document is a Request for Qualifications (RFQ) for an Architect-Engineer (A-E) Indefinite Delivery Indefinite Quantity (IDIQ) contract for Region 9 of the General Services Administration (GSA).
The RFQ seeks to award between 3-6 IDIQ contracts per geographic zone covering the states of Arizona, Nevada, California, and Hawaii for comprehensive design services including preparation of construction documents for repair, alteration, tenant improvements, and new construction of federal courthouses and facilities. Key requirements include having an active local office in the applicable zone, meeting small business criteria, demonstrating specialized experience, qualifications of key personnel, past performance, project management and quality control capabilities, and knowledge of local conditions. The IDIQ contracts will have a 1-year base period and four 1-year option periods, with a maximum order limitation of $25 million per contract. Proposals are due by November 1, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 1 47PK0124R0018 2024 10 18.pdf | ||
| SF330-21_Extra Section_C.pdf | ||
| SF330-21_Part_2.pdf | ||
| SF330-21_Extra Section_E.pdf | ||
| SF330-21_Part_1.pdf | ||
| SF330-21_Extra Section_G.pdf | ||
| SF330-21_Part 1 and 2 with Form Instructions.pdf | ||
| SF330-21_Extra Section_H.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PBS PAST PERFORMANCE QUESTIONNAIRE
CONTRACT INFORMATION (Contractor/Offeror to complete Blocks 1-4)
1. CONTRACTOR/OFFEROR INFORMATION
Firm Name:
Address:
| Phone Number: |
| UEI Number: |
Contact Name
| Email Address: : |
| Contact Phone Number: |
2. GENERAL WORK INFORMATION
Work performed as: ☐ Prime Contractor ☐ Sub Contractor ☐ Joint Venture ☐ Other (Please explain):
Percent (%) of project work performed:
If a subcontractor, who was the prime (Name/Phone #):
3. CONTRACT INFORMATION
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: ☐ Firm Fixed Price ☐ Cost Reimbursement ☐ Other (Please explain)
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. PROJECT DESCRIPTION
Complexity of Work: ☐ High ☐ Med ☐ Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
INSTRUCTIONS FOR CLIENTS COMPLETING THIS QUESTIONNAIRE: PBS requests that the client completes this questionnaire and submits it directly back to the offeror. The offeror will submit the completed questionnaire to PBS with their proposal, and may duplicate this questionnaire for future submission on PBS solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to PBS. Please contact the offeror for PBS POC information. The government reserves the right to verify any and all information on this form.
Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.
| RATING |
| DEFINITION |
| NOTE |
| (E) Exceptional |
| Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective. |
| An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified. |
| (VG) Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
| A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified. |
| (S) Satisfactory |
| Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract. |
| (M) Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented. |
| A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner. |
| (U) Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective. |
| An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. |
| (N) Not Applicable |
| No information or did not apply to your contract |
| Rating will be neither positive nor negative. |
TO BE COMPLETED BY CLIENT
CLIENT INFORMATION
Client Point of Contact Information Name:
Title:
Phone Number:
Email Address:
Project Information Contract Type:
Contract Title:
Contract Location:
Describe your role in the project:
Date Questionnaire was completed (mm/dd/yy):
Client’s Signature:
Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance.
| 1. QUALITY: |
| E VG S M U N |
| (a) Quality of technical data/report preparation efforts. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (b) Ability to meet quality standards specified for technical performance. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance). |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| 2. SCHEDULE/TIMELINESS OF PERFORMANCE: |
| E VG S M U N |
| (a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.) |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| 3. CUSTOMER SATISFACTION: |
| E VG S M U N |
| (a) To what extent were the end users satisfied with the project? |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication). |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (d) Overall customer satisfaction. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| 4. MANAGEMENT/ PERSONNEL/LABOR |
| E VG S M U N |
| (a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (b) Ability to hire, apply, and retain a qualified workforce to this effort. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| 4. MANAGEMENT/ PERSONNEL/LABOR - Continued |
| E VG S M U N |
| (c) Government Property Control. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (d) Knowledge/expertise demonstrated by contractor personnel. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (e) Utilization of Small Business concerns. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (f) Ability to simultaneously manage multiple projects with multiple disciplines. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (h) Effectiveness of overall management (including ability to effectively lead, manage and control the program). |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| 5. COST/FINANCIAL MANAGEMENT |
| E VG S M U N |
| (a) Ability to meet the terms and conditions within the contractually agreed price(s)? |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (c) If this is/was a Government cost type contract, or a CMc/CMc at Risk Contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns). |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (d) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in comment section below.) |
| ☐ Yes ☐ No |
| (e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.) |
| ☐ Yes ☐ No |
| (f) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.) |
| ☐ Yes ☐ No |
| 6. SAFETY/SECURITY |
| E VG S M U N |
| (a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.). |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (b) Contractor complied with all security requirements for the project and personnel security requirements. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| 7. GENERAL |
| E VG S M U N |
| (a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues). |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below |
| ☐ ☐ ☐ ☐ ☐ ☐ |
| (c) In summary, provide an overall rating for the work performed by this contractor. |
| ☐ ☐ ☐ ☐ ☐ ☐ |
8. SUSTAINABILITY
| Did this project include sustainable methods, materials, processes or certifications? (See Whole Building Design Guide for acceptable requirements. Link to guide WBDG Green Building Standards and Certification Systems.) (If yes, please explain in the comments section below.) |
| ☐ Yes ☐ No |
9. SUMMARY
| Would you hire or work with this firm again? (If no, please explain in the comments section below.) |
| ☐ Yes ☐ No |
COMMENTS SECTION
Please provide additional information below, and attach additional pages if necessary.
Please provide responses to the above questions (if applicable) and/or additional remarks. Also please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
PBS Past Performance Questionnaire July 2014 image1.png
File details come from the government source that posted it. Updated .